Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Meridian Polymers
(b)Name of the Company / Organisation MERIDIAN POLYMERS
(c)Registered Address Meridan Polymers Sy.No. 169/Part-2, Manhalli Village, Bidar Taluk and Distarict, Karnataka,,Bidar,Karnataka-585257
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Udoye Udoye Rau Sendol Sendol
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Sy. No. 169/Part-2, Manhalli Village, Bidar Taluk and District, Karnataka,,Bidar,Bidar,Karnataka-585257
(d)Pin code 585257
(e)E-mail meridianpolymers1@gmail.com
(f)STD Code. 40(f)Telephone No. 29802967
(g)Fax No. 29802967
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/IND2/72938/2018
(d)Master Proposal Number(Single Window) SW/98106/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. No. 169/Part-2, Manhalli village, Bidar Taluk
(b)Pincode 585403
(c)Bounded Latitudes (North)
From
Degree 17.450881
Minutes
Second
From
Degree 17.451334
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.285518
Minutes
Second
From
Degree 77.285929
Minutes
Second
(e)Survey of India Topo Sheet No. E43R5, E43R6, E43R9 E43R10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 653
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 432
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaBidarBidar
(2.)Uttar PradeshChandauliChandauli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/51/2018-IA-II(I)
(b)Date of Apply of TOR 12 Feb 2018
(c)Date of Issue of TOR / Standard ToR 22 Mar 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :15 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0
At Project Site
State :Karnataka
District :Bidar
Tehsil :Bidar
Village :Manhalli
501. Employment Potential 2. Wastewater discharge 3. Greenbelt developmentOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Purified Carboxy methy Cellulose2000 TPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Purified Carboxy Methyl Cellulose2000Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 24.3
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.53
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.486
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.78
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2665
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2665
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cotton Cellulose1160000Tons per AnnumIndigenousRoad75 Open MarketCopy of Linkage
(2.)Wood Cellulose110000Tons per AnnumIndigenousRoad130 Open MarketCopy of Linkage
(3.)Caustic lye960000Tons per AnnumIndigenousRoad130 Open MarketCopy of Linkage
(4.)ethyl alcohol1160000Tons per AnnumIndigenousRoad25 Open MarketCopy of Linkage
(5.)MONO CHLROACETIC ACID1100000Tons per AnnumIndigenousRoad130 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube19131860
(2.)PM10Micro Gram per Meter Cube453333100
(3.)SO2Micro Gram per Meter Cube1291280
(4.)NOxMicro Gram per Meter Cube1291280
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l1911500500
(2.)TDSmg/l363191500500
(3.)Total Hardnessmg/l22590200200
(4.)Chloridesmg/l10611250250
(5.)pHNA7.946.7978.5
(6.)Fluoridemg/l0.50.2411
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.25B
(2.)BODmg/l2.42B
(3.)pHNA7.317.19B
(4.)CODmg/l1512B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))494755
(2.)Leq(Night)A-weighted decibels(dB(A))353345
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.1550.015
(2.)P(Phosphorus)Percent0.010.001
(3.)Electric ConductivityOthersds/m0.290.1
(4.)K(Potassium)Milligram per Kilogram451133
(5.)pH76.15
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.45 To 17.73
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.69 To 16.46
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1550Copy of Permission LetterPipelineTube WellSr.Go.Gr. wa/2018-19/11211 Sep 2018155
(2.)GroundWater1550.015Copy of Permission LetterPipelineTube WellG.W.B/G.W. No Objection/2019-20/8713 Jun 2019155
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)High TDS and High COD Stream3050Sent to Stripper. Stripper condensate shall be disposed to cement industries for co-processing/TSDF. Stripper bottom is sent to MEE followed by AFTD. Condensate from MEE shall be sent to biological treatment plant followed by RO. RO rejects are sent to MEE and permeate is reused in cooling towers make-upReuse within the Plant & Recycling30
(2.)Low TDS and COD Stream34.585Along with condensate from MEE and ATFD of High TDS and COD treatment method sent to Biological Treatment System followed by RO. RO permeate reused for cooling towers and boiler makeup. RO rejects are sent to MEEReuse within the Plant & Recycling34.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 64.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 64.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ash from BoilerBottom Ash3780Tons30RoadOthersSent to Brick Manufactures
(2.)Stripper DistillateHazardous Waste (as per Hazardous and Other Waste Management rules 2016)165.6Kilolitre150RoadCo-Processing
(3.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)14.4Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Solvent ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)684Tons150RoadOthersSent to TSDF or Cement Plants for Co-Processing
(5.)Waste OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.65Kilolitre30RoadAuthorized Recyclers
(6.)Spent solventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16200Tons0RoadOthersRecovered within plant premises and reused
(7.)Evaporation SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1332Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube452.30.045.04100
(2.)PM2.5Microgram per Meter Cube182.30.018.0360
(3.)SO2Microgram per Meter Cube122.30.112.1180
(4.)NOxMicrogram per Meter Cube122.30.112.1260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)6TPH BoilerCoal300.9PM100.6 g/s
(2.)6TPH BoilerCoal300.9SO20.7 g/s
(3.)6TPH BoilerCoal300.9NOx0.25 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1400
(b)Source BESCOM
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x500 kVA DG Sets
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.214
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.214
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Lease for 25 years: Area 1.214 ha 1.214
    Total (ha.) 1.214
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.404
Total (ha.) 0.404
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0No WLS within 10 km of Study Area
(2.)Wildlife CorridorsNA0No Wildlife Corridors within 10 km Study Area
(3.)Critically Polluted AreaNA0No Critically Polluted Area within 10 km of Study Area
(4.)ESAsNA0No ESAs within 10 km Study Area
(5.)CorridorsNA0No Corridors within 10 km Study Area
(6.)NPANA0No NPA within 10 km of Study Area
(7.)ESZsNA0No ESZs within 10 km Study Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestHonnadi RF4.6In West Direction
(2.)OthersReserve Forest 2Kalbemal RF6.9In North Direction
(3.)Archaeological SitesNA0No Archaeological Sites within 10 km Study Area
(4.)Defence InstallationsNA0No Defence Installations within 10 km Study Area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.214
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Madhura Canal Stream
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 4.4
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 20
(e)No. of working days 360
(f)Total Manpower 190
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.404
(b)Percentage of Total Project Area 33.28
(c)No. of Plants to be Planted 750
(d)Funds Allocated for Plantation 300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployement Potential
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0077
(ii)Name of the EIA Consultant Team Labs and Consultants
(iii)Address TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038
(iv)Mobile No. 0402374855
(v)Landline No. 0402374855
(vi)Email Id teamlabs@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are in conformity with permitted land use of the area. The same needs to be confirmed along with the supporting documents. Whether such polluting units would be allowed by the SPCB in the non-industrial area. - Justification for applicability of the EIA Notification, 2006 to the proposed project/activity. - Permission from the concerned regulatory authority for ground water withdrawal of 155 cum/day. 23 Mar 2019
2.NAThe correction have been made as per the instruction received 18 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantUdoye Udoye Rau Sendol Sendol
DesignationMD
Name of Company (Applicant Name should not be given here)MERIDIAN POLYMERS
AddressMeridan Polymers Sy.No. 169/Part-2, Manhalli Village, Bidar Taluk and Distarict, Karnataka
Print