Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kochi Water Metro Project
(b)Name of the Company / Organisation KOCHI METRO RAIL LIMITED
(c)Registered Address GRAM PANCHAYAT KADENAR TAHSIL - BIJAPUR DISTRICT - BIJAPUR,,Bijapur,Chhattisgarh-494444
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajith A Nair
(b)Designation (Owner/ Partner/ CEO) Additional General Manager
(c)Address Kochi Metro Rail Ltd, Corporate Office, JNL Metro station, 4th Floor, Kaloor, Ernakulam -682017,,,Ernakulam,Kerala-682017
(d)Pin code 682017
(e)E-mail watermetro@kmrl.co.in
(f)STD Code. 484(f)Telephone No. 2826700
(g)Fax No. 04842380686
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/KL/MIS/63548/2017
(d)Master Proposal Number(Single Window) SW/98122/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Cheranalloor G.P, Kadamakudy G.P., Mulavukad G.P,
(b)Pincode 682011
(c)Bounded Latitudes (North)
From
Degree 76.243786
Minutes
Second
From
Degree 76.367652
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 10.076384
Minutes
Second
From
Degree 9.908869
Minutes
Second
(e)Survey of India Topo Sheet No. C43K4, C43Q5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1.4
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.6
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KeralaErnakulamParavur
(2.)KeralaErnakulamKochi
(3.)KeralaErnakulamKanayannur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number F.No. 10-39/2017-IA-III
(c)Date of Apply of TOR 15 Apr 2017
(d)Date of Issue of TOR / Standard ToR 18 Aug 2017
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Jul 2018
Distance of Public Hearing Venue from the Proposed Project :1
Collectorate Conference Hall, Kakkanad
State :Kerala
District :Ernakulam
Tehsil :Kanayannur
Village :Kakkanad
61Majority people welcomed the projectDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Passenger Boat and terminalBoat Terminal
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)NA0OthersNARoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 819
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.83
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 54
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.33
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)CONSTRUCTION MATERIAL0OthersNA0Road40 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 08 Jan 2018 To 31 Mar 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube16668.2165.1100
(2.)PM2.5Micro Gram per Meter Cube91.818.887.660
(3.)OthersCOMili Gram per Meter Cube9.12.38.84
(4.)SO2Micro Gram per Meter Cube00080
(5.)NOxMicro Gram per Meter Cube17.82.41780
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.816.36.58.5
(2.)TSSmg/l22.46.400
(3.)TDSmg/l76191275002000
(4.)Total Hardnessmg/l147973.4200600
(5.)Chloridesmg/l584116.52501000
(6.)Fluoridemg/l0.280.121.01.5
    14.3.     No. of Surface Water monitoring locations : 41
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l5.24.5E
(2.)pHNA8.17.7E
(3.)DOmg/l5.64.5E
(4.)BODmg/l3.22.7E
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.256.265
(2.)Leq(Night)A-weighted decibels(dB(A))52.240.055
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.26.08
(2.)K(Potassium)Percent1.70.019
(3.)Electric ConductivityOthersMicrosiemens per centimeter20022
(4.)P(Phosphorus)Percent0.0510.017
(5.)N(Nitrogen)Percent0.160.05
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.6 To 0.6
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.6 To 0.6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface142.50.1 Not Appliacble PipelineOthersPipelineNA04 Feb 2019142.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic113113Septic TankOthersGround water recharge0113
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 113
(b)Total Discharged Water (Kilolitre per Day) 113
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal WasteMunicipal Solid Waste150Tons10RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube0000.10
(2.)PM2.5Microgram per Meter Cube0000.10
(3.)SO2Microgram per Meter Cube0000.10
(4.)NOxMicrogram per Meter Cube0000.10
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
(2.)NANA00NOx0
(3.)NANA00SO20
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 56314
(b)Source KSEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) At each terminal
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 4.21
(c)Government Land (ha.) 5.3
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9.51
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1147
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 39282
(e)Settlements (ha.) 15736
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open land 24995
    Total (ha.) 81160
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area1.92
(2.)Green belt1.15
(3.)OthersOpen/circulation area6.44
Total (ha.) 9.51
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSMangalavanam Bird Sanctuary0.5-
(2.)Critically Polluted AreaNil0-
(3.)CorridorsNil0-
(4.)Wildlife CorridorsNil0-
(5.)NPANil0-
(6.)ESAsNil0-
(7.)ESZsNil0-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesMattancherry Palace0.1NOC Obtined
(2.)ForestNil0-
(3.)Defence InstallationsKochi Naval Base1-
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Selec
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 98
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.68
(b)Land yet to be acquired(Ha) 7.83
(c)Status of Land acquisition if not acquired Submitted to govt for administrative sanctionUnder
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 12
(b)No. of Households 5
(c)No. of PDFs (Project Displaced Families) 5
(d)No. of PAFs (Project Affected Families) 5
(e)Funds Allocated for R&R(in INR) (in Lacs) 31.74
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Project is proposed in the Channels of National Waterways-3, Vembanad lake and Ernakulam channel
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 300
(c)Temporary Employment- During Construction 400
(d)Temporary Employment- During Operation 400
(e)No. of working days 365
(f)Total Manpower 1120
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.15
(b)Percentage of Total Project Area 12.09
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 2000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification II
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any No
(d)Area of Mangroves Land (hectare)
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies Attached in EIA Report
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 01 Feb 2018
(iv)Period of Study To (EIA Terrestrial) 05 Feb 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies Attached in EIA Report
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 01 Feb 2018
(iv)Period of Study to (EIA Marine) 30 Mar 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Disaster Management plan prepared and
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing (IRS) Anna University,
(ii)Please Specify with salient features 45 passenger Jetty Terminal
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity II
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed Alteration of Elamkunnapuzha Terminal, Dumping in
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) Described in EIA Repoprt
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 9
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 45
(d)Total plot area (sqm) 95107
(e)Total built up area (sqm) 19205
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Passenger
(d)Quantity of Cargo 0
(e)Control Measures of Cargo 0
(f)Dust Control Measures 0
(g)Quantum 0
(h)Quantity of Dredging (Cubic meter per day) 649367
(i)Type of Dredging Capital
(j)Disposal of Dredge Material Land and deep sea
(k)Details of Outfall Diffusers 0
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 0
(n)Details of Monitoring at Outfall 0
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 0
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 50
(c)Quantity 12650
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Nil
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 163
(ii)Name of the EIA Consultant WAPCOS Limited
(iii)Address 76 – C, Institutional Area, Sector – 18, Gurgaon - 122015
(iv)Mobile No. 9811487830
(v)Landline No. 0124239739
(vi)Email Id environment@wapcos.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRecommendation of KCZMA on the revised proposal. 17 Jun 2019
2.NA

kindly see the minutes of the 41st EAC infra-II held on 27-29 May 2019

11 Jun 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjith A Nair
DesignationAdditional General Manager
Name of Company (Applicant Name should not be given here)KOCHI METRO RAIL LIMITED
AddressM/s Kochi Metro Rail Limited (A Joint venture company of Govt. of India & Govt. of Kerala) 8th Floor, Revenue Tower, Park Avenue, Kochi, Kerala-682011.
Print