1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Integrated Project of Sugar Plant Expansion (5000 to 7500 TCD), Ethanol Plant Expansion (30 to 100 KLPD) with Incineration Boiler/TG /Auxiliaries for ZLD & Cogeneration Power Plant (44 MW) | (b)Name of the Company / Organisation | PADMABUSHAN KRANTIVEER DR NAGNATH ANNA NAYAKAWADI HUTATMA KISAN AHIR SAHAKARI SAKHAR KARKHANA LTD | (c)Registered Address | Tal: Walwe, Dist: Sangli,,Sangli,Maharashtra-416313 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Narendra Laxmanrao Kapadnis | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | Padmabushan Krantiveer Dr Nagnath Anna Nayakawadi Hutatma Kisan Ahir Sahakari Sakhar Karkhana Ltd,Tal: Walwe, Dist: Sangli
Pincode: 416313,Walwa,Sangli,Maharashtra-416313 | (d)Pin code | 416313 | (e)E-mail | ast_hkl@bsnl.in | (f)STD Code. | 2342(f)Telephone No. | 267540 | (g)Fax No. | 267539 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/MH/IND2/98116/2013 | (d)Master Proposal Number(Single Window) | SW/98110/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 149/1B+1B+1C+1D, 166, 169/9, 177/6A, 870/1, 177/6B | (b)Pincode | 416310 | (c)Bounded Latitudes (North) | | From | | Degree | 17.02 | Minutes | | Second | | From | | Degree | 74.37 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 17.018 | Minutes | | Second | | From | | Degree | 74.37 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47K/8, 47L/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 564 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/197/2013-IA-II (I) | (c)Date of Issue of TOR | 14 Nov 2013 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 02 Apr 2019 | (c)Date of Issue of EC | 22 Feb 2017 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 12 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.250 |
| Factory site, Nagnathnagar, Walwe | State : | Maharashtra | District : | Sangli | Tehsil : | Walwa | Village : | Nagnathannanagar |
| 90 | Questioning on Water pollution and air pollution sources, Ash disposal and its management | Others | Additional district Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-436/RON/2017-NGP/4870 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Nov 11 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Distillery | 30 | 70 | 100 | Kilo Litre per Day(KLD) | | Road | | (2.) | Sugar crushing | 5000 | 2500 | 7500 | Tons Crushed per Day(TCD) | | Road | | (3.) | Power | 0 | 44 | 44 | Mega Watt(MW) | | Road,Others | Local MSEDC grid | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Sugar-Distillery-Cogen | Rectangular | Rectangular | Rectangular | NA | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 23 Aug 2018 | (iv)Valid Upto | 31 Aug 2019 | (v)File No. | F-1.0/BO/CAC-CELL/UAN NO. 0000028472/R/CAC-1808000 | (vi)Application No. | 0000029984 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 574.38 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.87 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.373 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 280 | (b)Existing quantity of raw material/fuel | 120 | (c)Total quantity of raw material/fuel | 400 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Molasses | 400 | Others | TPD | NA | Road | | 50 | Open Market | | Copy of Linkage | (2.) | Coal | 384 | Others | TPH | NA | Road | | 150 | Others | NA | Copy of Linkage | (3.) | Sugar cane | 7500 | Tons Crushed per Day | | NA | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 Mar 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 54.6 | 36.9 | 48.6 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 32.6 | 18.2 | 32.5 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 19.4 | 9.6 | 12.7 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 14.1 | 6.1 | 9.3 | 80 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 8 | 2 | . | . | (2.) | TDS | | | mg/l | | 5903 | 698 | 500 | 2000 | (3.) | Heavy Metals | | Hexavalent Chromium | mg/l | | 0 | 0 | . | . | (4.) | pH | | | NA | | 7.65 | 7.38 | 6.5 | 8.5 | (5.) | Total Hardness | | | mg/l | | 1341 | 360 | 200 | 600 | (6.) | Fluoride | | | Others | ppm | 0 | 0 | 1.0 | 1.5 | (7.) | Chlorides | | | mg/l | | 2020 | 27.5 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.8 | 6.4 | C | (2.) | pH | | NA | | 7.3 | 7.2 | C | (3.) | BOD | | mg/l | | 10 | 4 | C | (4.) | COD | | mg/l | | 37 | 15 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.5 | 42.6 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42 | 39.5 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 213 | 175.3 | (2.) | P(Phosphorus) | Kilogram per hectare | | 7.12 | 5.8 | (3.) | K(Potassium) | Kilogram per hectare | | 275 | 212 | (4.) | pH | | | 8 | 7.4 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 678 | 459 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.35 To 16.45 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1090 | 2 | Copy of Permission Letter | Pipeline | | Jack Well | | 6074 | 21 Nov 2003 | 1267 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process condensate | 430 | 430 | aerobic and anaerobic | Reuse within the Plant & Recycling | | 430 | | (2.) | sugar unit waste water | 700 | 800 | Aerobic | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 700 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1130 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1130 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Coal ash | Bottom Ash | | 10320 | Tons | 0 | Road | | Others | Sent to Brick manufacturing | (2.) | Pressmud | Industrial Waste | | 48000 | Tons | 0.2 | Road | | Others | Press mud will be sold to the farmer as manure. | (3.) | Bagasse ash | Industrial Waste | | 38400 | Tons | 0 | Road | | Others | Bagasse ash will be sold to farmer as manure | (4.) | Spent wash ash | Bottom Ash | | 9000 | Tons | 0.1 | Road | | Others | Brick manufacturer | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 54.6 | 0.6 | 0.19 | 54.8 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 30.6 | 0.6 | 0 | 31 | 60 | (3.) | NOx | | Microgram per Meter Cube | 18.7 | 80 | 1.71 | 20.5 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 14.1 | 0.6 | 6.0 | 20.2 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 220 TPH and 40 TPH boiler | Bagasse, Cpn. SW and Coal | 72 | 3.5 | SO2 | | 6 | (2.) | 220 TPH and 40 TPH boiler | Bagasse, Conc. SW and Coal | 72 | 3.5 | NOx | | 1.71 | (3.) | 220 TPH and 40 TPH boiler | Bagasse, Conc. SW, Coal | 72 | 3.5 | PM10 | | 0.19 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 9.3 | (b)Source | Own TG | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 X 1000 | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 25.9 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 25.9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 8186 | (b)Waste/Barren Land (ha.) | 14251 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 294 | (e)Settlements (ha.) | 1148 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : vegetation | 7511 | Total (ha.) | 31390 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.8 | Sugar+ Cogen+Distillery Existing and proposed | (2.) | Green belt | | 8.5 | Existing and Proposed | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | ESZs | NA | 0 | NA | (3.) | Corridors | NA | 0 | NA | (4.) | NPA | NA | 0 | NA | (5.) | ESAs | NA | 0 | NA | (6.) | Critically Polluted Area | NA | 0 | NA | (7.) | Wildlife Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | na | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Others | NA | NA | 0 | NA | (4.) | Forest | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Krishna river | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 2.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 10 | (e)No. of working days | 300 | (f)Total Manpower | 80 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 20.71 | 1.36 | 22.07 | (2.) | Percentage of Total Project Area | 32 | 1 | 33 | (3.) | No. of Plants | 6000 | 600 | 6600 | (4.) | Funds Allocated | 3.5 | 15 | 18.5 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | A large demand is anticipated for alcohol as a fuel. Alcohol is an eco-friendly product and is a substitute to the imported petroleum.
• Factory proposes zero liquid discharge method for waste water treatment. Maximum waste water will be recycled back into the system. | (2.) | Social | • The industry is in the rural region and economically backward. Creation of job opportunity and other business activity will improve the economy and attitude of the public towards education and health. This may result in the creation of additional education and health care facilities in this rural area. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0075 | (ii)Name of the EIA Consultant | MITCON Consultancy & Engineering Services Ltd. | (iii)Address | Environment Management and Engineering Division Behind DIC Office, Agri College Campus, Shivajinagar, Pune 411 005, Maharashtra (INDIA) | (iv)Mobile No. | 9665043400 | (v)Landline No. | 0226628940 | (vi)Email Id | eme@mitconindia.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 17 Mar 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Details of ECs dated 17/9/2017 & 22/2/2017 to be mentioned in column 6 of Form-2.
- Co-gen power plant of 24 MW (as per the EC dated 22/2/2017) was supposed to operate along with operation of the distillery. In view of the same yet to be established, present system needs to be explained. Also, the said power plant still a part of the approved scope of work (EC dated 22/2/2017), details in this regard need to be corrected accordingly in Form-2. | 24 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 02 Apr 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Submission of clarification as per 8th EAC dated 30.05.2019 for proposed integrated project of sugar plant expansion and ethanol plant expansion with incineration boiler/TG/ Auxiliaries for ZLD & Co-generation Power plant | 29 Jun 2019 | 2. | NA | The EAC, after deliberations, desired for clarification/inputs in respect of the following:- ?Details of existing products and utilities commissioned/not commissioned as per the existing ECs. ?Action Taken Report on non complied points reflected in the certified compliance report, to be forwarded by the Regional Office of the Ministry. ?Approval from PESO for the site and layout plan for storage facilities. ?Plan for achieving ZLD for the entire unit, with Incineration route Plan for Corporate Environment Responsibility. The proposal was deferred for the needful. | 12 Jun 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Narendra Laxmanrao Kapadnis | Designation | Managing Director | Name of Company (Applicant Name should not be given here) | PADMABUSHAN KRANTIVEER DR NAGNATH ANNA NAYAKAWADI HUTATMA KISAN AHIR SAHAKARI SAKHAR KARKHANA LTD | Address | Tal: Walwe, Dist: Sangli |
|