1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Premium Island Resort at Lalaji Bay, Long Island | (b)Name of the Company / Organisation | ANDAMAN AND NICOBAR ISLANDS INTEGRATED DEVELOPMENT CORPOARTION | (c)Registered Address | ANIIDCO Ltd
Vikas Bhawan
Port Blair,,South Andaman,Andaman and Nicobar-744101 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mohammed Pervaiz | (b)Designation (Owner/ Partner/ CEO) | GeneralManager | (c)Address | ANIIDCO Ltd Vikash Bahwan,PO 180 Port Blair,Port Blair,Andamans,Andaman and Nicobar-744101 | (d)Pin code | 744101 | (e)E-mail | aniidco@gmail.com | (f)STD Code. | 0(f)Telephone No. | 232098 | (g)Fax No. | 232501 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(a) Building and Construction projects
| Minor Activity | 8(a) Building and Construction projects
| (b)Category | B1 | Reason for Applying at Ministry | Other | Other Reason for Applying at Ministry | Project involves CRZ clearance | (c)Proposal Number | IA/AN/MIS/97931/2019 | (d)Master Proposal Number(Single Window) | SW/97925/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 1/1, 1/1/1, 1/2 long Island | (b)Pincode | 744203 | (c)Bounded Latitudes (North) | | From | | Degree | 12.404164 | Minutes | | Second | | From | | Degree | 12.414240 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 92.943714 | Minutes | | Second | | From | | Degree | 92.949797 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 86D/15/5 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 2 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andaman and Nicobar | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | No | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Building and Construction Project | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Desalination Plant | 240 KLD | | (2.) | Solar Power Plant | 2.4 MW | | (3.) | Diesel Power Plant | 0.6 MW | | (4.) | Floating Jetty | 1 No | | (5.) | Sewage Treatment Plant | 255 KLD | | (6.) | Rain Water Harvesting | 210 KLD / 76 ML annually | | (7.) | Resort | 220 keys | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Biodegradable waste | 122.4 | Tons per Annum | | Others | Treated Onsite | (2.) | Residue (Non-Biodegradable) | 2.4 | Tons per Annum | | Others | Sea | (3.) | Waste Water | 293 | Kilo Litre per Day | | Pipe Conveyor | | (4.) | Recyclable Waste (Non-Biodegradable) | 81.6 | Tons per Annum | | Others | Sea | (5.) | Oil and Grease | 1.8 | Tons per Annum | | Others | Sea | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 379 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 4.43 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.90 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.55 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | PreCast Concrete | 0 | Tons per Annum | | 0 | Others | Sea | 0 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 26 Feb 2019 To 10 Mar 2019 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 28 | 12 | 28 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 54 | 28 | 54 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 0 | 0 | 0 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 80 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 16 | 9 | 250 | 1000 | (2.) | Fluoride | | | mg/l | | 0.12 | 0 | 1 | 1.5 | (3.) | pH | | | NA | | 7.6 | 7.3 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 4 | 0 | 0 | 0 | (5.) | TDS | | | mg/l | | 468 | 278 | 500 | 2000 | (6.) | Total Hardness | | | mg/l | | 386 | 218 | 200 | 600 | (7.) | Heavy Metals | | Iron | mg/l | | 0.09 | 0.01 | 0.3 | 0.3 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 0 | 0 | B | (2.) | BOD | | mg/l | | 0 | 0 | B | (3.) | pH | | mg/l | | 0 | 0 | B | (4.) | DO | | mg/l | | 0 | 0 | B | |
14.4. No. of Ambient Noise monitoring locations : 2 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 24 | 22 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 20 | 18 | 55 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.4 | 5.8 | (2.) | K(Potassium) | Milligram per Kilogram | | 118 | 94 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 320 | 190 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 126 | 104 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 210 | 116 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 1.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 1.2 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 532 | 0.5 | Copy of Permission Letter | Pipeline | | Intake Well | | 0 | 07 Mar 2019 | 532 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 240 | (c)Quantity of Brine (KLD) | 293 | (d)Mode of Disposal of Brine | Pipeline with Multi-Port Diffuser | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Waste Water | 204 | 255 | STP | Reuse within the Plant & Recycling | | 204 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 204 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 204 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Biodegradable | Municipal Solid Waste | | 122.4 | Tons | 0 | Others | In-situ Treatment | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Non-Biodegradable | Municipal Solid Waste | | 81.6 | Tons | 25 | Others | Sea | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 0 | 0.05 | 1 | 2 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 54 | 0.05 | 5 | 60 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 28 | 0.05 | 3 | 32 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 0 | 0.05 | 1 | 2 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2400 | (b)Source | Solar Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0.6 MW Diesel Power Plant | (e)Stack Height (in m) | 15 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 42.2 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 42.2 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Revenue Land | 42.2 | Total (ha.) | 42.2 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 3.96 | Total built up area requirement | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | NA | (2.) | WLS | NA | 0 | NA | (3.) | NPA | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | Wildlife Corridors | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Lalaji Bay RF | 0 | RF area is outside the Project area | (2.) | Archaeological Sites | | NA | 0 | NA | (3.) | Defence Installations | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 42.2 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | - | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Andaman Sea | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 220 | (d)Temporary Employment- During Operation | 200 | (e)No. of working days | 365 | (f)Total Manpower | 440 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 16.88 | (b)Percentage of Total Project Area | 40.00 | (c)No. of Plants to be Planted | 1000 | (d)Funds Allocated for Plantation | 2000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | III | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | NA | (d)Area of Mangroves Land (hectare) | 0 | (e)EIA (Terrestrial) Studies | Not Carried Out | (i)Give Reason | As theproject falls under building and constructio | (f)EIA (Marine) Studies | Not Carried Out | (i)Give Reason | As theproject falls under building and constructio | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | Disaster Management Plan has been prepared | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Resort/Buildings/Civic Amenities | (i)Agency Name for Preparing CRZ Maps | NCSCM | (ii)Total Area/Built-up Area (hectare) | 39600 | (iii)Height of Structure | 9 | (iv)FSI Ratio | 0.094 | (v)The governing Town Planning Rules/Regulations | Andaman Panchayat Regulations 1984 | (vi)Details of Provision of Car Parking Area | 50 | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | III | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 50 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 100 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | No | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | No | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | Project is Recommended by following safety measure | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | EMP report uploaded | |
|
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 9 | (b)Total No. of Flats to be Build | 220 | (c)No. of Buildings | 1 | (d)Total plot area (sqm) | 422000 | (e)Total built up area (sqm) | 39600 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 220 | (b)Capacity | 15000 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 50 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | solar | (b)Percentage | 80 | (c)Quantity | 2.4 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 163 | (ii)Name of the EIA Consultant | WAPCOS LIMITED | (iii)Address | 76C, Institutional Area, Sector 18, Gurugram - 122015, Haryana | (iv)Mobile No. | 9811487830 | (v)Landline No. | 0124239739 | (vi)Email Id | environment@wapcos.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 01 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per EIA Notification, 2006 and its amendments, project falls under item 8(a) of the schedule to the Notification shall be appraised based on the Form 1, 1-A and Conceptual plan. Kindly submit/upload requisite documents along with SCZMA recommendation and plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. | 22 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 29 Apr 2019 | 3. | NA | Form-1 submitted/uploaded is not in the prescribed format given in EIA Notification, 2006. Conceptual Plan is also not submitted. Please submit/upload Form-1 as prescribed in the EIA Notification, 2006. Also submit/upload conceptual Plan and revised CER Plan as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. | 23 May 2019 | 4. | NA | The correction have been made as per the instruction received | 25 May 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Compliance of 42nd EAC (Infra-2) MoM for Long Island Project, Andaman and Nicobar Islands | 27 Aug 2019 | 2. | ADS Reply Letter | Compliance of 42nd EAC (Infra-2) MoM for Long Island Project, Andaman and Nicobar Islands | 27 Aug 2019 | 3. | ADS Reply Letter | Compliance of 42nd EAC (Infra-2) MoM for Long Island Project, Andaman and Nicobar Islands | 27 Aug 2019 | 4. | NA | Kindly see the final Minutes of the 42nd EAC (Infra-2) metting held during 10-12 July, 2019 | 26 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mohammed Pervaiz | Designation | GeneralManager | Name of Company (Applicant Name should not be given here) | ANDAMAN AND NICOBAR ISLANDS INTEGRATED DEVELOPMENT CORPOARTION | Address | ANIIDCO Ltd
Vikas Bhawan
Port Blair |
|