1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | The Andhra Sugars Ltd (Chemicals and Fertilizers Division) | (b)Name of the Company / Organisation | THE ANDHRA SUGARS LIMITED, CHEMICALS & FERTILISERS DIVISION | (c)Registered Address | The Andhra Sugars Limited, Chemicals and Fertilisers Division,Kovur, West Godavari District,Andhra Pradesh,West Godavari,Andhra Pradesh-534350 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sri Narendranath Chowdary P | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | The Andhra Sugars Limited,Chemicals and Fertilisers Division,Sy. no.132-134 and 137, Saggonda Village, Gopalapuram Mandal, West Godavari District, Andhra Pradesh.,,Gopalapuram,West Godavari,Andhra Pradesh-534318 | (d)Pin code | 534318 | (e)E-mail | info.kvr@theandhrasugars.com | (f)STD Code. | 881(f)Telephone No. | 231597 | (g)Fax No. | 231218 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(d) Chlor-alkali industry 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/IND2/97871/2017 | (d)Master Proposal Number(Single Window) | SW/97865/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy. No. 132, 133, 134 and 137 Saggonda Village, Go | (b)Pincode | 534318 | (c)Bounded Latitudes (North) | | From | | Degree | 17.1028 | Minutes | | Second | | From | | Degree | 17.1109 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 81.3641 | Minutes | | Second | | From | | Degree | 81.3747 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E44P11 (65G11) and E44P12 (65G12) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 48 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 97.36 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/83/2017-IA-II (I) | (c)Date of Issue of TOR | 31 May 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 16 Apr 2019 | (c)Date of Issue of EC | 13 Aug 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At Project Site | State : | Andhra Pradesh | District : | West Godavari | Tehsil : | Gopalapuram | Village : | Saggonda |
| 150 | 1. Employement
2. Village Development | Others | District Revenue Office | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/455/AP/1377 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Aug 14 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Caustic Soda (Category: 4(d)- Chlor Alkali) | 400 | 400 | 800 | Others | Tons Per Day | Road | | (2.) | Caustic Potash (Category: 4(d)-Chlor Alkali) | 0 | 100 | 100 | Others | Tons Per Day | Road | | (3.) | Liquid Chlorine (Category:4(d)-Chlor Alkali) | 240 | 4 | 244 | Others | Tons Per Day | Road | | (4.) | Chloroform (Cat 5(f) Synthetic Org Chemicals) | 0 | 56 | 56 | Others | Tons Per Day | Road | | (5.) | Monochloro Aceticacid (Cat 5(f) Syn Org Chemicals) | 0 | 20 | 20 | Others | Tons Per Day | Road | | (6.) | Chlorinatted Paraffin Wax52%(Cat 5(f) Syn OrgChem) | 0 | 20 | 20 | Others | Tons Per Day | Road | | (7.) | Methyl Chloride(Cat 5(f) Synthetic Org Chemicals) | 0 | 10 | 10 | Others | Tons Per Day | Road | | (8.) | Caustic Soda Flakes (Category: 4(d)-Chlor Alkali) | 140 | 140 | 280 | Others | Tons Per Day | Road | | (9.) | Methylene Chloride (5(f) Synthetic OrgChemicals) | 0 | 61 | 61 | Others | Tons Per Day | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Non EC Products Unit | 390 Tons | 0 | 390 Tons | | (2.) | chlor Alkali | 400 TPD | 500 TPD | 900 TPD | | (3.) | Synthetic Organic Chemicals | 0 | 167 TPD | 167 TPD | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 20 Nov 2015 | (iv)Valid Upto | 30 Nov 2019 | (v)File No. | APPCB/VSP/RJY/449/CFO/HO/2015 | (vi)Application No. | APPCB/VSP/RJY/449/CFO/HO/2015 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 800 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 24 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 4 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1018.8 | (b)Existing quantity of raw material/fuel | 599.22 | (c)Total quantity of raw material/fuel | 1618.02 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sodium Chloride | 411120 | Tons per Annum | TPD | Indigenous | Road | | 40 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 Mar 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 22 | 14 | 22 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 15 | 9 | 15 | 80 | (3.) | Others | VOC in PPM | NA | 5.2 | 0.3 | 5.1 | NA | (4.) | NOx | | Micro Gram per Meter Cube | 15 | 9 | 15 | 80 | (5.) | PM10 | | Micro Gram per Meter Cube | 53 | 33 | 53 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.04 | 6.91 | 7 | 8.5 | (2.) | TSS | | | mg/l | | 399 | 176 | 500 | 500 | (3.) | TDS | | | mg/l | | 1750 | 388 | 500 | 500 | (4.) | Total Hardness | | | mg/l | | 700 | 195 | 200 | 200 | (5.) | Fluoride | | | mg/l | | 0.4 | 0.14 | 1 | 1 | (6.) | Chlorides | | | mg/l | | 514 | 110 | 250 | 250 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.5 | 5.3 | B | (2.) | BOD | | mg/l | | 2 | 2 | B | (3.) | COD | | mg/l | | 11 | 10 | B | (4.) | pH | | NA | | 7.61 | 7.6 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 58 | 38 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 61 | 48 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Percent | | 0.012 | 0.004 | (2.) | Electric Conductivity | Others | ds/m | 0.29 | 0.093 | (3.) | K(Potassium) | Milligram per Kilogram | | 360 | 133 | (4.) | N(Nitrogen) | Percent | | 0.09 | 0.03 | (5.) | pH | | | 6.45 | 6.08 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.82 To 12.95 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.52 To 14.96 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 6951.5 | 4 | Copy of Permission Letter | Pipeline | | Intake Well | | CE/GDS/DWM/OT1/AEE1/5500 | 13 Dec 2018 | 15000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent from Chlor Alkali Chloromethanes | 1265 | 1600 | ZLD System | Reuse within the Plant & Recycling | | 1265 | | (2.) | Effluent from MCA Plant | 9.5 | 10 | Dechlorination followed by Stripping, evaporation and drying | Reuse within the Plant & Recycling | | 9.5 | | (3.) | Domestic Wastewater | 82 | 120 | Sewage Treatment Plant | Green Belt Renewal Plant | | 82 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1356.5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1356.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Saturated Mud (Dry Basis) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 468 | Tons | 1.2 | Road | | Others | Sent to Secured Landfill within plant premises | (2.) | Sulphur Sludge | Industrial Waste | | 100 | Tons | 30 | Road | | Others | Used in SSP Production at Kovvur Unit | (3.) | Waste Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 8.3 | Kilolitre | 0.2 | Road | | Others | Used in Heating Furnace | (4.) | Gypsum | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 540 | Tons | 150 | Road | | Others | Sent to TSDF or Cement Plants for Co-processing | (5.) | Organic Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1116 | Tons | 150 | Road | | Others | Sent to TSDF or Cement Plants for Co-processing | (6.) | Ash from Boilers | Bottom Ash | | 6660 | Tons | 40 | Road | | Others | Sent o Cement and Brick Manufacturers | (7.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Tons | 1.2 | Road | | Others | Sent to Secured Landfill within plant premises | (8.) | Evaporation Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 180 | Tons | 1.2 | Road | | Others | Sent to Secured Landfill within plant premises | (9.) | Spent Catalyst | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.4 | Tons | 203 | Road | | Others | Sent to TSDF Facility at Parwada | (10.) | KCl Brine Sludge (Dry Basis) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 900 | Tons | 1.2 | Road | | Others | Sent to Secured Landfill within plant premises | (11.) | Spent Sulfuric Acid | Industrial Waste | | 4248 | Kilolitre | 30 | Road | | Others | Sen to SSP Production for Kovvur Unit | (12.) | Brine Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 7920 | Tons | 1.2 | Road | | Others | Sent to Secured Landfill within plant premises | (13.) | Aluminium Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 486 | Tons | 1.2 | Road | | Others | Sent to Secured Landfill within plant premises | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 18 | 3.3 | 0.0 | 18.02 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 11 | 3.3 | 0.0 | 11.01 | 80 | (3.) | NOx | | Microgram per Meter Cube | 11 | 3.3 | 0.0 | 11.08 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 46 | 3.3 | 0.0 | 46.05 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 25 TPH Boiler | Husk or Coal | 40 | 2 | SO2 | | 3.2 g/s | (2.) | 25 TPH Boiler | Husk or Coal | 40 | 2 | PM10 | | 1.8 g/s | (3.) | 25 TPH Boiler | Husk or Coal | 40 | 2 | NOx | | 4.6 g/s | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 150000 | (b)Source | AP Transco and nearby Sister Unit | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1 x 4750 kVA DG set and 3 x 1000 kVA DG Sets | (e)Stack Height (in m) | 15 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 129.5 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 129.5 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 129.5 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Not Applicable | 0 | Total (ha.) | 129.5 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 76.89 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | No Critically Polluted Area within 10 km of Study Area | (2.) | WLS | NA | 0 | No WLS within 10 km of Study Area | (3.) | ESAs | NA | 0 | No ESAs within 10 km Study Area | (4.) | ESZs | NA | 0 | No ESZs within 10 km Study Area | (5.) | Corridors | NA | 0 | No Corridors within 10 km Study Area | (6.) | Wildlife Corridors | NA | 0 | No Wildlife Corridors within 10 km Study Area | (7.) | NPA | NA | 0 | No NPA within 10 km of Study Area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Polavaram RF | 7.4 | Northwest direction | (2.) | Defence Installations | | NA | 0 | No Defence Installations within 10 km Study Area | (3.) | Others | Reserve Forest | Vinjaram RF | 8.9 | Northwest direction | (4.) | Archaeological Sites | | NA | 0 | No Archaeological Sites within 10 km Study Area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 129.5 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired (Expansion is within existing site area) | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | A stream of Godavari River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 3.7 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 120 | (b)Permanent Employment-During Operation | 240 | (c)Temporary Employment- During Construction | 80 | (d)Temporary Employment- During Operation | 60 | (e)No. of working days | 360 | (f)Total Manpower | 500 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 76.89 | 0 | 76.89 | (2.) | Percentage of Total Project Area | 59.37 | 0 | 59.37 | (3.) | No. of Plants | 96800 | 20000 | 116800 | (4.) | Funds Allocated | 35 | 10 | 45 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0077 | (ii)Name of the EIA Consultant | Team Labs and Consultants | (iii)Address | TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038 | (iv)Mobile No. | 0402374855 | (v)Landline No. | 0402374855 | (vi)Email Id | teamlabs@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 01 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Details of different existing/proposed products to be mentioned in column 9(b) of Form-2, in terms of the projects/activities i.e. item 4(d) & 5(f) of the schedule to the EIA Notification, 2006. Earlier ToR/EC details to be mentioned in column 6. | 23 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 09 Apr 2019 | 3. | NA | Please see our earlier observations dated 23/3/2019. It is to reiterate that the proposal should reflect only those products or activities which are listed under item 4(d) & 5(f) of the schedule to the EIA Notification, 2006, not the by-products or others. Also, please submit compliance status for the EC dated 31/5/2017 and provide relevant details in column 6 of Form-2. | 13 Apr 2019 | 4. | NA | The correction have been made as per the instruction received | 16 Apr 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sri Narendranath Chowdary P | Designation | MD | Name of Company (Applicant Name should not be given here) | THE ANDHRA SUGARS LIMITED, CHEMICALS & FERTILISERS DIVISION | Address | The Andhra Sugars Limited, Chemicals and Fertilisers Division |
|