Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Integrated Solid Waste Processing Facility at Murthal Village, Sonipat District, Haryana
(b)Name of the Company / Organisation DIRECTORATE OF URBAN LOCAL BODIES
(c)Registered Address Bays No.11-14 Sector - 4,Panchkula,Panchkula,Haryana-134112
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Tulsi Lal Sharma
(b)Designation (Owner/ Partner/ CEO) Executive Enginner
(c)Address Railway Road, Near PWD rest house,Sonepat,Sonipat,Sonipat,Haryana-131001
(d)Pin code 131001
(e)E-mail sonipatmsw15@gmail.com
(f)STD Code. 172(f)Telephone No. 2260100
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
Minor Activity7(i) Common Municipal Solid Waste Management Facility (CMSWMF)
(b)Category A
(c)Proposal Number IA/HR/MIS/59672/2016
(d)Master Proposal Number(Single Window) SW/97729/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Proposed Site- 4/24 (7-18), 25 (2-4), 14/4 (8-0),
(b)Pincode 131001
(c)Bounded Latitudes (North)
From
Degree 29.064469
Minutes
Second
From
Degree 29.070791
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.096901
Minutes
Second
From
Degree 77.103817
Minutes
Second
(e)Survey of India Topo Sheet No. 53G4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 220
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5.1
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaSonipatSonipat
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-73/2016-IA-III
(c)Date of Apply of TOR 14 Oct 2016
(d)Date of Issue of TOR / Standard ToR 28 Nov 2016
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :18 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site Murthal
State :Haryana
District :Sonipat
Tehsil :Sonipat
Village :Murthal
74Heaps of waste, flies, mosquitoes, land issue.. etcDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Plant is designed to process 500 TPDRDF Based Power Plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power Plant- 8MW500OthersTPDRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 154.44
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 182500
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 182500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Municipal Solid Waste182500Tons per AnnumWaste generation from Sonipat ClusterRoad40 OthersConcession AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube65.452.264.0100
(2.)PM2.5Micro Gram per Meter Cube38.528.337.760
(3.)SO2Micro Gram per Meter Cube9.66.39.480
(4.)NOxMicro Gram per Meter Cube19.614.619.280
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l6523465002000
(2.)Chloridesmg/l93.4342.042501000
(3.)Heavy MetalsPbmg/l0.100.0080.010.01
(4.)Total Hardnessmg/l572.22236.34200200
(5.)pHNA8.017.506.58.5
(6.)Fluoridemg/l0.33720.1701.01.5
(7.)TSSmg/l0.00.00.00.0
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.047.78A
(2.)BODmg/l2.92.4A
(3.)DOmg/l2.01.5D
(4.)CODmg/l3225A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.3645.3875
(2.)Leq(Night)A-weighted decibels(dB(A))52.4238.4670
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.578.02
(2.)P(Phosphorus)Percent0.00.0
(3.)K(Potassium)Kilogram per hectare47.506.43
(4.)Electric ConductivityMillisiemens per Centimetre73.722.4
(5.)N(Nitrogen)Percent0.0910.036
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.57 To 24.84
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.64 To 22.46
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSTP41410Copy of Permission LetterPipelineOthersNearby Sewage Treatment PlantIN-DL35214701732816P25 Sep 20172000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Leachate2045Aerobic and Anaerobic Treatment MethodologyReuse within the Plant & Recycling,Green Belt Renewal Plant20
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 20
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process Inert/AshMunicipal Solid Waste38325Tons0Others--Sanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube19.1103.32380
(2.)PM2.5Microgram per Meter Cube0.00.00.010.0
(3.)PM10Microgram per Meter Cube64.5100.465100
(4.)SO2Microgram per Meter Cube9.1101.710.880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerProcessed MSW600.85PM100.31
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source RDF Based Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 60
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 15.91
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 15.91
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 19272.01
(b)Waste/Barren Land (ha.) 1861.02
(c)Grazing/ Community Land (ha.) 1808.62
(d)Surface Water Bodies (ha.) 2581.38
(e)Settlements (ha.) 3838.49
(f)Industrial (ha.) 1751.83
(g)Forest (ha.) 1259.23
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Plantation etc 565.21
    Total (ha.) 32937.79
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Area for Solid Waste Management7.62Processing Facility
(2.)LandFill8.28Sanitary Landfill
Total (ha.) 15.9
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA-0NA
(2.)ESZs-0NA
(3.)Wildlife Corridors-0NA
(4.)ESAs-0NA
(5.)Corridors-0NA
(6.)Critically Polluted Area-0NA
(7.)WLS-0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersRiverYamuna River4.5Yamuna River is situated at 4.5 Km from Project Site at East Direction
(2.)Archaeological Sites-0NA
(3.)Defence Installations-0NA
(4.)Forest-0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 15.91
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 4.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction
(b)Permanent Employment-During Operation
(c)Temporary Employment- During Construction
(d)Temporary Employment- During Operation
(e)No. of working days
(f)Total Manpower
32.
Green Belt in Ha:
(a)Total Area of Green Belt
(b)Percentage of Total Project Area
(c)No. of Plants to be Planted
(d)Funds Allocated for Plantation
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe overall effect will improve buying power of employees and thus a higher standard of living viz. better education, improved health and sanitation facilities housing and acquisition of consumer durable. This is envisaged as a major positive benefit
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 159122.39
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking NA
5.
Energy Saving Measures:
(a)Source/Mode All the motors will be provided recent technology
(b)Percentage 2.5
(c)Quantity 18
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area The drainage network of an area is principally gov
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ?
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ?
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document?
(i)Accreditation No.
(ii)Name of the EIA Consultant
(iii)Address
(iv)Mobile No.
(v)Landline No.
(vi)Email Id
(vii)Category of Accreditation
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per the documents, Draft EIA report has been submitted. Kindly submit final EIA report incorporating details of public Hearing along with issued raised and responses given by the project proponent in the form of time bound action plan. The copy of minutes of Public hearing uploaded is not legible. Kindly upload the clear copy of the same. 08 Mar 2019
2.NAThe correction have been made as per the instruction received 11 Mar 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantTulsi Lal Sharma
DesignationExecutive Enginner
Name of Company (Applicant Name should not be given here)DIRECTORATE OF URBAN LOCAL BODIES
AddressBays No.11-14 Sector - 4
Print