1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Onshore Oil & Gas Development Drilling and Production in Mechaki Area covering Mechaki, Mechaki Extension, Baghjan and Tinsukia Extension PMLs in Tinsukia District of Assam.
(b)Name of the Company / Organisation OIL INDIA LIMITED
(c)Registered Address OIL INDIA LIMITED DULIAJAN District : Dibrugarh ,,Dibrugarh,Assam-786602
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Ajit Chandra Haloi
(b)Designation (Owner/ Partner/ CEO) CGM(HSE)
(c)Address Safety & Environment Department , Oil India Limited, Duliajan,,,Dibrugarh,Assam-786602
(d)Pin code 786602
(e)E-mail safety@oilindia.in
(f)STD Code. 374(f)Telephone No. 2800542
(g)Fax No. 03742801796
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity8(a) Building and Construction projects
(b)Category A
(c)Proposal Number IA/AS/IND2/97724/2007
(d)Master Proposal Number(Single Window) SW/97717/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Doomdooma
(b)Pincode 786151
(c)Bounded Latitudes (North)
From
Degree 27.583335
Minutes
Second
From
Degree 27.766670
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 95.433345
Minutes
Second
From
Degree 95.70000
Minutes
Second
(e)Survey of India Topo Sheet No. 83M/6, 83M/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 156
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/1260/2007-IA II(I)
(c)Date of Issue of TOR 29 Feb 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 24 Sep 2019
(c)Date of Issue of EC 02 Nov 2011
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing Happened in the block for earlier E
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Shillong
(iii)Letter No. RO-NE/E/IA/AA/MI/59/169-71
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 7 2016 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)18 wells and 4 production installations61824OthersNo of wellsOthersWell drilling
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)18 wells and 4 production installations61824
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Jul 2018
(iv)Valid Upto 31 Mar 2019
(v)File No. S&E/E/20/1126
(vi)Application No. S&E/E/20/1126
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.16
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3.5
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 3.5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel3.5Kilo Litre per DayLocal supplierRoad50 Othersthrough supplierCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 05 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube742546.7660
(2.)SO2Micro Gram per Meter Cube9.304.206.2680
(3.)NOxMicro Gram per Meter Cube32.401.6021.5080
(4.)PM10Micro Gram per Meter Cube1425287.21100
(5.)OthersCOMili Gram per Meter Cube0.850.140.492
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersno unit7.16.56.58.5
(2.)TDSmg/l130825002000
(3.)Fluoridemg/l0.10.111.5
(4.)Heavy MetalsCadmiummg/l0.0010.0010.0030.003
(5.)TSSOthersNot analyzed0000
(6.)OthersTotal chromiummg/l0.010.010.050.05
(7.)Total Hardnessmg/l10848300600
(8.)Chloridesmg/l48122501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l124A
(2.)OthersTotal coliformOthersMPN/100ml11023B
(3.)BODmg/l22A
(4.)pHOthersNo unit7.176.73A
(5.)DOmg/l8.87.7A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.552.455
(2.)Leq(Night)A-weighted decibels(dB(A))45.340.545
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram425230
(2.)P(Phosphorus)Milligram per Kilogram3.53
(3.)K(Potassium)Milligram per Kilogram5014
(4.)Electric ConductivityMillisiemens per Centimetre5333
(5.)pHOthersno unit5.424.75
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.68 To 4.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater500Copy of Permission LettermodeOtherswell at siteTube WellS&E/E/93/28125 Feb 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Wastewater88Septic tank and soak pitOthersSoak Pit08
(2.)Drilling and Wash wastewater16.8150Effluent Treatment PlantDischarge into Surface Water Body,Reuse within the Plant & Recycling106.8
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 24.8
(b)Total Discharged Water (Kilolitre per Day) 14.8
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Waste Drilling MudIndustrial Waste3072Tons0OthersDisposed at HDPE lined pits within siteOthersDisposed at HDPE lined pits within site
(2.)Drill cuttingIndustrial Waste1840Tons0OthersDisposed at HDPE lined pits within siteOthersDisposed at HDPE lined pits within site
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube861.90.01086.01031100
(2.)SO2Microgram per Meter Cube5.91.90.76856.6685180
(3.)NOxMicrogram per Meter Cube19.71.92.0241721.72417180
(4.)Others(Specify)Total HydrocarbonMicrogram per Meter Cube3271.91.01328.2110
(5.)PM2.5Microgram per Meter Cube470047.0000160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel70.3PM100.07
(2.)DG setDiesel70.3SO20.374
(3.)Dg setDiesel70.3NOx1.836
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Diesel Generator sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) one additional 1250 KVA
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 2.923
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.923
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17495
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 5743
(e)Settlements (ha.) 6480
(f)Industrial (ha.) 7
(g)Forest (ha.) 6803
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Tea garden, road, railway 16934
    Total (ha.) 53462
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersdrill area2.923
Total (ha.) 2.923
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSBherjan Borjan Podumoni WLS14No WLS within 10 km
(2.)NPADibru Saikhowa National Park1.70Wildlife clearance application for the wells and production facilities will be submitted
(3.)ESAsNone10No ESA within 10 km
(4.)CorridorsNone10No corridors within 10 km
(5.)Wildlife CorridorsNone10No wildlife corridors within 10 km
(6.)Critically Polluted AreaNone10No critically polluted area within 10 km
(7.)ESZsESZ of Dibru Saikhowa National Paek0Some wells and production facilities within the ESZ of Dibru Saikhowa National Park
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestMechaki Reserve Forest0two wells in forest land
(2.)Archaeological SitesNone10No archaeological sites within 10 km
(3.)Defence InstallationsNone10No major defense installations within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL NIL
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Forest Clearance Under Process(Stage-I)
(i)MoEFCC file number FP/AS/MIN/23331/2016
(ii)Area applied 2.253
Forests Clearance Application Pending with -1
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 82
(c)Status of Land acquisition if not acquired In process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 13 Schedule I species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 0
(iii)Period of Implementation Within the drilling and production period
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Dangori River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 0.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 120
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt000
(2.)Percentage of Total Project Area000
(3.)No. of Plants000
(4.)Funds Allocated000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialProvision of more royalty to Assam Government and more cess to Govt. of India Energy security for the country
(2.)SocialProvision of more employment opportunity to local people Development of infrastructure (roads, culverts, bridges, schools etc.) in the area Increase in business opportunity for the local people Programs related to livelihood generation, health improvement as per OIL’s Corporate Social Responsibility (CSR) programmes.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1618/RA 0055
(ii)Name of the EIA Consultant ERM India Pvt. Ltd.
(iii)Address Building 10, Tower A, 4th Floor, DLF Cyber City Gurgaon 122002
(iv)Mobile No. 981006161
(v)Landline No. 0124417030
(vi)Email Id subir.gupta@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform about EC status for the existing exploration/development of drilling wells (6 nos) and the compliance status thereof. Details in this regard need to be mentioned in column 6 of Form-2. - Proposal for Forest and Wildlife Clearance. - Proposal to be submitted for ground water withdrawal of 50 cum/day. 23 Mar 2019
2.NAThe correction have been made as per the instruction received 10 Apr 2019
3.NAOn examination of your reply dated 28/3/2019, following are the observations:- - Proposal for Wildlife clearance and ground water withdrawal has not been submitted so far. - Entry at column 24 of Form-2 still shows 'Proposal for forest clearance yet to be submitted'. - Total land required of 82 ha is yet to be acquired. - Ministry's Regional Office vide letter dated 5/7/2016, has asked for action taken report on their observations during site visit on 7-14 June, 2016. Follow up action in this regard. 19 Apr 2019
4.NAThe correction have been made as per the instruction received 08 May 2019
5.NAIt is to inform that our observations relate to the project envisaged for the present and the details mentioned in Form-2. Neither total land of 82 ha has been acquired, nor application has been submitted to CGWB/CGWA for ground water withdrawal of 50 cum/day. Please confirm whether drilling of wells is permitted in the ESZ of DS National Park. For clarification, if any, matter may be discussed with us in the Ministry along with the project layout to facilitate further consideration of the proposal. 18 May 2019
6.NAThe correction have been made as per the instruction received 24 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAjit Chandra Haloi
DesignationCGM(HSE)
Name of Company (Applicant Name should not be given here)OIL INDIA LIMITED
AddressOIL INDIA LIMITED DULIAJAN District : Dibrugarh