Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of molasses based distillery unit from 30 KLPD to 45 KLPD at Gautamnagar, P.O. Kolpewadi, Tahsil Kopargaon Dist. Ahmednagar Maharashtra by M/s. The Kopargaon Sahakari Sakhar Karkhana Limited
(b)Name of the Company / Organisation KOPERGAON SAHAKARI SAKAR KARKHANA LTD DISTILLERY DIVISION
(c)Registered Address GAt No.109/1, survey no. 22/23, Gautamnagar , Tal: Kopergaon Dist: Ahmadnagar,,Ahmednagar,Maharashtra-423602
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dnyaneshwar Vasantrao Abhale
(b)Designation (Owner/ Partner/ CEO) General Magager Distillery Div
(c)Address Gat no. 109/1, Survey no. 22/23, Gautamnagar, Tal: Kopergaon , Dist: Ahmadnagr,,Kopargaon,Ahmednagar,Maharashtra-423602
(d)Pin code 423602
(e)E-mail kosakabhingari@rediffmail.com
(f)STD Code. 2423(f)Telephone No. 261210
(g)Fax No. 02423261217
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/97572/2019
(d)Master Proposal Number(Single Window) SW/97562/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gat No. 109/1, Survey No. 22/23, Suregaon
(b)Pincode 423602
(c)Bounded Latitudes (North)
From
Degree 19.80
Minutes
Second
From
Degree 19.89
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.20
Minutes
Second
From
Degree 74.35
Minutes
Second
(e)Survey of India Topo Sheet No. E43C05
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 530
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. Not Required
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 5 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Rectified Spirit301545Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery301545
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Jun 2018
(iv)Valid Upto 31 Aug 2021
(v)File No. UAN No. 0000028730/R/CAC - 1806000200
(vi)Application No. 0000028730
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 41.00
(b) Funds Allocated for Environment Management (Capital) (in Crores) 35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.41
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 52500
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 52500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Yeast1Tons per AnnumOpen MarketRoad50 Open MarketCopy of Linkage
(2.)Bagasse28800Tons per AnnumOwnRoad0 CaptiveCopy of Linkage
(3.)Coal10332Tons per AnnumOpen MarketRoad50 Open MarketCopy of Linkage
(4.)Molasses52500Tons per AnnumOwn/ Open MarketPipe Conveyor50 CaptiveCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5000.3Copy of Permission LetterPipelineOthersPumped from Canal9842/201627 Oct 20162446
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Concentrated Spentwash83100Concentration and IncinerationOthersPotash Rich Ash, Sold to Farmers as Manure830
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 83
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 83
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fermenter SludgeIndustrial Waste30Tons0RoadOthersUsed as Manure
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.020.8262.83100
(2.)PM2.5Microgram per Meter Cube36.640.430.8237.4760
(3.)SO2Microgram per Meter Cube42.120.437.4549.5880
(4.)NOxMicrogram per Meter Cube31.560.438.5640.1380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)StackCoal+Concentrated Spentwash721.5NOx5.034
(2.)StackCoal + Concentrated Spentwash721.5PM101.5
(3.)StackCoal+ Concentrated Spentwash721.5SO23.125
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 26520
(b)Source Own power generation from proposed 1.5 MW TG Set
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1* 675 KVA and 1*250 KVA
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 95
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 95.0
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 59
(b)Waste/Barren Land (ha.) 15
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 1
(f)Industrial (ha.) 20
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 95
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt3.3
(2.)Built Up Area2.0
(3.)Township1
(4.)Main Plant10
(5.)Area for Solid Waste Management2.3ETP and Composting
(6.)OthersSugar Factory +Agricultural Land76.4
Total (ha.) 95
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot Applicable0No ESAs
(2.)CorridorsNot Applicable0No Corridors
(3.)Critically Polluted AreaNot Applicable0No Critically Polluted Area
(4.)ESZsNot Applicable0No ESZs
(5.)Wildlife CorridorsNot Applicable0No Wildlife corridors
(6.)WLSNot Applicable0No WLS
(7.)NPANot Applicable0No NPA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot Applicable0No Archaeological site within 10 Km area
(2.)Defence InstallationsNot Applicable0No defence installations within 10 Km Area
(3.)ForestNot Applicable0No Forest Land
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Godavari River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 78
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 52
(e)No. of working days 300
(f)Total Manpower 130
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.303.3
(2.)No. of Plants500005000
(3.)Percentage of Total Project Area33033
(4.)Funds Allocated25000050000300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment opportunities to the local people. Growth of ancillary industries like transport, hotels, Engineering units like workshops etc.
(2.)EnvironmentalClean Technology to achieve Zero Liquid Discharge and control of emissions by incorporating Pollution Control Measures, such as ESP. Generation of Potash rich Ash, which would benefit the farmers.
(3.)FinancialAdditional price for sugarcane. Timely payment of wages to the workers due to increased financial viability of the industry. Excise revenue to the Government Treasury.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/1619/RA0057
(ii)Name of the EIA Consultant Dr. Subbarao' s Environment Center, Sangli
(iii)Address "Arundhati", Opp. Sahayognagar, MSEB Road, Vishrambag, Sangli
(iv)Mobile No. 0937210952
(v)Landline No. 0233230185
(vi)Email Id bssubbarao@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 12 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDnyaneshwar Vasantrao Abhale
DesignationGeneral Magager Distillery Div
Name of Company (Applicant Name should not be given here)KOPERGAON SAHAKARI SAKAR KARKHANA LTD DISTILLERY DIVISION
AddressGAt No.109/1, survey no. 22/23, Gautamnagar , Tal: Kopergaon Dist: Ahmadnagar
Print