1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Group Housing (SIEL) | (b)Name of the Company / Organisation | DLF HOMES DEVELOPERS LTD | (c)Registered Address | DLF Center Sansad Marg, New Delhi - 110001,,New Delhi,Delhi-110001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kapil Gupta | (b)Designation (Owner/ Partner/ CEO) | Authorized Signatory | (c)Address | DLF Center, Sansad Marg, New Delhi - 110001,,Connaught Place,New Delhi,Delhi-110001 | (d)Pin code | 110001 | (e)E-mail | dlfhomes070416@gmail.com | (f)STD Code. | 11(f)Telephone No. | 42102213 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(b) Townships and Area Development projects.
| Minor Activity | | (b)Category | B1 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/DL/MIS/97563/2008 | (d)Master Proposal Number(Single Window) | SW/97556/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | SIEL Complex | (b)Pincode | 110015 | (c)Bounded Latitudes (North) | | From | | Degree | 3172763.30 | Minutes | | Second | | From | | Degree | 3173276.84 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 710915.81 | Minutes | | Second | | From | | Degree | 711317.59 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53 H/02 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 232 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.37 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Delhi | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | . 21-111/2017-IA-III | (c)Date of Issue of TOR | 20 May 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 23 Apr 2019 | (c)Date of Issue of EC | 11 Oct 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | According to EIA notification, 2006, all building/ | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | IV/628/09-RO(NZ)/595 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 4 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Built-up area | 66923.26 | 933803.52 | 1000726.78 | Others | square metre | Others | Not applicable as built-up area | (2.) | Net plot area | 91956.19 | 0 | 91956.19 | Others | square metre | Others | Not applicable as net plot area | (3.) | Plot area | 100686 | 0 | 100686 | Others | square metre | Others | Not applicable as plot area | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Blocks | 1 | 6 | 7 | | (2.) | EWS | 0 | 1862 | 1862 | | (3.) | Dwelling Units | 0 | 2900 | 2900 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 24 Feb 2015 | (iv)Valid Upto | 25 Sep 2019 | (v)File No. | - | (vi)Application No. | - | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3048.02 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 9.45 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.0741 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 3.09 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 0 | Others | NA | 0 | Others | NA | 0 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 150.2 | 65.1 | 142.3 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 16.8 | 5.5 | 10.6 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 367 | 155 | 324.8 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 54.4 | 25.9 | 50.7 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.8 | 7.4 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 2069 | 167.2 | 500 | 500 | (4.) | Chlorides | | | mg/l | | 739.8 | 22 | 250 | 250 | (5.) | Heavy Metals | | aluminium | mg/l | | 0 | 0 | 0.03 | 0.03 | (6.) | Fluoride | | | mg/l | | 1.08 | 0 | 1 | 1 | (7.) | Total Hardness | | | mg/l | | 1000 | 72 | 200 | 200 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 360 | 60 | E | (2.) | pH | | NA | | 8.48 | 7.45 | E | (3.) | DO | | mg/l | | 6 | 4 | C | (4.) | BOD | | mg/l | | 62 | 8 | E | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 76.9 | 56.1 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 68.4 | 49.3 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 48.5 | 18.5 | (2.) | Electric Conductivity | Others | microsiemens per centimetre | 595.4 | 145.2 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 98 | 64.4 | (4.) | pH | | | 8 | 7.2 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 32.8 | 13.6 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 24.05 To 6.44 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.05 To 6.11 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Delhi Jal Board | 2637 | 0 | Copy of Permission Letter | Pipeline | | Others | Delhi Jal Board | TP/4/2302 | 30 Nov 2018 | 2637 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic, Flushing, Backwash | 3101 | 3700 | Sewage Treatment Plant | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | 311 KLD losses | 1653 | 1448 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3101 | (b)Total Discharged Water (Kilolitre per Day) | 1448 | (c)Total Reused Water (Kilolitre per Day) | 1653 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | E-waste | E Waste | | 0.14 | Tons | 1 | Road | | Authorized Recyclers | | (2.) | Non Biodegradable Solid Waste | Municipal Solid Waste | | 793.875 | Tons | 0.1 | Road | | Authorized Recyclers | | (3.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2.4 | Kilolitre | 1 | Road | | Authorized Recyclers | | (4.) | Plastic Waste | Plastic Waste | | 793.51 | Tons | 0.1 | Road | | Authorized Recyclers | | (5.) | Biodegradable Solid Waste | Municipal Solid Waste | | 2381.26 | Tons | 0 | Others | Onsite | Others | Organic Waste Converter | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 276.5 | 0.9 | 0.099 | 276.5991 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 9.6 | 0.9 | 0.025 | 9.6251 | 80 | (3.) | NOx | | Microgram per Meter Cube | 45 | 0.9 | 0.120 | 45.1201 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 121.8 | 0.9 | 0.099 | 121.8991 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG sets of 8x2000 kVA | Low sulphur diesel | 30 | 0.65 | NOx | | 0.228 | (2.) | DG sets of 2x1000 kVA | Low sulphur diesel | 30 | 0.50 | NOx | | 0.228 | (3.) | DG sets of 1x750 kVA | Low sulphur diesel | 30 | 0.3 | SO2 | | 0.09 | (4.) | DG sets of 2x500 kVA | Low sulphur diesel | 30 | 0.22 | NOx | | 0.175 | (5.) | DG sets of 1x380 kVA | Low sulphur diesel | 30 | 0.22 | Others | PM2.5 | 0.010 | (6.) | DG sets of 2x1000 kVA | Low sulphur diesel | 30 | 0.50 | PM10 | | 0.034 | (7.) | DG sets of 1x750 kVA | Low sulphur diesel | 30 | 0.3 | Others | PM2.5 | 0.010 | (8.) | DG sets of 1x600 kVA | Low sulphur diesel | 30 | 0.3 | PM10 | | 0.025 | (9.) | DG sets of 8x2000 kVA | Low sulphur diesel | 30 | 0.65 | PM10 | | 0.034 | (10.) | DG sets of 8x2000 kVA | Low sulphur diesel | 30 | 0.65 | Others | PM2.5 | 0.013 | (11.) | DG sets of 8x2000 kVA | Low sulphur diesel | 30 | 0.65 | SO2 | | 0.12 | (12.) | DG sets of 3x1010 kVA | Low sulphur diesel | 30 | 0.50 | PM10 | | 0.034 | (13.) | DG sets of 3x1010 kVA | Low sulphur diesel | 30 | 0.50 | Others | PM2.5 | 0.013 | (14.) | DG sets of 3x1010 kVA | Low sulphur diesel | 30 | 0.50 | SO2 | | 0.12 | (15.) | DG sets of 3x1010 kVA | Low sulphur diesel | 30 | 0.50 | NOx | | 0.228 | (16.) | DG sets of 2x1000 kVA | Low sulphur diesel | 30 | 0.50 | SO2 | | 0.12 | (17.) | DG sets of 2x1000 kVA | Low sulphur diesel | 30 | 0.50 | Others | PM2.5 | 0.013 | (18.) | DG sets of 1x750 kVA | Low sulphur diesel | 30 | 0.3 | PM10 | | 0.025 | (19.) | DG sets of 1x750 kVA | Low sulphur diesel | 30 | 0.3 | NOx | | 0.175 | (20.) | DG sets of 1x600 kVA | Low sulphur diesel | 30 | 0.3 | NOx | | 0.175 | (21.) | DG sets of 1x600 kVA | Low sulphur diesel | 30 | 0.3 | Others | PM2.5 | 0.010 | (22.) | DG sets of 2x500 kVA | Low sulphur diesel | 30 | 0.22 | SO2 | | 0.09 | (23.) | DG sets of 1x380 kVA | Low sulphur diesel | 30 | 0.22 | PM10 | | 0.025 | (24.) | DG sets of 1x380 kVA | Low sulphur diesel | 30 | 0.22 | SO2 | | 0.09 | (25.) | DG sets of 1x380 kVA | Low sulphur diesel | 30 | 0.22 | NOx | | 0.175 | (26.) | DG sets of 2x500 kVA | Low sulphur diesel | 30 | 0.22 | PM10 | | 0.025 | (27.) | DG sets of 1x600 kVA | Low sulphur diesel | 30 | 0.3 | SO2 | | 0.09 | (28.) | DG sets of 2x500 kVA | Low sulphur diesel | 30 | 0.22 | Others | PM2.5 | 0.010 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 26797 | (b)Source | BSES | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 8 X 2000 kVA, 2 X 1000 kVA, 1x750 kVA, 1x600 kVA, | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 10.0686 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 10.0686 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Plot Area | 10.0686 | Total (ha.) | 10.0686 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 100.072678 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | None | (2.) | NPA | None | 0 | None | (3.) | ESZs | None | 0 | None | (4.) | Wildlife Corridors | None | 0 | None | (5.) | ESAs | None | 0 | None | (6.) | Critically Polluted Area | Anand Parbat Industrial Area | 1.04 | SE direction from project site | (7.) | Corridors | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | River | Yamuna River | 6.74 | East direction from project site | (2.) | Archaeological Sites | | Salimgarh Fort | 7.84 | East direction from project site | (3.) | Defence Installations | | None | 0 | None | (4.) | Forest | | Pusa Hill Forest | 5.53 | South direction from project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 10.0686 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Prasad Nagar Lake | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 2.55 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 285 | (c)Temporary Employment- During Construction | 600 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 885 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 3023 | 26190.218 | 29213.218 | (2.) | Percentage of Total Project Area | 3.29 | 28.48 | 31.77 | (3.) | No. of Plants | 695 | 454 | 1149 | (4.) | Funds Allocated | 1150000 | 16350000 | 17500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment opportunities will be generated for people of nearby area. | (2.) | Financial | Revenue generation through taxes. | (3.) | Environmental | 31.76 % of net plot area shall be developed as green area. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 179.22 | (b)Total No. of Flats to be Build | 4762 | (c)No. of Buildings | 7 | (d)Total plot area (sqm) | 100686.00 | (e)Total built up area (sqm) | 1000726.78 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 33 | (d)Capacity | 870 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 8836 ECS | |
|
5. | Energy Saving Measures: | (a)Source/Mode | solar and LED lamps | (b)Percentage | 65 | (c)Quantity | 10118719 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Rev 75/10th April 2019 at S.No.-119 | (ii)Name of the EIA Consultant | M/s Perfact Enviro Solutions Pvt. Ltd. | (iii)Address | 5th Floor, NN Mall, Mangalam Palace Sector 3, Rohini, New Delhi | (iv)Mobile No. | 9818362330 | (v)Landline No. | 0114928136 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 27 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The proposal for amendment in the ToR was considered and recommended by the EAC in its 38th meeting held during 6-8 February, 2019. However, before issue of the Amendment letter, the project proponent has requested for correction/modification in the minute of the 38th meeting. The correction/modification will be considered in the next EAC meeting. Kindly apply for the Environmental Clearance after issue of Amendment in ToR letter. | 07 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 23 Apr 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kapil Gupta | Designation | Authorized Signatory | Name of Company (Applicant Name should not be given here) | DLF HOMES DEVELOPERS LTD | Address | DLF Center Sansad Marg, New Delhi - 110001 |
|