Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Group Housing (SIEL)
(b)Name of the Company / Organisation DLF HOMES DEVELOPERS LTD
(c)Registered Address DLF Center Sansad Marg, New Delhi - 110001,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kapil Gupta
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address DLF Center, Sansad Marg, New Delhi - 110001,,Connaught Place,New Delhi,Delhi-110001
(d)Pin code 110001
(e)E-mail dlfhomes070416@gmail.com
(f)STD Code. 11(f)Telephone No. 42102213
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(b) Townships and Area Development projects.
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/97563/2008
(d)Master Proposal Number(Single Window) SW/97556/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. SIEL Complex
(b)Pincode 110015
(c)Bounded Latitudes (North)
From
Degree 3172763.30
Minutes
Second
From
Degree 3173276.84
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 710915.81
Minutes
Second
From
Degree 711317.59
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 232
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.37
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number . 21-111/2017-IA-III
(c)Date of Issue of TOR 20 May 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 23 Apr 2019
(c)Date of Issue of EC 11 Oct 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason According to EIA notification, 2006, all building/
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/628/09-RO(NZ)/595
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 4 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Built-up area66923.26933803.521000726.78Otherssquare metreOthersNot applicable as built-up area
(2.)Net plot area91956.19091956.19Otherssquare metreOthersNot applicable as net plot area
(3.)Plot area1006860100686Otherssquare metreOthersNot applicable as plot area
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Blocks167
(2.)EWS018621862
(3.)Dwelling Units029002900
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 24 Feb 2015
(iv)Valid Upto 25 Sep 2019
(v)File No. -
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3048.02
(b) Funds Allocated for Environment Management (Capital) (in Crores) 9.45
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0741
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.09
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNA0OthersNA0 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube150.265.1142.360
(2.)SO2Micro Gram per Meter Cube16.85.510.680
(3.)PM10Micro Gram per Meter Cube367155324.8100
(4.)NOxMicro Gram per Meter Cube54.425.950.780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.46.58.5
(2.)TSSmg/l0000
(3.)TDSmg/l2069167.2500500
(4.)Chloridesmg/l739.822250250
(5.)Heavy Metalsaluminiummg/l000.030.03
(6.)Fluoridemg/l1.08011
(7.)Total Hardnessmg/l100072200200
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l36060E
(2.)pHNA8.487.45E
(3.)DOmg/l64C
(4.)BODmg/l628E
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))76.956.175
(2.)Leq(Night)A-weighted decibels(dB(A))68.449.370
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram48.518.5
(2.)Electric ConductivityOthersmicrosiemens per centimetre595.4145.2
(3.)N(Nitrogen)Milligram per Kilogram9864.4
(4.)pH87.2
(5.)P(Phosphorus)Milligram per Kilogram32.813.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board26370Copy of Permission LetterPipelineOthersDelhi Jal BoardTP/4/230230 Nov 20182637
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing, Backwash31013700Sewage Treatment PlantReuse within the Plant & Recycling,Green Belt Renewal Plant,Others311 KLD losses16531448
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3101
(b)Total Discharged Water (Kilolitre per Day) 1448
(c)Total Reused Water (Kilolitre per Day) 1653
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)E-wasteE Waste0.14Tons1RoadAuthorized Recyclers
(2.)Non Biodegradable Solid WasteMunicipal Solid Waste793.875Tons0.1RoadAuthorized Recyclers
(3.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2.4Kilolitre1RoadAuthorized Recyclers
(4.)Plastic WastePlastic Waste793.51Tons0.1RoadAuthorized Recyclers
(5.)Biodegradable Solid WasteMunicipal Solid Waste2381.26Tons0OthersOnsiteOthersOrganic Waste Converter
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube276.50.90.099276.5991100
(2.)SO2Microgram per Meter Cube9.60.90.0259.625180
(3.)NOxMicrogram per Meter Cube450.90.12045.120180
(4.)PM2.5Microgram per Meter Cube121.80.90.099121.899160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG sets of 8x2000 kVALow sulphur diesel300.65NOx0.228
(2.)DG sets of 2x1000 kVALow sulphur diesel300.50NOx0.228
(3.)DG sets of 1x750 kVALow sulphur diesel300.3SO20.09
(4.)DG sets of 2x500 kVALow sulphur diesel300.22NOx0.175
(5.)DG sets of 1x380 kVALow sulphur diesel300.22OthersPM2.50.010
(6.)DG sets of 2x1000 kVALow sulphur diesel300.50PM100.034
(7.)DG sets of 1x750 kVALow sulphur diesel300.3OthersPM2.50.010
(8.)DG sets of 1x600 kVALow sulphur diesel300.3PM100.025
(9.)DG sets of 8x2000 kVALow sulphur diesel300.65PM100.034
(10.)DG sets of 8x2000 kVALow sulphur diesel300.65OthersPM2.50.013
(11.)DG sets of 8x2000 kVALow sulphur diesel300.65SO20.12
(12.)DG sets of 3x1010 kVALow sulphur diesel300.50PM100.034
(13.)DG sets of 3x1010 kVALow sulphur diesel300.50OthersPM2.50.013
(14.)DG sets of 3x1010 kVALow sulphur diesel300.50SO20.12
(15.)DG sets of 3x1010 kVALow sulphur diesel300.50NOx0.228
(16.)DG sets of 2x1000 kVALow sulphur diesel300.50SO20.12
(17.)DG sets of 2x1000 kVALow sulphur diesel300.50OthersPM2.50.013
(18.)DG sets of 1x750 kVALow sulphur diesel300.3PM100.025
(19.)DG sets of 1x750 kVALow sulphur diesel300.3NOx0.175
(20.)DG sets of 1x600 kVALow sulphur diesel300.3NOx0.175
(21.)DG sets of 1x600 kVALow sulphur diesel300.3OthersPM2.50.010
(22.)DG sets of 2x500 kVALow sulphur diesel300.22SO20.09
(23.)DG sets of 1x380 kVALow sulphur diesel300.22PM100.025
(24.)DG sets of 1x380 kVALow sulphur diesel300.22SO20.09
(25.)DG sets of 1x380 kVALow sulphur diesel300.22NOx0.175
(26.)DG sets of 2x500 kVALow sulphur diesel300.22PM100.025
(27.)DG sets of 1x600 kVALow sulphur diesel300.3SO20.09
(28.)DG sets of 2x500 kVALow sulphur diesel300.22OthersPM2.50.010
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 26797
(b)Source BSES
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 8 X 2000 kVA, 2 X 1000 kVA, 1x750 kVA, 1x600 kVA,
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 10.0686
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 10.0686
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot Area 10.0686
    Total (ha.) 10.0686
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area100.072678
Total (ha.) 100.072678
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0None
(2.)NPANone0None
(3.)ESZsNone0None
(4.)Wildlife CorridorsNone0None
(5.)ESAsNone0None
(6.)Critically Polluted AreaAnand Parbat Industrial Area1.04SE direction from project site
(7.)CorridorsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersRiverYamuna River6.74East direction from project site
(2.)Archaeological SitesSalimgarh Fort7.84East direction from project site
(3.)Defence InstallationsNone0None
(4.)ForestPusa Hill Forest5.53South direction from project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.0686
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Prasad Nagar Lake
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 2.55
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 285
(c)Temporary Employment- During Construction 600
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 885
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt302326190.21829213.218
(2.)Percentage of Total Project Area3.2928.4831.77
(3.)No. of Plants6954541149
(4.)Funds Allocated11500001635000017500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment opportunities will be generated for people of nearby area.
(2.)FinancialRevenue generation through taxes.
(3.)Environmental31.76 % of net plot area shall be developed as green area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 179.22
(b)Total No. of Flats to be Build 4762
(c)No. of Buildings 7
(d)Total plot area (sqm) 100686.00
(e)Total built up area (sqm) 1000726.78
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 33
(d)Capacity 870
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 8836 ECS
5.
Energy Saving Measures:
(a)Source/Mode solar and LED lamps
(b)Percentage 65
(c)Quantity 10118719
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No such impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 75/10th April 2019 at S.No.-119
(ii)Name of the EIA Consultant M/s Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th Floor, NN Mall, Mangalam Palace Sector 3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe proposal for amendment in the ToR was considered and recommended by the EAC in its 38th meeting held during 6-8 February, 2019. However, before issue of the Amendment letter, the project proponent has requested for correction/modification in the minute of the 38th meeting. The correction/modification will be considered in the next EAC meeting. Kindly apply for the Environmental Clearance after issue of Amendment in ToR letter. 07 Mar 2019
2.NAThe correction have been made as per the instruction received 23 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKapil Gupta
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)DLF HOMES DEVELOPERS LTD
AddressDLF Center Sansad Marg, New Delhi - 110001
Print