1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Privilege Industries Limited | (b)Name of the Company / Organisation | PRIVILEGE INDUSTRIES LTD | (c)Registered Address | 9-09 HDIL Towers, Anant Kanekar Marg, Bandra East, Mumbai,,Mumbai City,Maharashtra-400051 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sarang Rakeshkumar Wadhawan | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | 9-09 HDIL Towers, Anant Kanekar Marg, Bandra East, Mumbai,,Kurla,Mumbai City,Maharashtra-400051 | (d)Pin code | 400051 | (e)E-mail | info@privilegeindustries.com | (f)STD Code. | 22(f)Telephone No. | 26476060 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/IND2/97531/2010 | (d)Master Proposal Number(Single Window) | SW/97526/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. B-1, M.I.D.C. Lonand, Tal. Khandala, Sata | (b)Pincode | 415521 | (c)Bounded Latitudes (North) | | From | | Degree | 18342.24 | Minutes | | Second | | From | | Degree | 18357.52 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 741017.11 | Minutes | | Second | | From | | Degree | 741029.11 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43I4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 700 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7.5 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Adilabad | Tamsi | Korata | (2.) | Assam | Tinsukia | Doom Dooma | Baghjan, Dighaltarang | (3.) | Maharashtra | Yavatmal | Kelapur | Chanaka | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/381/2007-IA-II (I) | (c)Date of Issue of TOR | 02 Sep 2010 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 08 Nov 2010 | (c)Date of Issue of EC | 24 Jan 2011 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 05 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Near Factory Site | State : | Maharashtra | District : | Satara | Tehsil : | Khandala | Village : | lonand MIDC |
| 150 | Related to Air pollution and CSR Activity | Others | Addtional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-460/RON/2017-NGP | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 5 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | ENA/RS/MS/AA | 100 | 30 | 130 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Plant | 100 | 30 | 130 | Kilo Litre per Day | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Jan 2019 | (iv)Valid Upto | 31 Aug 2019 | (v)File No. | 1.0/BOICAC-CELL/UAN No. 0000053347 / R/CAC- 190100 | (vi)Application No. | 1.0/BOICAC-CELL/UAN No. 0000053347 / R/CAC- 190100 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 25 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 18.94 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.37 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.15 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 50 | (b)Existing quantity of raw material/fuel | 80 | (c)Total quantity of raw material/fuel | 130 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Grains | 310 | Others | Tonns per day | Indian market | Road | | 5.6 | Open Market | | Copy of Linkage | (2.) | FUEL | 130 | Others | Tons per day | Indian market | Road | | 6.0 | Open Market | | Copy of Linkage | (3.) | Water | 1150 | Kilo Litre per Day | | MIDC, Lonand | Road,Pipe Conveyor | | 6.5 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 81.3 | 50.2 | 64.9 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 41.1 | 22.8 | 37.6 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 20.0 | 10.3 | 17.6 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 30.4 | 18.0 | 24.0 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | cadmium | mg/l | | 0.0001 | 0.0000 | 0.003 | 0 | (2.) | TSS | | | mg/l | | 10.0 | 0.00 | 0 | 0 | (3.) | TDS | | | mg/l | | 853.5 | 425.0 | 500 | 2000 | (4.) | Fluoride | | | mg/l | | 0.61 | 0.14 | 1.0 | 1.5 | (5.) | pH | | | NA | | 8.02 | 6.97 | 6.5 | 8.5 | (6.) | Total Hardness | | | mg/l | | 408 | 279.0 | 200 | 600 | (7.) | Chlorides | | | mg/l | | 109.96 | 59.98 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.4 | 8.24 | A | (2.) | DO | | mg/l | | 6.8 | 4.6 | A | (3.) | BOD | | mg/l | | 7.3 | 6.1 | A | (4.) | COD | | mg/l | | 19.0 | 15.0 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 69.3 | 53.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.3 | 42.9 | 45 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 18.2 | 5.1 | (2.) | K(Potassium) | Kilogram per hectare | | 178 | 103 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 181.4 | 48.2 | (4.) | pH | | | 8.97 | 6.40 | (5.) | N(Nitrogen) | Kilogram per hectare | | 64.8 | 46.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | MIDC | 1150 | 12.0 | Copy of Permission Letter | Pipeline | | Intake Well | | 000185 | 07 May 2010 | 1500 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Distillery | 360 | 500 | ETP followed by RO | Others | reuse in process | 360 | 0 | (2.) | CPP | 130 | 500 | ETP followed by RO | Others | recycle in process | 130 | 0 | (3.) | Bottling Plant | 355 | 500 | ETP | Others | reuse in process | 355 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 845 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 845 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | DWGS | Industrial Waste | | 9300 | Tons | 50 | Road | | Others | Sold as cattle feed | (2.) | Bottom Ash | Industrial Waste | | 6.4 | Tons | 12.0 | Road | | Others | To fill the low laying areas | (3.) | Used Oil | Industrial Waste | | 2.0 | Kilolitre | 25 | Road | | Authorized Recyclers | | (4.) | DDGS | Industrial Waste | | 2400 | Tons | 50 | Road | | Others | Sold as cattle feed | (5.) | Fly Ash | Fly Ash | | 25.6 | Tons | 50 | Road | | Others | Sold to Brick manufactures | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 0 | 1.0 | 0 | 0.1 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 19.9 | 1.0 | 1.03 | 20.94 | 80 | (3.) | NOx | | Microgram per Meter Cube | 30.4 | 1.0 | 1.0 | 31.5 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 81.3 | 1.0 | 0.5 | 82.0 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | CPP | Coal | 50 | 2.7 | PM10 | | 3.63 | (2.) | CPP | Coal | 50 | 2.7 | SO2 | | 7.41 | (3.) | CPP | Coal | 50 | 2.7 | NOx | | 7.2 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4000 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1500 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 8.0710 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 8.0710 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 8.0710 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 8.071 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 3.52 | | (2.) | Others | Parking and Open Area | 1.86 | | (3.) | Green belt | | 2.69 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NONE | 0.0 | NA | (2.) | ESZs | NONE | 0.0 | NA | (3.) | Corridors | NONE | 0.0 | NA | (4.) | Wildlife Corridors | NONE | 0.0 | NA | (5.) | Critically Polluted Area | NONE | 0.0 | NA | (6.) | ESAs | NONE | 0.0 | NA | (7.) | WLS | NONE | 0.0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Waghoshi RF | 4.5 | SW | (2.) | Archaeological Sites | | none | 0.0 | NA | (3.) | Defence Installations | | none | 0.0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | no land is required | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Nira River | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 8.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 110 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 125 | (e)No. of working days | 330 | (f)Total Manpower | 235 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 2.67 | 0 | 2.67 | (2.) | Percentage of Total Project Area | 33.11 | 0 | 33.11 | (3.) | No. of Plants | 2864 | 1141 | 4005 | (4.) | Funds Allocated | 0 | 0.10 | 0.1 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Providing Employment | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0111 | (ii)Name of the EIA Consultant | Sri Sai Manasa Nature Tech Pvt Ltd | (iii)Address | Plot no 74/A, Flat no 102, central bank building, kalyan nagar , hyderabad | (iv)Mobile No. | 9010549549 | (v)Landline No. | 0402381633 | (vi)Email Id | rajani@ssmntech.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 05 Aug 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please submit/upload copy of the certified compliance report dated 27/9/2017 issued by the Regional Office. Also, mention all the relevant details for the ToR/EC against column 6 of Form-2. | 23 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 01 Apr 2019 | 3. | NA | Please see the observations dated 23/3/2019 for the needful to take the proposal forward. | 13 Apr 2019 | 4. | NA | The correction have been made as per the instruction received | 15 Apr 2019 | 5. | NA | Please see our observations dated 23/3/2019 & 13/4/2019 for the needful. | 19 Apr 2019 | 6. | NA | The correction have been made as per the instruction received | 24 Apr 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | |
|