Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Privilege Industries Limited
(b)Name of the Company / Organisation PRIVILEGE INDUSTRIES LTD
(c)Registered Address 9-09 HDIL Towers, Anant Kanekar Marg, Bandra East, Mumbai,,Mumbai City,Maharashtra-400051
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sarang Rakeshkumar Wadhawan
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 9-09 HDIL Towers, Anant Kanekar Marg, Bandra East, Mumbai,,Kurla,Mumbai City,Maharashtra-400051
(d)Pin code 400051
(e)E-mail info@privilegeindustries.com
(f)STD Code. 22(f)Telephone No. 26476060
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/97531/2010
(d)Master Proposal Number(Single Window) SW/97526/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 3
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. B-1, M.I.D.C. Lonand, Tal. Khandala, Sata
(b)Pincode 415521
(c)Bounded Latitudes (North)
From
Degree 18342.24
Minutes
Second
From
Degree 18357.52
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 741017.11
Minutes
Second
From
Degree 741029.11
Minutes
Second
(e)Survey of India Topo Sheet No. E43I4
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 700
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaAdilabadTamsiKorata
(2.)AssamTinsukiaDoom DoomaBaghjan, Dighaltarang
(3.)MaharashtraYavatmalKelapurChanaka
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/381/2007-IA-II (I)
(c)Date of Issue of TOR 02 Sep 2010
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 08 Nov 2010
(c)Date of Issue of EC 24 Jan 2011
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :04 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0
Near Factory Site
State :Maharashtra
District :Satara
Tehsil :Khandala
Village :lonand MIDC
150Related to Air pollution and CSR ActivityOthersAddtional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-460/RON/2017-NGP
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 5 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ENA/RS/MS/AA10030130Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Plant10030130Kilo Litre per Day
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Jan 2019
(iv)Valid Upto 31 Aug 2019
(v)File No. 1.0/BOICAC-CELL/UAN No. 0000053347 / R/CAC- 190100
(vi)Application No. 1.0/BOICAC-CELL/UAN No. 0000053347 / R/CAC- 190100
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 25
(b) Funds Allocated for Environment Management (Capital) (in Crores) 18.94
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.37
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 50
(b)Existing quantity of raw material/fuel 80
(c)Total quantity of raw material/fuel 130
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Grains310OthersTonns per dayIndian marketRoad5.6 Open MarketCopy of Linkage
(2.)FUEL130OthersTons per dayIndian marketRoad6.0 Open MarketCopy of Linkage
(3.)Water1150Kilo Litre per DayMIDC, LonandRoad,Pipe Conveyor6.5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube81.350.264.9100
(2.)PM2.5Micro Gram per Meter Cube41.122.837.660
(3.)SO2Micro Gram per Meter Cube20.010.317.680
(4.)NOxMicro Gram per Meter Cube30.418.024.080
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy Metalscadmiummg/l0.00010.00000.0030
(2.)TSSmg/l10.00.0000
(3.)TDSmg/l853.5425.05002000
(4.)Fluoridemg/l0.610.141.01.5
(5.)pHNA8.026.976.58.5
(6.)Total Hardnessmg/l408279.0200600
(7.)Chloridesmg/l109.9659.982501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.48.24A
(2.)DOmg/l6.84.6A
(3.)BODmg/l7.36.1A
(4.)CODmg/l19.015.0A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))69.353.575
(2.)Leq(Night)A-weighted decibels(dB(A))60.342.945
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare18.25.1
(2.)K(Potassium)Kilogram per hectare178103
(3.)Electric ConductivityMillisiemens per Centimetre181.448.2
(4.)pH8.976.40
(5.)N(Nitrogen)Kilogram per hectare64.846.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC115012.0Copy of Permission LetterPipelineIntake Well00018507 May 20101500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Distillery360500ETP followed by ROOthersreuse in process3600
(2.)CPP130500ETP followed by ROOthersrecycle in process1300
(3.)Bottling Plant355500ETPOthersreuse in process3550
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 845
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 845
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DWGSIndustrial Waste9300Tons50RoadOthersSold as cattle feed
(2.)Bottom AshIndustrial Waste6.4Tons12.0RoadOthersTo fill the low laying areas
(3.)Used OilIndustrial Waste2.0Kilolitre25RoadAuthorized Recyclers
(4.)DDGSIndustrial Waste2400Tons50RoadOthersSold as cattle feed
(5.)Fly AshFly Ash25.6Tons50RoadOthersSold to Brick manufactures
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube01.000.160
(2.)SO2Microgram per Meter Cube19.91.01.0320.9480
(3.)NOxMicrogram per Meter Cube30.41.01.031.580
(4.)PM10Microgram per Meter Cube81.31.00.582.0100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CPPCoal502.7PM103.63
(2.)CPPCoal502.7SO27.41
(3.)CPPCoal502.7NOx7.2
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1500
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 8.0710
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.0710
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 8.0710
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 8.071
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.52
(2.)OthersParking and Open Area1.86
(3.)Green belt2.69
Total (ha.) 8.07
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANONE0.0NA
(2.)ESZsNONE0.0NA
(3.)CorridorsNONE0.0NA
(4.)Wildlife CorridorsNONE0.0NA
(5.)Critically Polluted AreaNONE0.0NA
(6.)ESAsNONE0.0NA
(7.)WLSNONE0.0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestWaghoshi RF4.5SW
(2.)Archaeological Sitesnone0.0NA
(3.)Defence Installationsnone0.0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired no land is required
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nira River
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 8.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 110
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 125
(e)No. of working days 330
(f)Total Manpower 235
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt2.6702.67
(2.)Percentage of Total Project Area33.11033.11
(3.)No. of Plants286411414005
(4.)Funds Allocated00.100.1
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProviding Employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Industrial Projects - 3
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0111
(ii)Name of the EIA Consultant Sri Sai Manasa Nature Tech Pvt Ltd
(iii)Address Plot no 74/A, Flat no 102, central bank building, kalyan nagar , hyderabad
(iv)Mobile No. 9010549549
(v)Landline No. 0402381633
(vi)Email Id rajani@ssmntech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 3
(ix)Validity of Accreditation 05 Aug 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit/upload copy of the certified compliance report dated 27/9/2017 issued by the Regional Office. Also, mention all the relevant details for the ToR/EC against column 6 of Form-2. 23 Mar 2019
2.NAThe correction have been made as per the instruction received 01 Apr 2019
3.NAPlease see the observations dated 23/3/2019 for the needful to take the proposal forward. 13 Apr 2019
4.NAThe correction have been made as per the instruction received 15 Apr 2019
5.NAPlease see our observations dated 23/3/2019 & 13/4/2019 for the needful. 19 Apr 2019
6.NAThe correction have been made as per the instruction received 24 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA