EC Report
1.
Project Details
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? :
No
1.
Project Details
i. Proposal No. :
IA/TN/MIS/27389/2015
ii. MoEFCC File No. :
21-76/2015-IA-III
iii.Short narrative of the project:
Expansion of "Divyasree Point IT Park"
iv. Project Sector :
INFRA-2
v. Company/Proponent :
PADMANABHA
vi.Details of State of the project
Details of State of the project
S.no.
State Name
District Name
Tehsil Name
1.
Tamil Nadu
Kanchipuram
Kancheepuram
vii. Uploaded EC Compliance report by rigional office of MoEFCC:
NIL
viii. Certified Monitoring report by RoMoEF:
Annexure-Uploaded Monitoring report
ix.Date of TOR Granted
N/A
ix.Date of Submission for EC:
11 Apr 2015
x.Project Type:
Expansion
2.
Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP:
Annexure-EIA/EMP
ii.Risk Assessment:
Annexure-Risk Assessment
iii.Public Hearing:
Annexure-Public Hearing
iv. Date of Public Hearing:
11 Apr 2015
v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC:
Annexure-Additional Report/Study/Document
vi. Uploaded Cover Letter:
Annexure-Cover Letter
vii.Remarks:
This is expansion of construction project. Form 1,1A,Conceptual Plan, EMP are all uploaded. As this is a construction project there is no public hearing. The additional documents as EC, STP details, S
3.
Additional Detail Sought
Additional Detail Sought
Sno.
ADS Letter
Remarks
Date of ADS
1.
NA
The proposal was listed before EAC in its 150th meeting for Projects related to Infrastructure Development, Coastal Regulation Zone, Building/Construction and Miscellaneous projects held on 29th – 31st July, 2015. The EAC noted the submissions made by the PP and asked the PP for submission of the records/documents in respect of mixed land use pattern of the area, which would permit construction of Mall, Hotel and apartments therein. The EAC advised the PP to submit the certificate from concerned State Government department saying that the present proposal is as per existing norms, which allows construction of commercial complex in residential area. The EAC decided to defer the proposal.
17 Sep 2015
2.
ADS Letter
The affidavit, confirming that no additional construction of the project is uploaded along with the covering letter. Kindly note that the minutes uploaded for 150th meeting does not pertain to our project.
02 Jan 2016
4.
Accredited Consultant Details
i. Accreditation status :
Yes
ii. Accreditation No. :
77
iii. Name of Consultant:
Hubert Enviro Care Systems (P) LTD
iv. Address :
#18,92nd Street, Ashok Nagar, Chennai - 600 083
v. Mobile No.:
9884390811
vi. Landline No.:
4442985555
vii. Email Id:
moses@hecs.in
5.
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
i. Name of Applicant :
Padmanabha
ii. Designation :
Authorized Signatory
iii. Name of Company(Applicant Name should not be given here) :
PADMANABHA
iv. Address :
Divyasree Infrastructure Developers Pvt. Ltd. Door No 07, Rajiv Gandhi Salai, Old Mahabalipuram Road, Shollinganallur, Chennai
v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
NIL
Print