Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed forward Integration, expansion and product diversification programme of existing mini Steel Plant by installation of Sponge Iron Kiln (1x350 TPD), Induction Furnace (1x7 T) & modernization /
(b)Name of the Company / Organisation SALAGRAM POWER AND STEEL PRIVATE LIMITED
(c)Registered Address 29, Ganesh Chandra Avenue, 1st Floor, Kolkata-700 013,,Kolkata,West Bengal-700013
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Suyash Agarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address 29, Ganesh Chandra Avenue, 1st Floor, Kolkata-700 013,,Kolkata,Kolkata,West Bengal-700013
(d)Pin code 700013
(e)E-mail purchase@salagram.co.in
(f)STD Code. 33(f)Telephone No. 40112000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/WB/IND/97389/2008
(d)Master Proposal Number(Single Window) SW/97388/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Palitpur Road, Village & P.O Mirzapur, P.S. and Di
(b)Pincode 700013
(c)Bounded Latitudes (North)
From
Degree 23.284
Minutes
Second
From
Degree 23.288
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.867
Minutes
Second
From
Degree 87.871
Minutes
Second
(e)Survey of India Topo Sheet No. .
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 32.6
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area .
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number EN/2197/T-II-1/044/2008
(b)Date of Apply of TOR 02 Dec 2008
(c)Date of Issue of TOR / Standard ToR 26 Dec 2008
(d)Date of Apply of EC 03 Mar 2009
(e)Date of Issue of EC 19 Aug 2009
(d)Previous TOR Letter NA
(g)Previous EC Letter NA
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :06 Nov 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Dec 2018
Distance of Public Hearing Venue from the Proposed Project :2.0
Meeting Hall of Burdwan-I Panchayet Samity, District: Purba Bardhaman in West Bengal
State :West Bengal
District :Barddhaman
Tehsil :Burdwan - I
Village :Mirzapur
75Job, Pollution, Plantation etc.District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. -
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 14 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)TMT BARS, RODS, FLATS & STRUCTURAL/5400046000100000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)DRI, IF, ROLLING MILL ETCDRI, IF, CPPDRI, IF, ROLLING MILL, SINTER, SAF, CPPDRI, IF, ROLLING MILL, SINTER, SAF, CPP-
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 29 Jun 2016
(iv)Valid Upto 30 Jun 2019
(v)File No. 1212-7/WPBD-CONT(752)/99
(vi)Application No. CO100575
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 108
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.54
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel .
(b)Existing quantity of raw material/fuel .
(c)Total quantity of raw material/fuel NaN
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Coal150000Tons per AnnumMARKETRoad,Rail. Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube19618.880
(2.)PM10Micro Gram per Meter Cube11258106.3100
(3.)NOxMicro Gram per Meter Cube39143680
(4.)PM2.5Micro Gram per Meter Cube50.42147.260
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l420315..
(2.)Chloridesmg/l10684..
(3.)Heavy MetalsFemg/l0.280.19..
(4.)TSSmg/l....
(5.)Total Hardnessmg/l301223..
(6.)pHNA7.77.1..
(7.)Fluoridemg/l0.480.3..
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.27.1C
(2.)OthersFemg/l0.180.17C
(3.)BODmg/l54C
(4.)pHNA7.57.4C
(5.)CODmg/l..C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))70.156.7.
(2.)Leq(Night)A-weighted decibels(dB(A))61.146.3.
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH5.75.2
(2.)P(Phosphorus)Percent0.160.13
(3.)K(Potassium)Percent0.380.33
(4.)N(Nitrogen)Percent0.420.35
(5.)Electric ConductivityOthersµmhos/cm552489
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.5 To 2.1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 6.7 To 9
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater365.Copy of Permission LetterPipelineTube Well.11 Mar 2010870
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)INDUSTRIAL6475ETPReuse within the Plant & Recycling64
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 64
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 64
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)INDUSTRIALIndustrial Waste52500Tons.RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube79.20.34.8.100
(2.)PM2.5Microgram per Meter Cube.....
(3.)SO2Microgram per Meter Cube11.10.80.464.80
(4.)NOxMicrogram per Meter Cube23.90.80.349.80
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)STACKSCOAL..PM10.
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 24500
(b)Source Captive Power Plant which will generate 16 MW afte
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) .
(e)Stack Height (in m) .
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 11.654
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 11.654
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 11.654
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : 0.654 0.0
    Total (ha.) 11.654
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant7.809-
(2.)Township0.0-
(3.)Green belt3.845-
(4.)Ash Pond0.0-
(5.)Quarry Area0.0-
(6.)OB Dump Area0.0-
(7.)Safety Zone0.0-
(8.)Tailing Pond0.0-
(9.)LandFill0.0-
(10.)Water Reservoir0.0-
(11.)Desalination Plant0.0-
(12.)Area for Solid Waste Management0.0-
(13.)Built Up Area0.0-
Total (ha.) 11.654
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area-.-
(2.)WLSRamnabagan Wildlife Sanctuary4.0-
(3.)ESZs-.-
(4.)Corridors-.-
(5.)NPA-.-
(6.)Wildlife Corridors-.-
(7.)ESAs-.-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest-.-
(2.)Defence Installations-.-
(3.)Archaeological Sites-.-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0.0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.654
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired 0.0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0.0
(b)No. of Households 0.0
(c)No. of PDFs (Project Displaced Families) 0.0
(d)No. of PAFs (Project Affected Families) 0.0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0.0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area DAMODAR RIVER
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0.0
(b)Permanent Employment-During Operation 195
(c)Temporary Employment- During Construction 0.0
(d)Temporary Employment- During Operation 139
(e)No. of working days 300
(f)Total Manpower 334
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1.8452.03.8449999999999998
(2.)Percentage of Total Project Area..NaN
(3.)No. of Plants..NaN
(4.)Funds Allocated..NaN
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialJob & Infrastructure Development of the Area
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1011/010
(ii)Name of the EIA Consultant ENVIROTECH EAST PVT LIMITED
(iii)Address Bengal Ambuja Commercial Complex UN F13, 1050/1, Survey Park, Kolkata-700 075
(iv)Mobile No. 9331026867
(v)Landline No. 0332418812
(vi)Email Id eeplkol@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 13 Mar 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is returned due to the following: • PM10 in Ambient Air is reported as 112 mg/Nm3. Reasons for the higher value and action plan to control the emissions with the prescribed limit shall be furnished. • Permission for water drawl is only for 300KLD. Permission for water drawl of remaining quantity of 565 KLD shall be furnished. • Ramnabagan Wildlife Sanctuary is at a distance of 4km from the project site. Yin this regard, clearance obtained from the Standing Committee for National Board of Wildlife shall be furnished. However, in the form 2, it is mentioned that NBWL permission is not applicable. Reasons for not giving the factual status in Form 2 shall be submitted. • Social impact assessment study report shall be submitted. • In the certified compliance report of WBPCB, observations have been made by RO stating that non-compliances with regard to stack emissions and fugitive emissions were noticed. For several specific conditions, it is mentioned that full compliance is yet to be achieved. Corrective actions taken to the observed non-compliance and the closure report from RO, WBPCB shall be furnished. 13 Aug 2019
2.NAProposal is returned due to the following: . PM10 in Ambient Air is reported as 112 mg/Nm3. Reasons for the higher value and action plan to control the emissions with the prescribed limit shall be furnished. • Permission for water drawl is only for 300KLD. Permission for water drawl of remaining quantity of 565 KLD shall be furnished. • Ramnabagan Wildlife Sanctuary is at a distance of 4km from the project site. Yin this regard, clearance obtained from the Standing Committee for National Board of Wildlife shall be furnished. However, in the form 2, it is mentioned that NBWL permission is not applicable. Reasons for not giving the factual status in Form 2 shall be submitted. • Social impact assessment study report shall be submitted. • In the certified compliance report of WBPCB, observations have been made by RO stating that non-compliances with regard to stack emissions and fugitive emissions were noticed. For several specific conditions, it is mentioned that full compliance is yet to be achieved. Corrective actions taken to the observed non-compliance and the closure report from RO, WBPCB shall be furnished. 13 Aug 2019
3.NAProposal is returned due to the following: • PM10 in Ambient Air is reported as 112 mg/Nm3. Reasons for the higher value and action plan to control the emissions with the prescribed limit shall be furnished. • Permission for water drawl is only for 300KLD. Permission for water drawl of remaining quantity of 565 KLD shall be furnished. • Ramnabagan Wildlife Sanctuary is at a distance of 4km from the project site. Yin this regard, clearance obtained from the Standing Committee for National Board of Wildlife shall be furnished. However, in the form 2, it is mentioned that NBWL permission is not applicable. Reasons for not giving the factual status in Form 2 shall be submitted. • Social impact assessment study report shall be submitted. • In the certified compliance report of WBPCB, observations have been made by RO stating that non-compliances with regard to stack emissions and fugitive emissions were noticed. For several specific conditions, it is mentioned that full compliance is yet to be achieved. Corrective actions taken to the observed non-compliance and the closure report from RO, WBPCB shall be furnished. 13 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSuyash Agarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)SALAGRAM POWER AND STEEL PRIVATE LIMITED
Address29, Ganesh Chandra Avenue, 1st Floor, Kolkata-700 013
Print