Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sharp Chemicals
(b)Name of the Company / Organisation M/S. SHARP CHEMICALS
(c)Registered Address survey no 322 village lunej taluka khambhat dist anand,,Anand,Gujarat-388620
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Paresh R PATEL
(b)Designation (Owner/ Partner/ CEO) PARTNER
(c)Address 10 GEBANSA ESTATE OPP SWAMINARAYAN TEMPLE METPUR ROAD KHAMBHAT,,Khambhat,Anand,Gujarat-388620
(d)Pin code 388620
(e)E-mail sharpchemicals123@yahoo.com
(f)STD Code. 79(f)Telephone No. 26583099
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/73155/2018
(d)Master Proposal Number(Single Window) SW/97342/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 322, Village: Lunej
(b)Pincode 388620
(c)Bounded Latitudes (North)
From
Degree 22.346238
Minutes
Second
From
Degree 22.346953
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.582681
Minutes
Second
From
Degree 72.583044
Minutes
Second
(e)Survey of India Topo Sheet No. F43G11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 9
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 33
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratAnandKhambhat
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/68/2018-IA-II(I)
(b)Date of Apply of TOR 22 Feb 2018
(c)Date of Issue of TOR / Standard ToR 01 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :27 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0
Survey No. 322, Village: Lunej
State :Gujarat
District :Anand
Tehsil :Khambhat
Village :Lunej
140local employment, greenbelt development, and Check dam construction on seasonal canalOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ribbon blender8 KL
(2.)HAG7.5 lakhs Kcal/hr.
(3.)Spray Dryer (2 nos)2500 lit/hr. each
(4.)Reactors10 nos
(5.)Ball mills4 nos
(6.)Boiler2 TPH
(7.)D G Set125 kVA
(8.)HAG (2 nos)20 lakhs Kcal/hr. each
(9.)Spray Dryer1000 lit/hr.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Reactive Yellow 145600Tons per AnnumRoad
(2.)Reactive Orange 122300Tons per AnnumRoad
(3.)Reactive Orange 84600Tons per AnnumRoad
(4.)Reactive Red 24600Tons per AnnumRoad
(5.)Reactive Black 5 & mixture3780Tons per AnnumRoad
(6.)Reactive Blue HEXL900Tons per AnnumRoad
(7.)Reactive Blue 220600Tons per AnnumRoad
(8.)Reactive Blue 49/P3R480Tons per AnnumRoad
(9.)Reactive Navy Blue HER (Reactive Blue 171)900Tons per AnnumRoad
(10.)Reactive Orange H2R (Reactive Orange 13)120Tons per AnnumRoad
(11.)Reactive Orange 2R (Reactive Orange 7)1200Tons per AnnumRoad
(12.)Reactive Red 195600Tons per AnnumRoad
(13.)Reactive Red 111120Tons per AnnumRoad
(14.)Reactive Red 245120Tons per AnnumRoad
(15.)Reactive Red CD600Tons per AnnumRoad
(16.)Reactive Blue HEGN (Reactive Blue 198)480Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.7
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 12000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 12000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)12000Tons per AnnumopenmarketRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube77.553.772100
(2.)SO2Micro Gram per Meter Cube17.79.214.580
(3.)NOxMicro Gram per Meter Cube24.211.219.780
(4.)PM2.5Micro Gram per Meter Cube44.924.64060
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l18.87.500
(2.)Fluoridemg/l0.720.4111.5
(3.)pHNA7.677.346.58.5
(4.)Total Hardnessmg/l612362300600
(5.)TDSmg/l246511545002000
(6.)Chloridesmg/l12485382501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.97.4A
(2.)DOmg/l4.23.7C
(3.)BODmg/l23.511.8D
(4.)CODmg/l54.125.6D
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.850.875
(2.)Leq(Night)A-weighted decibels(dB(A))41.938.570
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram1710
(2.)K(Potassium)Milligram per Kilogram242136
(3.)Electric ConductivityOthersdS/m3.62.2
(4.)pHMilligram per Kilogram7.837.39
(5.)N(Nitrogen)Milligram per Kilogram152123
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 26.56 To 3.15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.05 To 23.54
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater61.50Copy of Permission LetterPipelineOthersborewell21-4/4832/GJ/IND/201926 Feb 201961.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial104150ETP-RO-Spray dryerReuse within the Plant & Recycling104
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 104
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 104
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludge and spray dryer saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)570Tons57RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.25Kilolitre45RoadAuthorized Recyclers
(3.)Discarded containers and bagsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)90Tons65RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube34.501.412.86637.36760
(2.)SO2Microgram per Meter Cube11.51.410.66812.1780
(3.)NOxMicrogram per Meter Cube15.21.410.65315.8680
(4.)PM10Microgram per Meter Cube64.941.412.86667.807100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD110.3OthersPM, SO2, NOx00
(2.)Boilercoal210.45OthersPM, SO2, NOx00
(3.)Hot air generators - 30noscoal300.6OthersPM, SO2, NOx00
(4.)Spray dryernone210.6PM1000
(5.)Spray dryer 2none210.6PM1000
(6.)Spray dryer 3none210.6PM1000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 450
(b)Source MGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 125
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.7
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.7
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 16280
(b)Waste/Barren Land (ha.) 220
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 980
(e)Settlements (ha.) 1060
(f)Industrial (ha.) 390
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Bays and Estuaries, Dry Salt Flats, Tidal Flat 12490
    Total (ha.) 31420
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.2
(2.)Green belt0.23
(3.)OthersParking, roads and open area0.25Parking, roads and open area
(4.)Built Up Area0.02
Total (ha.) 0.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsMount Abu240None within 10 km
(2.)CorridorsNone within 10 km00None within 10 km
(3.)Wildlife CorridorsGir National Park228None within 10 km
(4.)NPABlackbuck National Park Velavadar65None within 10 km
(5.)Critically Polluted AreaNone within 10 km00None within 10 km
(6.)WLSThol Wildlife Sanctuary88None within 10 km
(7.)ESZsNal Sarovar Birds Sanctuary68None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestRatanmahal Sloth Bear Sanctuary145None within 10 km
(2.)Defence InstallationsKuchchh400None within 10 km
(3.)Archaeological SitesLothal40None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.7
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pond of Neja
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond of Akhol and khambhat
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 5.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 0
(e)No. of working days 26
(f)Total Manpower 65
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.23
(b)Percentage of Total Project Area 32.86
(c)No. of Plants to be Planted 250
(d)Funds Allocated for Plantation 3
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0084
(ii)Name of the EIA Consultant San Envirotech Pvt. Ltd., Ahmedabad
(iii)Address 401/402/423/424/324, Medicine Market, Opp. Shefali Centre, Paldi cross Road, Ahmedabad
(iv)Mobile No. 9825007201
(v)Landline No. 0792658307
(vi)Email Id mahendra.sepl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are in conformity with permitted land use of the area. This needs to be confirmed along with the supporting documents. - Comments of SPCB on allowing such polluting industrial units in non-industrial areas. - Status of the required clearance from CGWA for ground water withdrawal. 14 Mar 2019
2.NAThe correction have been made as per the instruction received 23 Apr 2019
3.NAThere is no proper reply to our earlier observations dated 14/3/2019. Please submit supporting documents from GPCB to authenticate your reply. Further, request for ground water withdrawal is yet to be accepted and recommended by the CGWB Regional Office. 30 Apr 2019
4.NAThe correction have been made as per the instruction received 24 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantParesh R PATEL
DesignationPARTNER
Name of Company (Applicant Name should not be given here)M/S. SHARP CHEMICALS
Addresssurvey no 322 village lunej taluka khambhat dist anand