Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) One Time Expansion of Marki Mangli-I Coal Mine from 0.30 MTPA to 0.333 MTPA (Normative)/0.42 MTPA (Peak Capacity) without change in Lease hold area, Mining Method
(b)Name of the Company / Organisation TOPWORTH URJA AND METALS LTD
(c)Registered Address 126-128 SHRIRAM TOWER KINGS WAY SADAR NAGPUR,,Nagpur,Maharashtra-440010
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant HRISHARAN KHARE
(b)Designation (Owner/ Partner/ CEO) CHIEF
(c)Address 126 SHRIRAM TOWER KINGS WAY SADAR NAGPUR,,Nagpur (Urban),Nagpur,Maharashtra-440010
(d)Pin code 440010
(e)E-mail sanjay.dak@topworthgroup.com
(f)STD Code. 712(f)Telephone No. 2527122
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/MH/CMIN/96726/2005
(d)Master Proposal Number(Single Window) SW/96712/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type One time capacity expansion(only for Coal Mining)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. AS PER ANNEXURE-1
(b)Pincode 445305
(c)Bounded Latitudes (North)
From
Degree 19.84101
Minutes
Second
From
Degree 19.86539
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.76265
Minutes
Second
From
Degree 78.80951
Minutes
Second
(e)Survey of India Topo Sheet No. 56I/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 230
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/256/2006-IA-II (I)
(c)Date of Issue of TOR 05 Oct 2005
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 01 Jun 2019
(c)Date of Issue of EC 28 Apr 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason THIS PROPOSAL IS FOR ONE TIME EXPANSION OF COAL MI
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. EC-286/RON/2017-NGP/2245 Dated 09.08.2017
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 29 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)731.4230000033000333000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)OC UG METHOD AS PER APPROVED MPDiesel Backhoe two nosDiesel Backhoe two nosDiesel Backhoe two nosOne Time Capacity Expansion
(2.)OC UG METHOD AS PER APPROVED MPtipper 16 Te - 11 nostipper 16 Te - 11nostipper 16 Te - 11nosOne Time Capacity Expansion
(3.)OC UG METHOD AS PER APPROVED MPdiesel drill 110 mm 3 nosdiesel drill 110 mm 3 nosdiesel drill 110 mm 3 nosOne Time Capacity Expansion
(4.)OC UG METHOD AS PER APPROVED MPdozer 2 nosdozer 2 nosdozer 2 nosproposal is for one time capacity expansion using existing configurations
(5.)OC UG METHOD AS PER APPROVED MPfe Loader 1 nofe loader 1 nofe loader 1 noOne Time Capacity Expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Feb 2017
(iv)Valid Upto 31 Mar 2021
(v)File No. UAN NO. 4115
(vi)Application No. UAN NO. 4115
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 100
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.58
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.15
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.245
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel1200Kilo Litre per Daylocal dealerRoad8 Open MarketCopy of Linkage
(2.)Explosives400Tons per AnnumExplosive DealerRoad70 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 27 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 09
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube26.917.426.7060
(2.)SO2Micro Gram per Meter Cube20.414.120.0580
(3.)NOxMicro Gram per Meter Cube22.914.921.980
(4.)PM10Micro Gram per Meter Cube70.542.169.50100
    14.2.     No. of Ground Water monitoring locations : 05
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l840276200600
(2.)Heavy Metalsas Cadmiummg/l0.0010.0010.0030.003
(3.)TSSmg/l38357100100
(4.)pHNA7.607.216.58.5
(5.)TDSmg/l23284405002000
(6.)Fluoridemg/l0.1400.07811.5
(7.)OthersSulphates as SO4mg/l19555200400
(8.)Chloridesmg/l252202501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.31.9C
(2.)pHNA7.757.37C
(3.)BODmg/l7.22.5C
(4.)CODmg/l18.48.0C
    14.4.     No. of Ambient Noise monitoring locations : 09
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))82.353.770
(2.)Leq(Day)A-weighted decibels(dB(A))79.153.675
    14.5.     No. of Soil Sample Monitored locations : 04
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare695314
(2.)pH7.757.37
(3.)P(Phosphorus)Kilogram per hectare3833
(4.)Electric ConductivityMillisiemens per Centimetre330223
(5.)N(Nitrogen)Kilogram per hectare205120
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.66 To 5.80
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.30 To 8.50
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. CGWA / NGC / MINE / ORIG / 2017 / 2528
(f)Date of Issue 07 Apr 2017
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater12370Copy of Permission LetterPipelineTube WellCGWA / NGC / MINE / ORIG / 2017 / 252807 Apr 201712
(2.)OthersMine Pit Water8270Copy of Permission LetterPipelineOthersMine Pit WaterCGWA / NGC / MINE / ORIG / 2017 / 252807 Apr 2017827
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Nil000OthersNot Applicable00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SOilOthersSoil420000Tons0.250RoadOthersstacking as dump
(2.)Over BurdenOthersOver Burden2722500Tons0.400RoadOthersstacking as dump
(3.)Parting BandOthersParting Band295500Tons0.400RoadOthersstacking as dump
(4.)Top SoilOthersTop Soil43500Tons0.250RoadOthersstacking as dump
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.500.871.4100
(2.)PM2.5Microgram per Meter Cube26.800.0226.8360
(3.)SO2Microgram per Meter Cube19.900.0419.9480
(4.)NOxMicrogram per Meter Cube22.900.0722.9880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Not Applicable000OthersNil0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0.44
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 65 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 718.47
(c)Government Land (ha.) 12.95
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 731.42
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 718.47
(b)Waste/Barren Land (ha.) 12.95
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 731.4200000000001
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area97.2for all three OC pits
(2.)Safety Zone20
(3.)OB Dump Area4028 OB Dump +12 Soil Dump
(4.)OthersUndistrurbed Area /Mining rights for UG Mine501.92
(5.)Built Up Area72.3Com. Ifra,UG infra,Embankment,NallaRoad Diversion
Total (ha.) 731.42
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0Not Applicable
(2.)NPANot Applicable0Not Applicable
(3.)ESZsNot Applicable0Not Applicable
(4.)ESAsNot Applicable0Not Applicable
(5.)CorridorsNot Applicable0Not Applicable
(6.)Wildlife CorridorsNot Applicable0Not Applicable
(7.)Critically Polluted AreaNot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsO.F. Chanda45North East
(2.)Archaeological SitesNo Site within 10 Km0Not Applicable
(3.)ForestPavnar Reserve Forest2.00North of Project
(4.)OthersNearest RiverPenganga River7.5South
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 56.867
(b)Land yet to be acquired(Ha) 135.415
(c)Status of Land acquisition if not acquired Pending at Sate Govt for apponitment of Administra
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 122
(e)Funds Allocated for R&R(in INR) (in Lacs) 15640
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pavnar Water Body, Upasa and Bhanduk Nalla
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Yes for Bhanduk Nallah
(ii)Details of Study Conducted Not Available as already Diverted by Prior Allotte
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Penganga River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 994
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 994
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt16.83119.87136.7
(2.)Percentage of Total Project Area2.3016.3818.68
(3.)No. of Plants24257257575000
(4.)Funds Allocated75000075000008250000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. An Inventory of 7500 Plants will created every year 2. A Water Body of 15.24 Ha will be created at the end of mine life which will be utilized as percolation tank.
(2.)Social1. Fund of 16,50,000/- as a recurring budget per year will be utilized to implement need base social welfare activities. 2. Direct employment to 994 people will be generated viz-a-viz the same number of indirect employment will also be generated. 3. Existing direct & indirect employment as off dated is more than 400 souls. Infra Benefits 1. Local Road Network will be developed 2. Communication network will be developed 3. Literacy among the people will be developed
(3.)FinancialMarki Mangli – I Coal Mine projects is also contributing the State/National exchequer in the form of Royalty, District Mineral Foundation (DMF), National Mineral Exploration Trust (NMET), Income Tax from salaries and contract payments and other taxes from direct-indirect purchase. Apart from it captive coal requirement of the project proponent will be fulfilled.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 0.30 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 34011/30/2017- CPAM
(b)Date of Approval 05 Oct 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 692.201
(f)Approved Capacity 0.42
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 24.26
(b)Mineable Reserves (Million Ton) 21.17
(c)Extractable Reserves(Million Ton) 10.49
(d)Percent(%) of Extraction 49.55
(e)Grade of Coal /Ore /Mineral G-12
(f)Stripping Ratio 1 : 6.43
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) Degree -I Gaseousness Seam
(h)Average Gradient(Degree) 1 in 6
(i)Mining Method Mixed
(j)Life of Mine (Years) 30
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 1
(c)Thickness of seams to be worked on 3.88
(d)Maximum Thickness of Seams (metres) 4.67
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 731.42
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 28 Mar 2016
(iii)Validity of LOI 30
(iv)Reference No. of LOI MMN-1215/CR118/IND-9
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 682.78
(iii)Validity of the lease deed From : 09 Feb 2017 To : 08 Feb 2047
(iv)Date of Execution of Mining Lese 09 Feb 2017
(v)Reference Number 61/2017
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof MM-I coal mine is vested to TUML
9.
OB (Over Burden) Management:
Details Not Applicable
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.291
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0.221
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.07
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 15.24 (hectare) at a Depth of 18 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 97.20
13.
Details of Transportation:
(a)In Pit/Underground to Surface Pit to Surface by Dumpers in OC
(b)Surface to Siding/Loading by Dumpers in OC mining
(c)Transportation / Conveyor Details Transportation by Trucks by Roads
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)WASTE LAND12.95012.95
(2.)GRAZING LAND000
(3.)SURFACE WATER BODIES000
(4.)FOREST LAND000
(5.)AGRICULTURE LAND681.28211.422692.704
(6.)OTHERS(Specify)Excluded025.76625.766
(7.)SETTLEMENTS000
TOTAL694.23237.188731.42
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE120012
(2.)ROADS9.7008.4218.12
(3.)OtherSafet Zone2001030
(4.)VIRGIN AREA50501.92506.92
(5.)EXTERNAL OB DUMPS280028
(6.)INTERNAL OB DUMPS0000
(7.)GREEN BELT1.96001.96
(8.)EXCAVATION/QUARRY81.9615.24097.2
(9.)BUILT UP AREA (COLONY/OFFICE)virgin Area UG Mine0000
TOTAL158.6215.24520.340694.2
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare)
(b)Internal Dump(in hectare)
(c)Quarry(in hectare)
(d)Safety Zone(in hectare)
(e)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.)
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc)
(h)Total afforestation plant (in hectare)
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20150.300.300.380000
(2.)20180.300.300.360.2350980
(3.)20100.300.300.030.0150
(4.)20120.300.300.330.0658050
(5.)20140.300.300.380.03088100
(6.)20160.300.300.380000
(7.)20110.300.300.230.0028670
(8.)20170.300.300.380.1749600
(9.)20130.300.300.340.08070
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/SA036 (Rev.01)
(ii)Name of the EIA Consultant Enviro Techno Consult Private Limited
(iii)Address 68, Mahakali Nagar, Near Manewada Square, Nagpur -440034
(iv)Mobile No. 9225230146
(v)Landline No. 0712275634
(vi)Email Id etcpl@envirotechnoconsult.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 27 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - NABET accreditation of EIA consultant is valid up to 28/6/2018. As such, the the proposal for EC (EIA/EMP) is not acceptable. - Mining lease has been executed for an area of 682.78 ha. Whereas, the area proposed for expansion is 731.42 ha. 19 Apr 2019
2.NAThe correction have been made as per the instruction received 01 Jun 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRequest Letter for consideration of Proposal in next EAC Meeting. 12 Dec 2019
2.NA

The project proponent sought for relief for not attending the EAC meeting. Therefore, the proposal was not taken up for consideration

23 Sep 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantHRISHARAN KHARE
DesignationCHIEF
Name of Company (Applicant Name should not be given here)TOPWORTH URJA AND METALS LTD
Address126-128 SHRIRAM TOWER KINGS WAY SADAR NAGPUR
Print