(a)Name of the project(s) Gourandih ABC Coal Mine
(b)Name of the Company / Organisation WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED
(c)Registered Address 13, NELLIE SENGUPTA SARANI 2ND FLOOR, KOLKATA nlin,,Kolkata,West Bengal-700087
(d)Legal Status of the Company State PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant KRISHNENDU SADHUKHAN
(b)Designation (Owner/ Partner/ CEO) MANAGING DIRECTOR
(c)Address 13, NELLIE SENGUPTA SARANI 2ND FLOOR, KOLKATA,,,Kolkata,West Bengal-700087
(d)Pin code 700087
(e)E-mail wbmdtcltd@gmail.com
(f)STD Code. 33(f)Telephone No. 22522170
(g)Fax No. 22521653
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/WB/CMIN/65801/2017
(d)Master Proposal Number(Single Window) SW/96599/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. several plots as given in additional documents
(b)Pincode 700087
(c)Bounded Latitudes (North)
From
Degree 23.80833
Minutes
Second
From
Degree 23.82917
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.9625
Minutes
Second
From
Degree 87.00417
Minutes
Second
(e)Survey of India Topo Sheet No. Open series map no. F45C13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 174
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)West BengalBarddhamanBarabani
(2.)West BengalBarddhamanBarabaniPanuria and seven other villeges
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/80/2017-IA-II(M)
(b)Date of Apply of TOR 28 Aug 2017
(c)Date of Issue of TOR / Standard ToR 29 Sep 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Aug 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Sep 2018
Distance of Public Hearing Venue from the Proposed Project :8.5
Agniveena Hall at the Office campus of Barabani Block Office
State :West Bengal
District :Paschim bardhaman
Tehsil :Barabani
Village :Barabani
129Mainly related to probable air pollution, effect on GW table, effect of blasting etc. and mitigation measures. details are given in para 7.3 in Chapter 7 of EIA.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Opencast coal mining project213.27 Ha ML AreaTotal Project area: 356.575 Ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal production2500000Tons per AnnumOthersRoad or Road cum rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 600
(b) Funds Allocated for Environment Management (Capital) (in Crores) 17.27
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 6.217
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 16.92
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 16.92
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel16.92OthersMillion liters per annumOpen marketRoad3 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 28 Feb 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube45.324.644.8560
(2.)PM10Micro Gram per Meter Cube784577.21100
(3.)NOxMicro Gram per Meter Cube16.78.316.3080
(4.)SO2Micro Gram per Meter Cube12.16.311.9180
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthers-6.926.566.58.5
(2.)Total Hardnessmg/l25744200600
(3.)Chloridesmg/l135142501000
(4.)Fluoridemg/l1.10.4111.5
(5.)TSSmg/l304..
(6.)TDSmg/l7181765002000
(7.)OthersAlkalinitymg/l42084200600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l6910E
(2.)OthersTotal ColiformOthersMPN/100 ml4710A
(3.)pHNA8.26.9A
(4.)BODmg/l305E
(5.)DOmg/l7.16.5A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.2446.7655
(2.)Leq(Night)A-weighted decibels(dB(A))43.9940.6145
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.305.90
(2.)N(Nitrogen)Othersmg/kg56.676.67
(3.)P(Phosphorus)Othersmg/kg0.170.02
(4.)K(Potassium)Kilogram per hectaremg/kg37053
(5.)Electric ConductivityOthersmS/cm0.3680.221
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.43 To 19.03
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.03 To 31.0
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. MDTC/PM-5/144(Env)/530
(f)Date of Issue 25 May 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater9840Copy of Permission LetterPipelineOthersMine sumpP2205010022320000001THE09 Dec 201910800
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Colonies365.6400STPOthersreused in colony365.60
(2.)Pit head27.2.Septic tankOtherssoak pit027.2
(3.)workshop2040OWS & TankOthersRecirculation200
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 412.8
(b)Total Discharged Water (Kilolitre per Day) 27.2
(c)Total Reused Water (Kilolitre per Day) 385.6
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Top soilConstruction & Demolition Waste744000Tons0OthersHaul roadOthersTemporary storage & reuse
(2.)Sludge septik tankMunicipal Solid Waste2.5Tons0OthersRoadOtherscomposted to be used as manure
(3.)STP sludgeMunicipal Solid Waste17.25Tons2RoadOtherscomposted to be used as manure
(4.)Municipal solid wasteMunicipal Solid Waste197.5Tons2RoadOthersSegregated & sent to authorised vendor
(5.)Oil & greaseIndustrial Waste0.528Tons0OthersClosed tankOthersSold to SPCB/ CPCB authorised vendors
(6.)OB dumpIndustrial Waste17400000Tons0OthersHaul roadOthersTemporary dump& reuse in backfilling
(7.)Settling pond sludgeIndustrial Waste852.85Tons0RoadOthersDisposed in the OB dump area
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube45.31.511.45856.75860
(2.)NOxMicrogram per Meter Cube16.71.531.4948.280
(3.)PM10Microgram per Meter Cube78.01.519.91697.92100
(4.)SO2Microgram per Meter Cube12.11.526.12538.2380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set (5230 KVA)Diesel230.61OthersPM2.50.038521
(2.)DG set (5230 KVA)Diesel230.61SO21.284500
(3.)DG set (5230 KVA)Diesel230.61NOx3.382440
(4.)DG set (820 KVA)Diesel130.25PM100.013667
(5.)DG set (820 KVA)Diesel130.25SO20.211167
(6.)DG set (820 KVA)Diesel130.25OthersPM2.50.007858
(7.)DG set (820 KVA)Diesel130.25NOx0.728889
(8.)DG set (5230 KVA)Diesel230.61PM100.066994
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 6050
(b)Source West Bengal State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 6050
(e)Stack Height (in m) 23
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 109.459
(b)Private Land (ha.) 166.017
(c)Government Land (ha.) 72.081
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 9.018
    Total Land (ha.) 356.575
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 48.43
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 15.44
(e)Settlements (ha.) 60.86
(f)Industrial (ha.) 0
(g)Forest (ha.) 109.459
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : fallow land (danga) land+old quarry+non agricultur 122.386
    Total (ha.) 356.5750
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area213.27
(2.)OB Dump Area76.7OB+Top soil
(3.)Built Up Area27.23
(4.)Safety Zone7.52Green belt
(5.)OthersUndisturbed area and road31.85
Total (ha.) 356.57
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL.No critically polluted area within 10 km
(2.)Wildlife CorridorsNIL.No Wildlife corridors within 10 km
(3.)NPANIL.NA
(4.)CorridorsNIL.NA
(5.)ESZsNIL.NA
(6.)WLSNIL.No WLS within 10 km
(7.)ESAsNIL.NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNIL.NA
(2.)ForestForest within project arae0109.459 ha is forest within project area
(3.)Defence InstallationsNIL.No defence installation within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status PENDING WITH-SG
(b)Legal Status of Forest Land Protected
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 356.575
(c)Status of Land acquisition if not acquired Out of 356.575 Ha of Project Land, 109.459 Ha is F
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 7
(b)No. of Households 629
(c)No. of PDFs (Project Displaced Families) 629
(d)No. of PAFs (Project Affected Families) 1708
(e)Funds Allocated for R&R(in INR) (in Lacs) 10595
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Sloth Bear & Rock Python
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 15.44 ha
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Ajay River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 2.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 494
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 494
32.
Green Belt in Ha:
(a)Total Area of Green Belt 7.52
(b)Percentage of Total Project Area 2.11
(c)No. of Plants to be Planted 18800
(d)Funds Allocated for Plantation 4706000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt development, plantation, cleanness drive etc.
(2.)FinancialSteady income generation to employee and associated persons, revenue generation to state etc.
(3.)SocialDirect & Indirect employment generation, CSR & CER activities in near by villages
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 2.5 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. NIL
(b)Date of Approval 28 Jun 2011
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Coal
(e)Approved Mining Lease Area 213.27
(f)Approved Capacity 213.27
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 129.15
(b)Mineable Reserves (Million Ton) 68.37
(c)Extractable Reserves(Million Ton) 61.54
(d)Percent(%) of Extraction 47.65
(e)Grade of Coal /Ore /Mineral C to G
(f)Stripping Ratio 2.91 : 1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 8-13
(i)Mining Method Opencast
(j)Life of Mine (Years) 27
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.).1000
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 8
(c)Thickness of seams to be worked on 1
(d)Maximum Thickness of Seams (metres) 25.07
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 213.27
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 23 Feb 2018
(iii)Validity of LOI 2
(iv)Reference No. of LOI 143-CI/O/MIN/GEN-COL/03/2016
(c)Whether Lease Deed Executed ? No
(i)Reason thereof The lease deed will be executed after obtaining th
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof IT is fresh ML grant.
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 3
(ii)Total Area (in Hectare) 62.97
(iii)Height (in meter) 85
(iv)Quantity (in Million Cubic meter) 47.1
(v)No. of year back fill up 3
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 2
(ii)Total Area (in Hectare) 112.5
(iii)Height (in meter) 60
(iv)Quantity (in Million Cubic meter) 129.08
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 3.19
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 3.19
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 80.77
(b)Depth (in meter) 210
(c)Volume (in Million Cubic meter) 80
12.
Details of Quarry:
(a)Final Void of 80.77 (hectare) at a Depth of 210 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 213.27
13.
Details of Transportation:
(a)In Pit/Underground to Surface From mine face to CHP through haul road
(b)Surface to Siding/Loading From CHP, coal will be transported to various cons
(c)Transportation / Conveyor Details Coal as ROM from the opencast faces will be loaded
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND48.43048.43
(2.)FOREST LAND96.44013.019109.459
(3.)SURFACE WATER BODIES7.6407.80015.44
(4.)WASTE LAND000
(5.)SETTLEMENTS26.14034.72060.86
(6.)OTHERS(Specify)Fallow, Old quarry, proposed colonies34.6287.766122.386
(7.)GRAZING LAND000
TOTAL213.27143.305356.575
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)VIRGIN AREA23.850023.85
(2.)TOP SOIL STORAGE0000
(3.)INTERNAL OB DUMPS0000
(4.)EXTERNAL OB DUMPS11.090011.09
(5.)BUILT UP AREA (COLONY/OFFICE)10.2301727.23
(6.)EXCAVATION/QUARRY213.2700213.27
(7.)ROADS4048
(8.)GREEN BELT7.52007.52
TOTAL269.960210290.96
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 11.09
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 213.27
(d)Safety Zone(in hectare) 7.52
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 38.08
(h)Total afforestation plant (in hectare) 269.96
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)......
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. as per High Court of Delhi orders
(ii)Name of the EIA Consultant MIN MEC CONSULTANCY PVT LTD
(iii)Address A-121, PARYAVARAN COMPLEX, IGNOU ROAD, SAKET, NEW DELHI, 110030
(iv)Mobile No. 9811077603
(v)Landline No. 0112953223
(vi)Email Id minmec@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 31 Aug 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform about the proposal for diversion of 109.459 ha of forest land for consideration of the instant proposal for EC. 28 Mar 2019
2.NAThe correction have been made as per the instruction received 13 Jun 2019
3.NAEntry against column 23.3 of Form-2 shows that application for diversion of forest land of 109.459 ha is yet to be submitted. 11 Aug 2019
4.NAThe correction have been made as per the instruction received 24 Jul 2020
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

The EAC, after deliberations observed that instant proposal is for reconsideration in Environmental Clearance and observed the earlier compliance of points raised by EAC of revising the mine plan were taken up by PP but only on re-handling of dump and its related area located within the project area is addressed. PP has now been planned for rehandling and backfilling between 8th to 12th years of operation, concurrent to operation. There are three projected areas in the northern boundary of the Quarry A B and C. As per the revised plan PP will not dump the OB in projected area of quarry A and EAC had also mandatorily suggested PP, to leave both the projected area located in quarry A as well as C since they are located near to the densely populated habitation and increase the height of OB dump, to only use projected area of C. The area proposed in C block is to be reclaimed and plantation to be done.   The PP had yet to procure the area located outside the lease i.e. around 143.305 Ha. So EAC asked the PP to expedite it and submit the LOI of the state government. EAC also recommended mandatorily PP to obtain Forest Clearance of 109.459 Ha of the total forest area falling in the project boundary.

 

EAC asked PP to store the water as the ground water is shallow instead of going for very small size RWH system.  On enquiring about the mining method PP replied that it will be done by Shovel dumper with hydraulic excavators on which EAC recommended mandatorily to opt surface miner for excavation of coal as the densely populated area is located nearby and within the mine lease too. Further on enquiry, PP could not finalized the transportation route rather proposed  4 tentative routes so EAC had asked to firm up the evacuation plan with maximum  two options so the environment impact due to transportation could be minimized with optimum fleet size to nearest railway siding. PP was given opportunity during preparation of minutes; however the same was not provided.  It was also found that schedule –I species like Rock pythan, peacock etc. are present but PP had not prepared the conservation plan for them, So EAC asked PP to prepare the conservation plan and submit it for approval to the competent Authority.

 

Further, based on documents and facts submitted by PP, EAC further desired from PP to submit the following details

 

(i)            PP shall furnish the copy of Letter of Intent of State Government of the area other than the mine lease or allocated coal block to be acquired by PP

(ii)         PP shall provide the acknowledgment  and approval of Wildlife Conservation Plan for Schedule-I species and breakup of the proposed activities with budgetary provision submitted to the DFO

(iii)       PP shall provide the concurrence letter from Coal Controller Organization regarding revised Mine Plan and Mine closure plan as per observations of EAC during earlier and current meeting

(iv)        PP shall firm up maximum 2 route nearest to railway siding for linkage and based on traffic impact assessment, EMP measures shall be proposed after deciding and fixing the route of transportation from mine to railway siding.

(v)          PP shall provide the detailed plan of plantation on the area desired by EAC and peripheral plantation of 50 mts along the mine (quarry A and C).

 

In view of above, the proposal is deferred.

19 Apr 2022
2. ADS Reply LetterWe hereby submit our point wise response to the ADS sought on 21.01.2021. Please find uploaded Cover letter along with ADS reply with their Annexures. 11 Mar 2022
3.NA

The EAC after detailed deliberation was of the view that proposal needs proper responses and preparedness. No fleet size assessment has been made even emphasizing this point in the last meeting.  The Committee opined that the proposal is not in order as of now since there is scope of reduction of land degradation and safety of habitation in between the two quarries. The Committee expressed displeasure on quality of reply submitted by consultant named Min Mec Consultancy Pvt Ltd wherein the reply is not backed with specific action plan/activities. Further EAC desired that the pointwise compliance submitted by PP should be answered with specific activities and firmed plan. PP shall further submit the details on the following points.

 

(i)            PP shall review the Mine Plan and Mine Closure Plan to optimize external and internal dumping schedule, and avoid its proximity to any habitation (2nd external OB dump). The PP shall ensure faster reclamation of land disturbed by both mining and dumping on a concurrent basis as soon as the external and internal dumping operation of an area gets over. It was observed, even in the existing mine plan that reclamation of land can start much quicker than what has been envisaged to begin only at the end of the mine life. Reclamation must include regradation of land on a concurrent basis before plantation or any other land use such as rain harvesting etc.

(ii)         PP shall bring clarity on the area of coal block since it is 370 ha as per Mine Plan and as per PP, area of project is 356.57 ha. Also, forest land is 92.53 ha in approved Mine Plan however PP has applied for 109.459 ha.

(iii)       PP should submit budget provision/estimate for developing rain water harvesting structures in (i) mine area, (ii) buildings within the mine lease, (iii) Public buildings in Gourangdih B & nearby villages (buffer zone).

(iv)        PP should develop/adopt pond, lake & reservoir and submit the details of distribution of potable water supply in the villages and for agricultural purpose falling within the zone of influence and plan of distribution of water to the local people to the tune 560 KLD through PHED, Govt. of WB.  

(i)            PP should provide consequential impact of OB dump by reducing the fleet size after change in rearranging the areas and schedule

(ii)         Mechanism or Action proposed for controlling any cracks in building located in B Block since PP has accepted that there are chances of crack in building due to blasting in Public Hearing.

(iii)       Since, two mine quarries are at certain distance, PP shall clarify the technique adopted/method adopted for Air Quality Impact modelling.

(iv)        PP should submit year wise breakup and timeline with specific activity based Action Plan regarding the queries raised during the public hearing.

(v)          PP should submit the details the breakup of R&R budget and should submit the details of families having land only and families having land and house within the ML. 

(vi)        PP shall submit the detailed plan of action for numbers and location of air pollution monitoring stations, noise monitoring and vibration monitoring (based on blast vibration study) all along the A & C quarries towards B block for regular monitoring during mining operations.

(vii)      PP should present the scheme of plantation along the haul roads and toward block B to reduce air pollution with emphasis on local and native species and the species which are tolerant to pollution.

(viii)    PP should submit certification of PCCF about absence of Schedule-I species in the project and buffer area. Further certifying that no wildlife/National Sanctuary in 10 km project area.

 

The proposal was deferred on above lines for compliance by project proponent. 

21 Jan 2021
4. ADS Reply LetterWe hereby uploading our response to ADS for environmental clearance of proposed Gourangdih ABC Coal Mine (2.5 MTPA) of West Bengal Mineral Development & Trading Corporation Limited (WBMDTCL). Please find uploaded Cover letter along with ADS reply with their Annexures. 24 Dec 2020
5.NA

The EAC after deliberation was of the view that proposal is not in order from environment management point of view and deferred the proposal for want of further inputs/clarification on following points.   

        i.            PP shall submit the Stage-I FC for diversion of 109.459 ha of forest land for non-forestry purposes

      ii.            since area B is not intended to be mine and No OB dump and CHP should be located outside Mine Lease area, PP shall submit Revised Mine Plan including Mine Closure Plan

    iii.            Progressive reclamation mine closure plan/backfilling shall be prepared to reduce the requirement of land.

    iv.            Consequential impact of ground water in B -Block area to be carried due to mining activity out in A & C Blocks.

       v.            PP shall provide details of water harvesting for fulfilling the need area B since it comes under the zone influence of mining activity and primarily ground water is source of water for settlement on area B.

    vi.            Consequential impact of OB dump by reducing the fleet size shall be prepared after change in rearranging the areas.

  vii.            Proper response of public consultation with regard to pollution mitigation measures and demands of local people.

viii.            Details of control blasting with adequate safeguard for nearby people particularly locals residing in block B.

    ix.            Comprehensive Plan for supplying water to the nearby habitation in villages/settlements (zone of influence) as pointed out in the public hearing

       x.            Propose the measures to be taken for reduction of air pollution by transportation of OB dump.

    xi.            Project Proponent should submit approved R&R plan from District Collector

  xii.            Certification of PCCF about absence of Schedule-I species in the project and buffer area. Further certifying that no wildlife/National Sanctuary in 10 km project area.

xiii.            Details of ecological restoration as per Terms of reference shall be submitted.

 

The proposal was deferred on above lines for submission of compliance of observation

14 Oct 2020
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKRISHNENDU SADHUKHAN
DesignationMANAGING DIRECTOR
Name of Company (Applicant Name should not be given here)WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED
Address13, NELLIE SENGUPTA SARANI 2ND FLOOR, KOLKATA
Print