1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Gourandih ABC Coal Mine | (b)Name of the Company / Organisation | WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED | (c)Registered Address | 13, NELLIE SENGUPTA SARANI
2ND FLOOR, KOLKATA nlin,,Kolkata,West Bengal-700087 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | KRISHNENDU SADHUKHAN | (b)Designation (Owner/ Partner/ CEO) | MANAGING DIRECTOR | (c)Address | 13, NELLIE SENGUPTA SARANI
2ND FLOOR, KOLKATA,,,Kolkata,West Bengal-700087 | (d)Pin code | 700087 | (e)E-mail | wbmdtcltd@gmail.com | (f)STD Code. | 33(f)Telephone No. | 22522170 | (g)Fax No. | 22521653 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 1(a) Mining of minerals
| (b)Category | A | (c)Proposal Number | IA/WB/CMIN/65801/2017 | (d)Master Proposal Number(Single Window) | SW/96599/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | several plots as given in additional documents | (b)Pincode | 700087 | (c)Bounded Latitudes (North) | | From | | Degree | 23.80833 | Minutes | | Second | | From | | Degree | 23.82917 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 86.9625 | Minutes | | Second | | From | | Degree | 87.00417 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | Open series map no. F45C13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 174 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | Barddhaman | Barabani | | (2.) | West Bengal | Barddhaman | Barabani | Panuria and seven other villeges | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/80/2017-IA-II(M) | (b)Date of Apply of TOR | 28 Aug 2017 | (c)Date of Issue of TOR / Standard ToR | 29 Sep 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 20 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 8.5 |
| Agniveena Hall at the Office campus of Barabani Block Office | State : | West Bengal | District : | Paschim bardhaman | Tehsil : | Barabani | Village : | Barabani |
| 129 | Mainly related to probable air pollution, effect on GW table, effect of blasting etc. and mitigation measures. details are given in para 7.3 in Chapter 7 of EIA. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Opencast coal mining project | 213.27 Ha ML Area | Total Project area: 356.575 Ha | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal production | 2500000 | Tons per Annum | | Others | Road or Road cum rail | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 600 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 17.27 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 6.217 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6.35 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 16.92 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 16.92 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 16.92 | Others | Million liters per annum | Open market | Road | | 3 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 28 Feb 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 45.3 | 24.6 | 44.85 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 78 | 45 | 77.21 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 16.7 | 8.3 | 16.30 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 12.1 | 6.3 | 11.91 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | - | 6.92 | 6.56 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 257 | 44 | 200 | 600 | (3.) | Chlorides | | | mg/l | | 135 | 14 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 1.1 | 0.41 | 1 | 1.5 | (5.) | TSS | | | mg/l | | 30 | 4 | . | . | (6.) | TDS | | | mg/l | | 718 | 176 | 500 | 2000 | (7.) | Others | Alkalinity | | mg/l | | 420 | 84 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 69 | 10 | E | (2.) | Others | Total Coliform | Others | MPN/100 ml | 47 | 10 | A | (3.) | pH | | NA | | 8.2 | 6.9 | A | (4.) | BOD | | mg/l | | 30 | 5 | E | (5.) | DO | | mg/l | | 7.1 | 6.5 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.24 | 46.76 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.99 | 40.61 | 45 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.30 | 5.90 | (2.) | N(Nitrogen) | Others | mg/kg | 56.67 | 6.67 | (3.) | P(Phosphorus) | Others | mg/kg | 0.17 | 0.02 | (4.) | K(Potassium) | Kilogram per hectare | mg/kg | 370 | 53 | (5.) | Electric Conductivity | Others | mS/cm | 0.368 | 0.221 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.43 To 19.03 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.03 To 31.0 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | MDTC/PM-5/144(Env)/530 | (f)Date of Issue | 25 May 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 984 | 0 | Copy of Permission Letter | Pipeline | | Others | Mine sump | P2205010022320000001THE | 09 Dec 2019 | 10800 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Colonies | 365.6 | 400 | STP | Others | reused in colony | 365.6 | 0 | (2.) | Pit head | 27.2 | . | Septic tank | Others | soak pit | 0 | 27.2 | (3.) | workshop | 20 | 40 | OWS & Tank | Others | Recirculation | 20 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 412.8 | (b)Total Discharged Water (Kilolitre per Day) | 27.2 | (c)Total Reused Water (Kilolitre per Day) | 385.6 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Top soil | Construction & Demolition Waste | | 744000 | Tons | 0 | Others | Haul road | Others | Temporary storage & reuse | (2.) | Sludge septik tank | Municipal Solid Waste | | 2.5 | Tons | 0 | Others | Road | Others | composted to be used as manure | (3.) | STP sludge | Municipal Solid Waste | | 17.25 | Tons | 2 | Road | | Others | composted to be used as manure | (4.) | Municipal solid waste | Municipal Solid Waste | | 197.5 | Tons | 2 | Road | | Others | Segregated & sent to authorised vendor | (5.) | Oil & grease | Industrial Waste | | 0.528 | Tons | 0 | Others | Closed tank | Others | Sold to SPCB/ CPCB authorised vendors | (6.) | OB dump | Industrial Waste | | 17400000 | Tons | 0 | Others | Haul road | Others | Temporary dump& reuse in backfilling | (7.) | Settling pond sludge | Industrial Waste | | 852.85 | Tons | 0 | Road | | Others | Disposed in the OB dump area | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 45.3 | 1.5 | 11.458 | 56.758 | 60 | (2.) | NOx | | Microgram per Meter Cube | 16.7 | 1.5 | 31.49 | 48.2 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 78.0 | 1.5 | 19.916 | 97.92 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 12.1 | 1.5 | 26.125 | 38.23 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set (5230 KVA) | Diesel | 23 | 0.61 | Others | PM2.5 | 0.038521 | (2.) | DG set (5230 KVA) | Diesel | 23 | 0.61 | SO2 | | 1.284500 | (3.) | DG set (5230 KVA) | Diesel | 23 | 0.61 | NOx | | 3.382440 | (4.) | DG set (820 KVA) | Diesel | 13 | 0.25 | PM10 | | 0.013667 | (5.) | DG set (820 KVA) | Diesel | 13 | 0.25 | SO2 | | 0.211167 | (6.) | DG set (820 KVA) | Diesel | 13 | 0.25 | Others | PM2.5 | 0.007858 | (7.) | DG set (820 KVA) | Diesel | 13 | 0.25 | NOx | | 0.728889 | (8.) | DG set (5230 KVA) | Diesel | 23 | 0.61 | PM10 | | 0.066994 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 6050 | (b)Source | West Bengal State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 6050 | (e)Stack Height (in m) | 23 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 109.459 | (b)Private Land (ha.) | 166.017 | (c)Government Land (ha.) | 72.081 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 9.018 | Total Land (ha.) | 356.575 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 48.43 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 15.44 | (e)Settlements (ha.) | 60.86 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 109.459 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : fallow land (danga) land+old quarry+non agricultur | 122.386 | Total (ha.) | 356.5750 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 213.27 | | (2.) | OB Dump Area | | 76.7 | OB+Top soil | (3.) | Built Up Area | | 27.23 | | (4.) | Safety Zone | | 7.52 | Green belt | (5.) | Others | Undisturbed area and road | 31.85 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NIL | . | No critically polluted area within 10 km | (2.) | Wildlife Corridors | NIL | . | No Wildlife corridors within 10 km | (3.) | NPA | NIL | . | NA | (4.) | Corridors | NIL | . | NA | (5.) | ESZs | NIL | . | NA | (6.) | WLS | NIL | . | No WLS within 10 km | (7.) | ESAs | NIL | . | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NIL | . | NA | (2.) | Forest | | Forest within project arae | 0 | 109.459 ha is forest within project area | (3.) | Defence Installations | | NIL | . | No defence installation within 10 km | |
|
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | PENDING WITH-SG | (b)Legal Status of Forest Land | Protected | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 356.575 | (c)Status of Land acquisition if not acquired | Out of 356.575 Ha of Project Land, 109.459 Ha is F | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 7 | (b)No. of Households | 629 | (c)No. of PDFs (Project Displaced Families) | 629 | (d)No. of PAFs (Project Affected Families) | 1708 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 10595 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Sloth Bear & Rock Python | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 15.44 ha | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Ajay River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 2.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 494 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 494 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 7.52 | (b)Percentage of Total Project Area | 2.11 | (c)No. of Plants to be Planted | 18800 | (d)Funds Allocated for Plantation | 4706000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenbelt development, plantation, cleanness drive etc. | (2.) | Financial | Steady income generation to employee and associated persons, revenue generation to state etc. | (3.) | Social | Direct & Indirect employment generation, CSR & CER activities in near by villages | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 2.5 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | NIL | (b)Date of Approval | 28 Jun 2011 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | Coal | (e)Approved Mining Lease Area | 213.27 | (f)Approved Capacity | 213.27 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 129.15 | (b)Mineable Reserves (Million Ton) | 68.37 | (c)Extractable Reserves(Million Ton) | 61.54 | (d)Percent(%) of Extraction | 47.65 | (e)Grade of Coal /Ore /Mineral | C to G | (f)Stripping Ratio | 2.91 : 1 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 8-13 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 27 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 1 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | . | 1000 | | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 8 | (c)Thickness of seams to be worked on | 1 | (d)Maximum Thickness of Seams (metres) | 25.07 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 213.27 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 23 Feb 2018 | (iii)Validity of LOI | 2 | (iv)Reference No. of LOI | 143-CI/O/MIN/GEN-COL/03/2016 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | The lease deed will be executed after obtaining th | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | IT is fresh ML grant. | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 3 | (ii)Total Area (in Hectare) | 62.97 | (iii)Height (in meter) | 85 | (iv)Quantity (in Million Cubic meter) | 47.1 | (v)No. of year back fill up | 3 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 2 | (ii)Total Area (in Hectare) | 112.5 | (iii)Height (in meter) | 60 | (iv)Quantity (in Million Cubic meter) | 129.08 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 3.19 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 3.19 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 80.77 | (b)Depth (in meter) | 210 | (c)Volume (in Million Cubic meter) | 80 | |
|
12. | Details of Quarry: | (a)Final Void of 80.77 (hectare) at a Depth of 210 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 213.27 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | From mine face to CHP through haul road | (b)Surface to Siding/Loading | From CHP, coal will be transported to various cons | (c)Transportation / Conveyor Details | Coal as ROM from the opencast faces will be loaded | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 48.43 | 0 | 48.43 | (2.) | FOREST LAND | | 96.440 | 13.019 | 109.459 | (3.) | SURFACE WATER BODIES | | 7.640 | 7.800 | 15.44 | (4.) | WASTE LAND | | 0 | 0 | 0 | (5.) | SETTLEMENTS | | 26.140 | 34.720 | 60.86 | (6.) | OTHERS(Specify) | Fallow, Old quarry, proposed colonies | 34.62 | 87.766 | 122.386 | (7.) | GRAZING LAND | | 0 | 0 | 0 | |
TOTAL | 213.27 | 143.305 | 356.575 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | VIRGIN AREA | | 23.85 | 0 | 0 | | 23.85 | (2.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (3.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (4.) | EXTERNAL OB DUMPS | | 11.09 | 0 | 0 | | 11.09 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 10.23 | 0 | 17 | | 27.23 | (6.) | EXCAVATION/QUARRY | | 213.27 | 0 | 0 | | 213.27 | (7.) | ROADS | | 4 | 0 | 4 | | 8 | (8.) | GREEN BELT | | 7.52 | 0 | 0 | | 7.52 | |
TOTAL | 269.96 | 0 | 21 | 0 | 290.96 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 11.09 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 213.27 | (d)Safety Zone(in hectare) | 7.52 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 38.08 | (h)Total afforestation plant (in hectare) | 269.96 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | . | . | . | . | . | . | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | as per High Court of Delhi orders | (ii)Name of the EIA Consultant | MIN MEC CONSULTANCY PVT LTD | (iii)Address | A-121, PARYAVARAN COMPLEX, IGNOU ROAD, SAKET, NEW DELHI, 110030 | (iv)Mobile No. | 9811077603 | (v)Landline No. | 0112953223 | (vi)Email Id | minmec@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 31 Aug 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform about the proposal for diversion of 109.459 ha of forest land for consideration of the instant proposal for EC. | 28 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 13 Jun 2019 | 3. | NA | Entry against column 23.3 of Form-2 shows that application for diversion of forest land of 109.459 ha is yet to be submitted. | 11 Aug 2019 | 4. | NA | The correction have been made as per the instruction received | 24 Jul 2020 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | The EAC, after deliberations observed that instant proposal is for reconsideration in Environmental Clearance and observed the earlier compliance of points raised by EAC of revising the mine plan were taken up by PP but only on re-handling of dump and its related area located within the project area is addressed. PP has now been planned for rehandling and backfilling between 8th to 12th years of operation, concurrent to operation. There are three projected areas in the northern boundary of the Quarry A B and C. As per the revised plan PP will not dump the OB in projected area of quarry A and EAC had also mandatorily suggested PP, to leave both the projected area located in quarry A as well as C since they are located near to the densely populated habitation and increase the height of OB dump, to only use projected area of C. The area proposed in C block is to be reclaimed and plantation to be done. The PP had yet to procure the area located outside the lease i.e. around 143.305 Ha. So EAC asked the PP to expedite it and submit the LOI of the state government. EAC also recommended mandatorily PP to obtain Forest Clearance of 109.459 Ha of the total forest area falling in the project boundary.
EAC asked PP to store the water as the ground water is shallow instead of going for very small size RWH system. On enquiring about the mining method PP replied that it will be done by Shovel dumper with hydraulic excavators on which EAC recommended mandatorily to opt surface miner for excavation of coal as the densely populated area is located nearby and within the mine lease too. Further on enquiry, PP could not finalized the transportation route rather proposed 4 tentative routes so EAC had asked to firm up the evacuation plan with maximum two options so the environment impact due to transportation could be minimized with optimum fleet size to nearest railway siding. PP was given opportunity during preparation of minutes; however the same was not provided. It was also found that schedule –I species like Rock pythan, peacock etc. are present but PP had not prepared the conservation plan for them, So EAC asked PP to prepare the conservation plan and submit it for approval to the competent Authority.
Further, based on documents and facts submitted by PP, EAC further desired from PP to submit the following details
(i) PP shall furnish the copy of Letter of Intent of State Government of the area other than the mine lease or allocated coal block to be acquired by PP
(ii) PP shall provide the acknowledgment and approval of Wildlife Conservation Plan for Schedule-I species and breakup of the proposed activities with budgetary provision submitted to the DFO
(iii) PP shall provide the concurrence letter from Coal Controller Organization regarding revised Mine Plan and Mine closure plan as per observations of EAC during earlier and current meeting
(iv) PP shall firm up maximum 2 route nearest to railway siding for linkage and based on traffic impact assessment, EMP measures shall be proposed after deciding and fixing the route of transportation from mine to railway siding.
(v) PP shall provide the detailed plan of plantation on the area desired by EAC and peripheral plantation of 50 mts along the mine (quarry A and C).
In view of above, the proposal is deferred. | 19 Apr 2022 | 2. | ADS Reply Letter | We hereby submit our point wise response to the ADS sought on 21.01.2021. Please find uploaded Cover letter along with ADS reply with their Annexures. | 11 Mar 2022 | 3. | NA | The EAC after detailed deliberation was of the view that proposal needs proper responses and preparedness. No fleet size assessment has been made even emphasizing this point in the last meeting. The Committee opined that the proposal is not in order as of now since there is scope of reduction of land degradation and safety of habitation in between the two quarries. The Committee expressed displeasure on quality of reply submitted by consultant named Min Mec Consultancy Pvt Ltd wherein the reply is not backed with specific action plan/activities. Further EAC desired that the pointwise compliance submitted by PP should be answered with specific activities and firmed plan. PP shall further submit the details on the following points.
(i) PP shall review the Mine Plan and Mine Closure Plan to optimize external and internal dumping schedule, and avoid its proximity to any habitation (2nd external OB dump). The PP shall ensure faster reclamation of land disturbed by both mining and dumping on a concurrent basis as soon as the external and internal dumping operation of an area gets over. It was observed, even in the existing mine plan that reclamation of land can start much quicker than what has been envisaged to begin only at the end of the mine life. Reclamation must include regradation of land on a concurrent basis before plantation or any other land use such as rain harvesting etc.
(ii) PP shall bring clarity on the area of coal block since it is 370 ha as per Mine Plan and as per PP, area of project is 356.57 ha. Also, forest land is 92.53 ha in approved Mine Plan however PP has applied for 109.459 ha.
(iii) PP should submit budget provision/estimate for developing rain water harvesting structures in (i) mine area, (ii) buildings within the mine lease, (iii) Public buildings in Gourangdih B & nearby villages (buffer zone).
(iv) PP should develop/adopt pond, lake & reservoir and submit the details of distribution of potable water supply in the villages and for agricultural purpose falling within the zone of influence and plan of distribution of water to the local people to the tune 560 KLD through PHED, Govt. of WB.
(i) PP should provide consequential impact of OB dump by reducing the fleet size after change in rearranging the areas and schedule
(ii) Mechanism or Action proposed for controlling any cracks in building located in B Block since PP has accepted that there are chances of crack in building due to blasting in Public Hearing.
(iii) Since, two mine quarries are at certain distance, PP shall clarify the technique adopted/method adopted for Air Quality Impact modelling.
(iv) PP should submit year wise breakup and timeline with specific activity based Action Plan regarding the queries raised during the public hearing.
(v) PP should submit the details the breakup of R&R budget and should submit the details of families having land only and families having land and house within the ML.
(vi) PP shall submit the detailed plan of action for numbers and location of air pollution monitoring stations, noise monitoring and vibration monitoring (based on blast vibration study) all along the A & C quarries towards B block for regular monitoring during mining operations.
(vii) PP should present the scheme of plantation along the haul roads and toward block B to reduce air pollution with emphasis on local and native species and the species which are tolerant to pollution.
(viii) PP should submit certification of PCCF about absence of Schedule-I species in the project and buffer area. Further certifying that no wildlife/National Sanctuary in 10 km project area.
The proposal was deferred on above lines for compliance by project proponent. | 21 Jan 2021 | 4. | ADS Reply Letter | We hereby uploading our response to ADS for environmental clearance of proposed Gourangdih ABC Coal Mine (2.5 MTPA) of West Bengal Mineral Development & Trading Corporation Limited (WBMDTCL). Please find uploaded Cover letter along with ADS reply with their Annexures. | 24 Dec 2020 | 5. | NA | The EAC after deliberation was of the view that proposal is not in order from environment management point of view and deferred the proposal for want of further inputs/clarification on following points.
i. PP shall submit the Stage-I FC for diversion of 109.459 ha of forest land for non-forestry purposes
ii. since area B is not intended to be mine and No OB dump and CHP should be located outside Mine Lease area, PP shall submit Revised Mine Plan including Mine Closure Plan
iii. Progressive reclamation mine closure plan/backfilling shall be prepared to reduce the requirement of land.
iv. Consequential impact of ground water in B -Block area to be carried due to mining activity out in A & C Blocks.
v. PP shall provide details of water harvesting for fulfilling the need area B since it comes under the zone influence of mining activity and primarily ground water is source of water for settlement on area B.
vi. Consequential impact of OB dump by reducing the fleet size shall be prepared after change in rearranging the areas.
vii. Proper response of public consultation with regard to pollution mitigation measures and demands of local people.
viii. Details of control blasting with adequate safeguard for nearby people particularly locals residing in block B.
ix. Comprehensive Plan for supplying water to the nearby habitation in villages/settlements (zone of influence) as pointed out in the public hearing
x. Propose the measures to be taken for reduction of air pollution by transportation of OB dump.
xi. Project Proponent should submit approved R&R plan from District Collector
xii. Certification of PCCF about absence of Schedule-I species in the project and buffer area. Further certifying that no wildlife/National Sanctuary in 10 km project area.
xiii. Details of ecological restoration as per Terms of reference shall be submitted.
The proposal was deferred on above lines for submission of compliance of observation | 14 Oct 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | KRISHNENDU SADHUKHAN | Designation | MANAGING DIRECTOR | Name of Company (Applicant Name should not be given here) | WEST BENGAL MINERAL DEVELOPMENT AND TRADING CORPORATION LIMITED | Address | 13, NELLIE SENGUPTA SARANI
2ND FLOOR, KOLKATA |
|