1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EIA / RA STUDY FOR INSTALLATION OF PETROLEUM STORAGE TANKS FOR STORAGE CAPACITY AUGMENTATION AT IOCL PETROLEUM TERMINAL, VILLAGE KAMMOMAJRA KHURD, JIND ROAD SANGRUR, PUNJAB
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LTD PUNJAB
(c)Registered Address Marketing Division, Punjab State Office, Block 3A,,Sector 19 A, Madhya marg, Chandigarh,Chandigarh,Chandigarh-400051
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shalabh Singla Singla
(b)Designation (Owner/ Partner/ CEO) Manager Operations (Punjab State)
(c)Address Marketing Division, Punjab State Office, Block 3A,,Sector 19 A, Madhya Marg, Chandigarh,Chandigarh,Chandigarh,Chandigarh-400051
(d)Pin code 400051
(e)E-mail safety@anacon.in
(f)STD Code. 1722(f)Telephone No. 541814
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity
(b)Category A
(c)Proposal Number IA/PB/IND2/96344/2016
(d)Master Proposal Number(Single Window) SW/96342/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 1-25
(b)Pincode 148001
(c)Bounded Latitudes (North)
From
Degree 30.13
Minutes
Second
From
Degree 30.20
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.51
Minutes
Second
From
Degree 75.90
Minutes
Second
(e)Survey of India Topo Sheet No. H43J15/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 251
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 12
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Punjab
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SIA/PB/IND2/11391/2016
(b)Date of Apply of TOR 03 May 2016
(c)Date of Issue of TOR / Standard ToR 23 Nov 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
Plant Site
State :Punjab
District :Sangrur
Tehsil :Sangrur
Village :KAMMOMAJRA KHURD
81Issues related to employment & CSROthersAdditional District Comissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Isolated Storage117210Increase from 82,515 KL to 199725 KL
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)HSD4010OthersKLPipe Conveyor
(2.)Ethanol1200OthersKLPipe Conveyor
(3.)HSD100000OthersKLPipe Conveyor
(4.)HSD12000OthersKLPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 05 Dec 2013
(iv)Valid Upto 31 Mar 2018
(v)File No. R13SGRCTOW595930 5611
(vi)Application No. 595930
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 108
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.81
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.03
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? Yes
8.(a) If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 199725
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 199725
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Petroleum Products-SKO, HSD, MS, SLOPE etc198255OthersKLRefineryPipe ConveyorCross Country Pipeline0 CaptiveCopy of Linkage
(2.)Ethanol1470OthersKLOpen MarketRoad0 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2016 To 31 Jan 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube20.16.015.180
(2.)PM10Micro Gram per Meter Cube6735.162.6100
(3.)SO2Micro Gram per Meter Cube11.85.38.580
(4.)OthersCOMicro Gram per Meter Cube0.1580.0710.1312000
(5.)PM2.5Micro Gram per Meter Cube25.711.723.760
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.657.156.58.5
(2.)TSSmg/l101000
(3.)Chloridesmg/l21.9217.952501000
(4.)Fluoridemg/l0.220.121.01.5
(5.)Heavy MetalsAsmg/l0.010.010.010.05
(6.)OthersTotal Alkalinitymg/l86.4870.4200600
(7.)TDSmg/l1461295002000
(8.)Total Hardnessmg/l103.482200600
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l6.35.9B
(2.)BODmg/l22C
(3.)OthersTotal ColiformOthersMPN/100 ml240175B
(4.)pHNA7.457.41A
(5.)CODmg/l44C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))58.348.555
(2.)Leq(Night)A-weighted decibels(dB(A))40.528.645
    14.5.     No. of Soil Sample Monitored locations : 3
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram160.25157.20
(2.)P(Phosphorus)Kilogram per hectare45.7642.27
(3.)N(Nitrogen)Kilogram per hectare121.73110.75
(4.)pH6.976.72
(5.)Electric ConductivityOthersMicroS/cm200.74157.25
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.25 To 29.60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.80 To 30.15
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater13.50 Not Appliacble modeOthersNATube WellNA01 Feb 201913.5
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial3.65Septic tankOthersSoak Pit03.6
(2.)Industrial9.210OWSGreen Belt Renewal Plant9.2
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 12.8
(b)Total Discharged Water (Kilolitre per Day) 3.6
(c)Total Reused Water (Kilolitre per Day) 9.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dry GarbageMunicipal Solid Waste14.6Tons1RoadAuthorized Recyclers
(2.)Used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre1RoadAuthorized Recyclers
(3.)Wet GarbageOthersGarden Waste5.47Tons0OthersNAOthersComposting
(4.)Oil SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Kilolitre1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube20.11.46.526.6180
(2.)PM10Microgram per Meter Cube671.40.3267.321100
(3.)PM2.5Microgram per Meter Cube0001na
(4.)SO2Microgram per Meter Cube11.801.40.01211.812180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Set 2x750 KVAHSD90.15PM100.033
(2.)DG SetHSD90.15SO20.0013
(3.)DG SetHSD90.15NOx0.66
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1915
(b)Source Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 750 KVA
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 42.01
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 42.01
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 40.01
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 40.01
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant33.91
(2.)Green belt6.1
Total (ha.) 40.01
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA15None within Study area
(2.)Wildlife CorridorsNA15None within Study area
(3.)ESAsNA15None within Study area
(4.)WLSBir Ashwin0.520No impact on WLS as only storage activities taken place
(5.)Critically Polluted AreaNA15None within Study area
(6.)NPANA15None within Study area
(7.)ESZsNA15None within Study area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA15None within study area
(2.)Archaeological SitesNA15None within study area
(3.)Defence InstallationsNA15None within study area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peacock
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 200000
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 40
(e)No. of working days 365
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 6.1
(b)Percentage of Total Project Area 14.52
(c)No. of Plants to be Planted 500
(d)Funds Allocated for Plantation 60000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThere will be employment opportunity for local people during construction and operation phase.
(2.)FinancialThe project will improve supply position of the High Speed Diesel (HSD), Motor Spirit (MS),Superior Kerosene Oil (SKO) and Ethanol in a state
(3.)EnvironmentalPlant will be set up on barren land; hence minimum environmental impacts
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0059(Rev.01)
(ii)Name of the EIA Consultant M/s. Anacon Laboratories Pvt. Ltd.
(iii)Address 60, Bajiprabhu Nagar, Nagpurq
(iv)Mobile No. 9372960077
(v)Landline No. 0712224200
(vi)Email Id ngp@anacon.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 01 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - EC for the existing POL storage capacity of 82515 kl, and the compliance status thereof. - Details against columns 8.1 & 8.2 of Form-2 needs to be corrected, clearly reflecting the existing and the proposed facilities. - Consent status for the existing storage facilities, and the details to be mentioned against column 9.1 of Form-2. The proposal needs to be discussed with us in the Ministry for consideration. 23 Feb 2019
2.NAThe correction have been made as per the instruction received 04 Mar 2019
3.NAPlease reply to our observations dated 23/2/2019 for further consideration of the proposal. 23 Mar 2019
4.NAThe correction have been made as per the instruction received 22 Jun 2019
5.NAThe requirement of prior EC for the project may be examined vis-a-vis the Ministry's Notification dated 13/6/2019. 02 Jul 2019
6.NAThe correction have been made as per the instruction received 16 Aug 2019
7.NAThe correction have been made as per the instruction received 16 Aug 2019
8.NAPlease see our observations dated 2/7/2019 for the needful. 27 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShalabh Singla Singla
DesignationManager Operations (Punjab State)
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LTD PUNJAB
AddressMarketing Division, Punjab State Office, Block 3A,
Print