1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | EIA / RA STUDY FOR INSTALLATION OF PETROLEUM STORAGE TANKS FOR STORAGE CAPACITY AUGMENTATION AT IOCL PETROLEUM TERMINAL, VILLAGE KAMMOMAJRA KHURD, JIND ROAD SANGRUR, PUNJAB | (b)Name of the Company / Organisation | INDIAN OIL CORPORATION LTD PUNJAB | (c)Registered Address | Marketing Division, Punjab State Office, Block 3A,,Sector 19 A, Madhya marg, Chandigarh,Chandigarh,Chandigarh-400051 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shalabh Singla Singla | (b)Designation (Owner/ Partner/ CEO) | Manager Operations (Punjab State) | (c)Address | Marketing Division, Punjab State Office, Block 3A,,Sector 19 A, Madhya Marg, Chandigarh,Chandigarh,Chandigarh,Chandigarh-400051 | (d)Pin code | 400051 | (e)E-mail | safety@anacon.in | (f)STD Code. | 1722(f)Telephone No. | 541814 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/PB/IND2/96344/2016 | (d)Master Proposal Number(Single Window) | SW/96342/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 1-25 | (b)Pincode | 148001 | (c)Bounded Latitudes (North) | | From | | Degree | 30.13 | Minutes | | Second | | From | | Degree | 30.20 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 75.51 | Minutes | | Second | | From | | Degree | 75.90 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43J15/16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 251 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 12 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Punjab | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | SIA/PB/IND2/11391/2016 | (b)Date of Apply of TOR | 03 May 2016 | (c)Date of Issue of TOR / Standard ToR | 23 Nov 2016 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 22 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Plant Site | State : | Punjab | District : | Sangrur | Tehsil : | Sangrur | Village : | KAMMOMAJRA KHURD |
| 81 | Issues related to employment & CSR | Others | Additional District Comissioner | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Isolated Storage | 117210 | Increase from 82,515 KL to 199725 KL | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | HSD | 4010 | Others | KL | Pipe Conveyor | | (2.) | Ethanol | 1200 | Others | KL | Pipe Conveyor | | (3.) | HSD | 100000 | Others | KL | Pipe Conveyor | | (4.) | HSD | 12000 | Others | KL | Pipe Conveyor | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Dec 2013 | (iv)Valid Upto | 31 Mar 2018 | (v)File No. | R13SGRCTOW595930 5611 | (vi)Application No. | 595930 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 108 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.40 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.81 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.03 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | c)Notified Eco-sensitive areas | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | Yes | 8.(a) | If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 199725 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 199725 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Petroleum Products-SKO, HSD, MS, SLOPE etc | 198255 | Others | KL | Refinery | Pipe Conveyor | Cross Country Pipeline | 0 | Captive | | Copy of Linkage | (2.) | Ethanol | 1470 | Others | KL | Open Market | Road | | 0 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Nov 2016 To 31 Jan 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 20.1 | 6.0 | 15.1 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 67 | 35.1 | 62.6 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 11.8 | 5.3 | 8.5 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 0.158 | 0.071 | 0.131 | 2000 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 25.7 | 11.7 | 23.7 | 60 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.65 | 7.15 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 10 | 10 | 0 | 0 | (3.) | Chlorides | | | mg/l | | 21.92 | 17.95 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.22 | 0.12 | 1.0 | 1.5 | (5.) | Heavy Metals | | As | mg/l | | 0.01 | 0.01 | 0.01 | 0.05 | (6.) | Others | Total Alkalinity | | mg/l | | 86.48 | 70.4 | 200 | 600 | (7.) | TDS | | | mg/l | | 146 | 129 | 500 | 2000 | (8.) | Total Hardness | | | mg/l | | 103.4 | 82 | 200 | 600 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.3 | 5.9 | B | (2.) | BOD | | mg/l | | 2 | 2 | C | (3.) | Others | Total Coliform | Others | MPN/100 ml | 240 | 175 | B | (4.) | pH | | NA | | 7.45 | 7.41 | A | (5.) | COD | | mg/l | | 4 | 4 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.3 | 48.5 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 40.5 | 28.6 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 160.25 | 157.20 | (2.) | P(Phosphorus) | Kilogram per hectare | | 45.76 | 42.27 | (3.) | N(Nitrogen) | Kilogram per hectare | | 121.73 | 110.75 | (4.) | pH | | | 6.97 | 6.72 | (5.) | Electric Conductivity | Others | MicroS/cm | 200.74 | 157.25 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12.25 To 29.60 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 13.80 To 30.15 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 13.5 | 0 | Not Appliacble | modeOthers | NA | Tube Well | | NA | 01 Feb 2019 | 13.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 3.6 | 5 | Septic tank | Others | Soak Pit | 0 | 3.6 | (2.) | Industrial | 9.2 | 10 | OWS | Green Belt Renewal Plant | | 9.2 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 12.8 | (b)Total Discharged Water (Kilolitre per Day) | 3.6 | (c)Total Reused Water (Kilolitre per Day) | 9.2 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dry Garbage | Municipal Solid Waste | | 14.6 | Tons | 1 | Road | | Authorized Recyclers | | (2.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Kilolitre | 1 | Road | | Authorized Recyclers | | (3.) | Wet Garbage | Others | Garden Waste | 5.47 | Tons | 0 | Others | NA | Others | Composting | (4.) | Oil Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Kilolitre | 1 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 20.1 | 1.4 | 6.5 | 26.61 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 67 | 1.4 | 0.32 | 67.321 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | na | (4.) | SO2 | | Microgram per Meter Cube | 11.80 | 1.4 | 0.012 | 11.8121 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set 2x750 KVA | HSD | 9 | 0.15 | PM10 | | 0.033 | (2.) | DG Set | HSD | 9 | 0.15 | SO2 | | 0.0013 | (3.) | DG Set | HSD | 9 | 0.15 | NOx | | 0.66 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1915 | (b)Source | Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2 x 750 KVA | (e)Stack Height (in m) | 9 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 42.01 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 42.01 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 40.01 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 40.01 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 33.91 | | (2.) | Green belt | | 6.1 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 15 | None within Study area | (2.) | Wildlife Corridors | NA | 15 | None within Study area | (3.) | ESAs | NA | 15 | None within Study area | (4.) | WLS | Bir Ashwin | 0.520 | No impact on WLS as only storage activities taken place | (5.) | Critically Polluted Area | NA | 15 | None within Study area | (6.) | NPA | NA | 15 | None within Study area | (7.) | ESZs | NA | 15 | None within Study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 15 | None within study area | (2.) | Archaeological Sites | | NA | 15 | None within study area | (3.) | Defence Installations | | NA | 15 | None within study area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 200000 | (iii)Period of Implementation | 5 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 30 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 40 | (e)No. of working days | 365 | (f)Total Manpower | 100 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 6.1 | (b)Percentage of Total Project Area | 14.52 | (c)No. of Plants to be Planted | 500 | (d)Funds Allocated for Plantation | 60000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | There will be employment opportunity for local people during construction and operation phase. | (2.) | Financial | The project will improve supply position of the High Speed Diesel (HSD), Motor Spirit (MS),Superior Kerosene Oil (SKO) and Ethanol in a state | (3.) | Environmental | Plant will be set up on barren land; hence minimum environmental impacts | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0059(Rev.01) | (ii)Name of the EIA Consultant | M/s. Anacon Laboratories Pvt. Ltd. | (iii)Address | 60, Bajiprabhu Nagar, Nagpurq | (iv)Mobile No. | 9372960077 | (v)Landline No. | 0712224200 | (vi)Email Id | ngp@anacon.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 01 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- EC for the existing POL storage capacity of 82515 kl, and the compliance status thereof.
- Details against columns 8.1 & 8.2 of Form-2 needs to be corrected, clearly reflecting the existing and the proposed facilities.
- Consent status for the existing storage facilities, and the details to be mentioned against column 9.1 of Form-2.
The proposal needs to be discussed with us in the Ministry for consideration. | 23 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 04 Mar 2019 | 3. | NA | Please reply to our observations dated 23/2/2019 for further consideration of the proposal. | 23 Mar 2019 | 4. | NA | The correction have been made as per the instruction received | 22 Jun 2019 | 5. | NA | The requirement of prior EC for the project may be examined vis-a-vis the Ministry's Notification dated 13/6/2019. | 02 Jul 2019 | 6. | NA | The correction have been made as per the instruction received | 16 Aug 2019 | 7. | NA | The correction have been made as per the instruction received | 16 Aug 2019 | 8. | NA | Please see our observations dated 2/7/2019 for the needful. | 27 Aug 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shalabh Singla Singla | Designation | Manager Operations (Punjab State) | Name of Company (Applicant Name should not be given here) | INDIAN OIL CORPORATION LTD PUNJAB | Address | Marketing Division, Punjab State Office, Block 3A, |
|