EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TN/MIS/27376/2015    ii. MoEFCC File No. : 21-75/2015-IA-III    iii.Short narrative of the project: Construction of Shopping mall, Hotel & Hotel Apartment - "The Marina" (Expansion)    iv. Project Sector : INFRA-2    v. Company/Proponent : ALLIED MAJESTIC PROMOTERS AND OMR MALL DEVELOPERS PVT. LTD.
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Tamil NaduKanchipuramTambaram
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted N/A ix.Date of Submission for EC: 10 Apr 2015 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 09 Feb 2015   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: This is a construction project. There is no public hearing and risk assessment. Form 1, 1A, Conceptual plan, EMP has been attached. This is an expansion project, the EC copy, Water balance, STP, Site
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe project was listed in 150th meeting of Expert Appraisal Committee for Projects related to Infrastructure Development, Coastal Regulation Zone, Building/Construction and Miscellaneous projects held on 29th – 31st July, 2015 The EAC noted the submissions made by the PP and observed that proposal is for construction of mixed development of mall, hotel, multiplex and serviced apartments. It is informed that the designated land use is commercial. The PP was asked to produce the relevant provisions in the local development control rules which would permit the mixed development as recorded in Form-1. The PP would be required to make the Form-1 in conformity with the local development control rules. Further, the PP could not clarify if the serviced apartments are to be treated as hotel or residence. The EAC decided to defer the proposal. 17 Sep 2015
2. ADS LetterPlease find the Covering letter attached with additional details. The revised Form 1, Form 1A, Conceptual plans and DTCP approval copy for residential apartments are enclosed for your verification. 13 Dec 2015
3.NAThe project was reconsidered in 3rd meeting of infra 2 and after detailed deliberation, the Committee sought following addl. Information : a) Monitoring report from the Regional Office, Chennai for the current status of compliance of the existing EC’s conditions to be submitted. b) A report on mandatory compliance measures taken for proposed buildings as recommended in the Energy conservation building code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India. c) Solar power to be included. d) Details of rain water harvesting system to be incorporated. e) Details of car parking norms to be followed. f) Source of water supply. g) Details of DG sets and its stack height as well as acoustic enclosure. The proposal was deferred till the desired information is submitted. 17 Mar 2016
4. ADS LetterThe additional details with covering letter is enclosed. Annexes on the following are uploaded, Post EC compliance,Compliance ECBC,Details of solar power,energy saving,HVAC energy saving,rain water harvesting,parking details,water allotment letter,DG details. 17 Mar 2016
5.NAThe project was considered in 5th meeting of EAC. Minutes of the Meeting is available on the webportal(environmentclearance.nic.in). As per the recommendation of EAC, further action will be taken on the project after submission of revised form-1 through online web portal 13 May 2016
6. ADS LetterThe revised Form 1,1A,conceptual plan with required annexures is enclosed in the additional details. 18 May 2016
7. ADS LetterPlease clarify the information as per letter dt. 30.11.2016 copy enclosed 02 Jan 2017
8. ADS LetterNA 02 Jan 2017
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 77    iii. Name of Consultant: Hubert Enviro Care Systems (P) LTD   iv. Address : #18,92nd Street, Ashok Nagar, Chennai - 600 083   v. Mobile No.: 9884390811   vi. Landline No.: 4442985555   vii. Email Id: moses@hecs.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Mr. A. Abdul    ii. Designation : Director    iii. Name of Company(Applicant Name should not be given here) : ALLIED MAJESTIC PROMOTERS AND OMR MALL DEVELOPERS PVT. LTD.    iv. Address : 5th Floor, CITI Tower, #117, Thiyagaraya Road T.Nagar, Chennai v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL