Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Shree Pramukh Chemicals
(b)Name of the Company / Organisation SHREE PRAMUKH CHEMICALS
(c)Registered Address Plot No. 3119, GIDC Industria Estate - Panoli, Dist: Bharuch,,Bharuch,Gujarat-394116
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jignesh M Nayani
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address Plot No. 3119, GIDC Industrial Estate - Panoli, DistBharuch,,Anklesvar,Bharuch,Gujarat-394116
(d)Pin code 394116
(e)E-mail jignesh.nayani777@gmail.com
(f)STD Code. 2646(f)Telephone No. 244806
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/GJ/IND2/96135/2018
(d)Master Proposal Number(Single Window) SW/96128/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot. No. 3119, GIDC Industrial Estate, Panoli - 3
(b)Pincode 394116
(c)Bounded Latitudes (North)
From
Degree 213339.36
Minutes
Second
From
Degree 213340.34
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 725932.80
Minutes
Second
From
Degree 725933.06
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 22
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 65.0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/249/2018-IA-II(I)
(b)Date of Apply of TOR 01 Sep 2018
(c)Date of Issue of TOR / Standard ToR 06 Oct 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Located In Panoli Industrial Estate, GIDC
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)METHANOL5 MTDrum Storage
(2.)TANK-H2SO45 MTDrum Storage
(3.)acetone5 MTDrum Storage
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ACETONE60Tons per AnnumRoad
(2.)METHANOL60Tons per AnnumRoad
(3.)METHANOL60Tons per AnnumRoad
(4.)METHANOL60Tons per AnnumRoad
(5.)ACETONE60Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.40
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.08
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.19
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 5
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 5
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Acetone60Tons per Annumopen marketRoad1.5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube57.5143.985760
(2.)NOxMicro Gram per Meter Cube28.5319.032880
(3.)PM10Micro Gram per Meter Cube95.9475.3695100
(4.)SO2Micro Gram per Meter Cube26.7216.872680
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l682100100
(2.)TDSmg/l347857620002000
(3.)Total Hardnessmg/l909.2178.7400400
(4.)Fluoridemg/l0.00.01.51.5
(5.)pHOthers8.58.56.58.58.5
(6.)Chloridesmg/l768.7157.410001000
(7.)Heavy MetalsTOTAL IRONmg/l22.080.140.31.0
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.460.0B
(2.)BODmg/l0.00.0D
(3.)CODmg/l25.130.0A
(4.)pHmg/l7.690.0A
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))554955
(2.)Leq(Night)A-weighted decibels(dB(A))454245
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pHOthers6.5 TO 8.58.167.12
(2.)K(Potassium)Milligram per Kilogram1082260
(3.)P(Phosphorus)Milligram per Kilogram21918
(4.)Electric ConductivityMillisiemens per Centimetre1.20.5
(5.)N(Nitrogen)Milligram per Kilogram245.294.8
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 100 To 200
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply271.5Copy of Permission LettermodeOthersTankerOthersGIDC water SupplyGIDC/Panoli/00108 Aug 201827
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)ETP2020primary treatment & send to Common MEEOthersCommon MEE of M/s. ACPTCPL, Ankleshwar0.020
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20
(b)Total Discharged Water (Kilolitre per Day) 20
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent SolventHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1030Tons2.5RoadAuthorized Recyclers
(2.)dil. HCLHazardous Waste (as per Hazardous and Other Waste Management rules 2016)180Tons2.0RoadAuthorized Recyclers
(3.)used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.0012Tons1.5RoadAuthorized Recyclers
(4.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)42Tons2.5RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)Discarded DrumHazardous Waste (as per Hazardous and Other Waste Management rules 2016)24Tons1.5RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube95.942.20.1259197100
(2.)PM2.5Microgram per Meter Cube57.512.20.125915860
(3.)SO2Microgram per Meter Cube26.722.20.220952780
(4.)NOxMicrogram per Meter Cube28.532.20.078592980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam BoilerNatural Gas180.5PM100.12591
(2.)thermic fluid heaternatural gas180.5SO20.133
(3.)D. G SetDiesel9.00.1NOx0.083
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 KVA
(e)Stack Height (in m) 9.0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.147975
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 00
    Total Land (ha.) 0.147975
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.66
(b)Waste/Barren Land (ha.) 0.040
(c)Grazing/ Community Land (ha.) 0.008
(d)Surface Water Bodies (ha.) 0.012
(e)Settlements (ha.) 0.03
(f)Industrial (ha.) 0.00
(g)Forest (ha.) 0.085
(h)Mangroves (ha.) 0.048
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : marshy land 0.06
    Total (ha.) 0.9430000000000001
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.015
Total (ha.) 0.015
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA0.00.00.0
(2.)ESZs10.00.0
(3.)WLS--0.00.0
(4.)Critically Polluted Area--0.000
(5.)ESAs0.00.00.0
(6.)Corridors--0.00.0
(7.)Wildlife Corridors--0.00.0
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Othersno0.00.00.0
(2.)Archaeological Sites0.00.00.0
(3.)Forest--0.00.0
(4.)Defence Installations0.0000.0
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0.0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.0147975
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired Land is already acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0.0
(b)No. of Households 0.0
(c)No. of PDFs (Project Displaced Families) 0.0
(d)No. of PAFs (Project Affected Families) 0.0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0.0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 5
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 10
(e)No. of working days 25
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.048831
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 150
(d)Funds Allocated for Plantation 250000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. High court stay order
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Center point, civil Char rasta, nr. Kadiwala school, ring roag, surat
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 05 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify as to how the unit would be covered under category A vis-a-vis the schedule to the EIA Notification, 2006 for its appraisal at central level. 16 Feb 2019
2.NAThe correction have been made as per the instruction received 18 Feb 2019
3.NAPlease submit the proposal to the SEAC/SEIAA in Gujarat. 24 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJignesh M Nayani
DesignationPartner
Name of Company (Applicant Name should not be given here)SHREE PRAMUKH CHEMICALS
AddressPlot No. 3119, GIDC Industria Estate - Panoli, Dist: Bharuch
Print