Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Setting up of Tecnical Grade Pesticide Unit by M/s Central Insecticide and Fertilizers
(b)Name of the Company / Organisation CENTRAL INSECTICIDE AND FERTILIZERS
(c)Registered Address S-221,Unnati Tower,Central Spine,Sector-6 ,Vidyadhar Nagar,jaipur,,Jaipur,Rajasthan-302023
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kaleem Choudhary
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address S-221,Unnati Tower,Central Spine,Sector-6,Vidyadhar Nagar,,Jaipur,Jaipur,Rajasthan-302023
(d)Pin code 302023
(e)E-mail cif0172@gmail.com
(f)STD Code. 141(f)Telephone No. 4013996
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/95983/2015
(d)Master Proposal Number(Single Window) SW/95977/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.- E-23A SKS Industrial area Reengus Sikar
(b)Pincode 302023
(c)Bounded Latitudes (North)
From
Degree 27.334114
Minutes
Second
From
Degree 27.334114970
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.583833
Minutes
Second
From
Degree 75.583889
Minutes
Second
(e)Survey of India Topo Sheet No. 45-M/8 45-M/11 45-M/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 475
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/08/2016-IA-II(I)
(b)Date of Apply of TOR 18 Dec 2015
(c)Date of Issue of TOR / Standard ToR 05 Apr 2016
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :21 Jul 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Aug 2017
Distance of Public Hearing Venue from the Proposed Project :5
Nagar Palika Reengus, Sikar
State :Rajasthan
District :Sikar
Tehsil :Sikar
Village :Sikar, Rajasthan
45Employment, CSR,District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)PLANT AREA1960.4SQM
(2.)ROADS/ CORRIDORS301.6sqm
(3.)PLANTATION1244.1SQM
(4.)OPEN AREA263.9SQM
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ZIRAM100Tons per AnnumRoad
(2.)THIRAM400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 04 Jan 2011
(iv)Valid Upto 29 Jan 2013
(v)File No. NONE
(vi)Application No. NOT APPLICABLE
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.54
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.06
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.06
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1309
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1309
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dimethyl Amine400Tons per AnnumIMPORTRoad100 MoUCopy of Linkage
(2.)Carbon disulphide280Tons per AnnumIMPORTRoad200 MoUCopy of Linkage
(3.)Hydrogen Peroxide60Tons per AnnumIMPORTRoad200 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Mar 2016 To 15 Jun 2016
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube17.89.617.580
(2.)PM2.5Micro Gram per Meter Cube30153060
(3.)SO2Micro Gram per Meter Cube95980
(4.)PM10Micro Gram per Meter Cube803879100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.927.666.58.5
(2.)TDSmg/l7862245002000
(3.)Total Hardnessmg/l496136200600
(4.)Heavy Metalsleadmg/l0.0010.0010.010.01
(5.)TSSmg/l4.20.20000
(6.)Chloridesmg/l9224.82501000
(7.)Fluoridemg/l0.750.3611.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00E
(2.)CODmg/l00E
(3.)pHNA00E
(4.)BODmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))634975
(2.)Leq(Night)A-weighted decibels(dB(A))544165
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare272.4245.6
(2.)pH8.127.68
(3.)P(Phosphorus)Kilogram per hectare20.516.6
(4.)Electric ConductivityMillisiemens per Centimetre135107
(5.)K(Potassium)Kilogram per hectare144.9130
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 60
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 70
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersRIICO62Copy of Permission LettermodeOtherstankerOtherstankerissued letter06 Jul 20166
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial Operation3.53.5ETPReuse within the Plant & Recycling3.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)process wasteIndustrial Waste100Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)ETP SludgeIndustrial Waste50Tons100RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube91.5009.00180
(2.)PM10Microgram per Meter Cube801.50.004780.047100
(3.)NOxMicrogram per Meter Cube17.81.50017.8180
(4.)PM2.5Microgram per Meter Cube331.50.004733.0460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Process stackHSD100.2PM106.0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 300
(b)Source Rajasthan Electricity board
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 300
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0.377
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.377
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22271
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 1
(e)Settlements (ha.) 1100
(f)Industrial (ha.) 00
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : open scrub 5332
    Total (ha.) 28704
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.377SQM
Total (ha.) 0.377
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnone00none
(2.)NPAnone00none
(3.)Wildlife Corridorsnone00none
(4.)Critically Polluted Areanone00none
(5.)ESAsnone00none
(6.)ESZsnone00none
(7.)Corridorsnone00none
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnone00none
(2.)Forestnone00none
(3.)Defence Installationsnone00none
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.377
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 15
(e)No. of working days 330
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.1224
(b)Percentage of Total Project Area 32.47
(c)No. of Plants to be Planted 200
(d)Funds Allocated for Plantation 2.36
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialGenerate Employment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA070
(ii)Name of the EIA Consultant EQMS INDIA PVT LTD
(iii)Address 304-305 rishab corporate tower new delhi
(iv)Mobile No. 8890836012
(v)Landline No. 0113000320
(vi)Email Id eqms@eqmsindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 23 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease clarify the following along with the supporting documents:- - None of the proposed products/pesticides (Thiram, Ziram) are banned for manufacturing and/or their usage. - Public hearing held on 29/8/2017 was under the chairmanship of ADM rank officer. - No industrial operations at the project site. 03 Mar 2019
2.NAThe correction have been made as per the instruction received 05 Mar 2019
3.NAPlease reply to last two observations dated 3/3/2019 along with the supporting documents for consideration of the proposal. 23 Mar 2019
4.NAThe correction have been made as per the instruction received 30 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKaleem Choudhary
DesignationDirector
Name of Company (Applicant Name should not be given here)CENTRAL INSECTICIDE AND FERTILIZERS
AddressS-221,Unnati Tower,Central Spine,Sector-6 ,Vidyadhar Nagar,jaipur