1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/S. Oswal Smelter Pvt. Ltd | (b)Name of the Company / Organisation | M/S. OSWAL SMELTER PVT. LTD | (c)Registered Address | Gollapuram Village, Hindupuram Mandal,,,Anantapur,Andhra Pradesh-515211 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | subhash chand jain | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Oswal group, No. 1034, 4th block rajajinagar, Dr. Raj Kuman Road, Banglore,,Bangalore South,Bangalore Urban,Karnataka-560010 | (d)Pin code | 560010 | (e)E-mail | oswalsmelter@gmail.com | (f)STD Code. | 40(f)Telephone No. | 23816333 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/AP/IND/95777/2018 | (d)Master Proposal Number(Single Window) | SW/95749/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy. No. 31-1, 2, 3,32-1A, 2B, 37-2, 38-1, 2 & 48-1 | (b)Pincode | 515211 | (c)Bounded Latitudes (North) | | From | | Degree | 134422.11 | Minutes | | Second | | From | | Degree | 13446.74 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 134418.85 | Minutes | | Second | | From | | Degree | 13448.43 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57G/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 665 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Andhra Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/643/2008- IA-11(1) | (c)Date of Issue of TOR | 28 Mar 2018 | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 14 Aug 2019 | (c)Date of Issue of EC | 10 Feb 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 31 Oct 2018 | Distance of Public Hearing Venue from the Proposed Project : | 2.5 |
| APIIC OFFICE PREMISES, BESIDE STATE BANK OF INDIA, GROWTH CENTER | State : | Andhra Pradesh | District : | Anantapur | Tehsil : | Hindupur | Village : | THUMAKUNTA |
| 120 | employment to local people, maintain green belt in plant, medical support to local villages | District Magistrate | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | F.NO EP/12.1/2010-11/9/AP/1136 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 7 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ferro alloys | 18500 | 60200 | 78700 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Electric arc furnace | 1x9 MVA | 3x12.5 MVA | 1x9 MVA & 3x12.5 MVA | none | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 26 Apr 2016 | (iv)Valid Upto | 31 Dec 2020 | (v)File No. | APPCB/ KNL/ ATP/ 142/ CFO/ 2016 | (vi)Application No. | APPCB/ KNL/ ATP/ 142/ CFO/ 2016 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 55 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.05 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.6 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.407 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 143108 | (b)Existing quantity of raw material/fuel | 51800 | (c)Total quantity of raw material/fuel | 194908 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Ferro Alloys | 194908 | Tons per Annum | | Indian market | Road | | 100 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 03 Mar 2018 To 29 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 18.9 | 14.3 | 17.7 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 70.8 | 57.5 | 70.7 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 23.9 | 18.4 | 22.2 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 31.6 | 23.6 | 31.5 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 00 | 00 | 00 | 00 | (2.) | Total Hardness | | | mg/l | | 179.88 | 155.0 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 0.34 | 0.15 | 1.0 | 1.5 | (4.) | Heavy Metals | | led, mercury, led, chromium, arsenic | mg/l | | 00 | 00 | 00 | 00 | (5.) | pH | | | NA | | 7.85 | 7.05 | 6.5 | 8.5 | (6.) | TDS | | | mg/l | | 610 | 420 | 500 | 2000 | (7.) | Chlorides | | | mg/l | | 165.12 | 70.48 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 7.75 | 7.62 | A | (2.) | DO | | mg/l | | 5.8 | 5.7 | A | (3.) | COD | | mg/l | | 16 | 8 | A | (4.) | BOD | | mg/l | | 4.1 | 3.8 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.4 | 51.4 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.8 | 41.0 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 56.73 | 31.51 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 31.34 | 8.96 | (3.) | K(Potassium) | Milligram per Kilogram | | 171.24 | 95.16 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 180 | 130 | (5.) | pH | | | 7.42 | 6.55 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30 To 60 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | tankers and rain water harvesting | 254 | 5.0 | Copy of Permission Letter | modeOthers | tankers | Others | tankers | grampanchayat letter dated 12/06/2018 | 12 Jun 2018 | 100 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste | 20 | 30 | Septic tank followed by Soak pit | Others | Septic tank followed by soak pit | 0 | 20 | (2.) | cooling | 0 | 0 | re cycling | Reuse within the Plant & Recycling | | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 20 | (b)Total Discharged Water (Kilolitre per Day) | 20 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Ferro Silicon Slag | Industrial Waste | | 8.016 | Tons | 00 | Road | | Others | filling the low laying areas | (2.) | Fe Titanium Slag | Industrial Waste | | 1.44 | Tons | 00 | Road | | Others | sent to cement industry | (3.) | Fe Vanadium Slag | Industrial Waste | | 1.44 | Tons | 00 | Road | | Others | Filling low laying areas | (4.) | Fe Boron Slag | Industrial Waste | | 1.44 | Tons | 00 | Road | | Others | Filling low laying areas | (5.) | Mc FeMn Slag | Industrial Waste | | 3.6 | Tons | 00 | Road | | Others | Filling low laying areas | (6.) | Fe Neobium Slag | Industrial Waste | | 1.44 | Tons | 00 | Road | | Authorized Recyclers | | (7.) | Lc FeMn Slag | Industrial Waste | | 3.6 | Tons | 00 | Road | | Authorized Recyclers | | (8.) | Fe Moly Slag | Industrial Waste | | 1.44 | Tons | 00 | Road | | Others | Brick manufactures | (9.) | Ferro manganese slag | Industrial Waste | | 65.45 | Tons | 0.0 | Road | | Others | sent to SiMn manufacturing proces | (10.) | Silico manganese slag | Industrial Waste | | 68.175 | Tons | 0.0 | Road | | Co-Processing | used in process | (11.) | FeSiZr | Industrial Waste | | 1.2 | Tons | 00 | Road | | Others | Filling low laying areas | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 70.8 | 1.5 | 3.73 | 74.54 | 100 | (2.) | NOx | | Microgram per Meter Cube | 23.9 | 1.5 | 4.87 | 28.78 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 00 | 1.5 | 00 | 01 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 00 | 1.5 | 00 | 01 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Furnace | Electricity | 30 | 1.5 | PM10 | | 0.71 | (2.) | Furnance | Elecirity | 30 | 1.5 | NOx | | 2.35 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 49500 | (b)Source | APEPDCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 250 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 30.9 | (c)Government Land (ha.) | 4.8 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 35.7 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 35.7 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NO LAND IS REQUIRED | 0 | Total (ha.) | 35.7 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 10.6 | | (2.) | Green belt | | 12.2 | | (3.) | Others | FUTURE EXPANSION | 12.9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | 0 | 0 | NA | (2.) | ESAs | 0 | 0 | NA | (3.) | Corridors | 0 | 0 | NA | (4.) | Wildlife Corridors | 0 | 0 | NA | (5.) | NPA | 0 | 0 | NA | (6.) | ESZs | NONE | 0 | NO ecological sensitivity zones are there in with in 10km | (7.) | Critically Polluted Area | 0 | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | 0 | 0 | NA | (2.) | Defence Installations | | 0 | 0 | NA | (3.) | Forest | | 0 | 0 | NA | (4.) | Others | none | none | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 14.4 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 110 | (c)Temporary Employment- During Construction | 60 | (d)Temporary Employment- During Operation | 190 | (e)No. of working days | 330 | (f)Total Manpower | 410 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 12.2 | 0 | 12.2 | (2.) | Percentage of Total Project Area | 34.17 | 0 | 34.17 | (3.) | No. of Plants | 1058 | 6292 | 7350 | (4.) | Funds Allocated | 0 | 3500000 | 3500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | provides income to government | (2.) | Social | Employement | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 051 | (ii)Name of the EIA Consultant | Eco Chem Sales & Services (ECSS) | (iii)Address | Office floor, Ashoka Pavillion - A, Opp.Kapadia Health Club, New Civil road, Surat - 395001, Gujarat | (iv)Mobile No. | 8458979969 | (v)Landline No. | 0261223163 | (vi)Email Id | eco@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 03 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The below EDS was raised on 16/04/2019. However, it is observed that reply to the EDS has not been furnished.
i. Water abstraction permission from the competent authority shall be furnished for the existing and proposed projects.
ii. Impact Assessment shall be carried out for the worst case scenarios involving different combinations of ferro alloys production at a time.
iii. In Form 2, the name of the consultant is mentioned as M/s. Sri Sai Mansa Nature, accredited for Cat ‘A’ with respect to schedule 3(a). Whereas on report name of consultant is different. Same may be updated. | 18 May 2019 | 2. | NA | The correction have been made as per the instruction received | 05 Aug 2019 | 3. | NA | Proposal returned due to the following:
• Permission for drawl of 254 KLD bore well water from the Competent Authority shall be furnished.
• Details regarding slag generated from Fe moly, Fe Titanium, Fe Vanadium, Fe Boron, McFeMn, LcFeMn, Fe Niobium, Cored Wire and FeSiZr and its disposal shall be furnished. | 13 Aug 2019 | 4. | NA | The correction have been made as per the instruction received | 14 Aug 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | subhash chand jain | Designation | Director | Name of Company (Applicant Name should not be given here) | M/S. OSWAL SMELTER PVT. LTD | Address | Gollapuram Village, Hindupuram Mandal, |
|