(a)Name of the project(s) M/S. Oswal Smelter Pvt. Ltd
(b)Name of the Company / Organisation M/S. OSWAL SMELTER PVT. LTD
(c)Registered Address Gollapuram Village, Hindupuram Mandal,,,Anantapur,Andhra Pradesh-515211
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant subhash chand jain
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Oswal group, No. 1034, 4th block rajajinagar, Dr. Raj Kuman Road, Banglore,,Bangalore South,Bangalore Urban,Karnataka-560010
(d)Pin code 560010
(e)E-mail oswalsmelter@gmail.com
(f)STD Code. 40(f)Telephone No. 23816333
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND/95777/2018
(d)Master Proposal Number(Single Window) SW/95749/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy. No. 31-1, 2, 3,32-1A, 2B, 37-2, 38-1, 2 & 48-1
(b)Pincode 515211
(c)Bounded Latitudes (North)
From
Degree 134422.11
Minutes
Second
From
Degree 13446.74
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 134418.85
Minutes
Second
From
Degree 13448.43
Minutes
Second
(e)Survey of India Topo Sheet No. 57G/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 665
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/643/2008- IA-11(1)
(c)Date of Issue of TOR 28 Mar 2018
(f)Previous TOR Letter NA
(b)Date of Apply of EC 14 Aug 2019
(c)Date of Issue of EC 10 Feb 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :30 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :2.5
APIIC OFFICE PREMISES, BESIDE STATE BANK OF INDIA, GROWTH CENTER
State :Andhra Pradesh
District :Anantapur
Tehsil :Hindupur
Village :THUMAKUNTA
120employment to local people, maintain green belt in plant, medical support to local villagesDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. F.NO EP/12.1/2010-11/9/AP/1136
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 7 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ferro alloys185006020078700Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Electric arc furnace1x9 MVA3x12.5 MVA1x9 MVA & 3x12.5 MVAnone
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Apr 2016
(iv)Valid Upto 31 Dec 2020
(v)File No. APPCB/ KNL/ ATP/ 142/ CFO/ 2016
(vi)Application No. APPCB/ KNL/ ATP/ 142/ CFO/ 2016
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 55
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.05
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.6
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.407
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 143108
(b)Existing quantity of raw material/fuel 51800
(c)Total quantity of raw material/fuel 194908
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ferro Alloys194908Tons per AnnumIndian marketRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 03 Mar 2018 To 29 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.914.317.780
(2.)PM10Micro Gram per Meter Cube70.857.570.7100
(3.)NOxMicro Gram per Meter Cube23.918.422.280
(4.)PM2.5Micro Gram per Meter Cube31.623.631.560
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA00000000
(2.)Total Hardnessmg/l179.88155.0200600
(3.)Fluoridemg/l0.340.151.01.5
(4.)Heavy Metalsled, mercury, led, chromium, arsenicmg/l00000000
(5.)pHNA7.857.056.58.5
(6.)TDSmg/l6104205002000
(7.)Chloridesmg/l165.1270.482501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l7.757.62A
(2.)DOmg/l5.85.7A
(3.)CODmg/l168A
(4.)BODmg/l4.13.8A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.451.475
(2.)Leq(Night)A-weighted decibels(dB(A))52.841.070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram56.7331.51
(2.)P(Phosphorus)Milligram per Kilogram31.348.96
(3.)K(Potassium)Milligram per Kilogram171.2495.16
(4.)Electric ConductivityMillisiemens per Centimetre180130
(5.)pH7.426.55
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 60
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherstankers and rain water harvesting2545.0Copy of Permission LettermodeOtherstankersOtherstankersgrampanchayat letter dated 12/06/201812 Jun 2018100
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste2030Septic tank followed by Soak pitOthersSeptic tank followed by soak pit020
(2.)cooling00re cyclingReuse within the Plant & Recycling0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20
(b)Total Discharged Water (Kilolitre per Day) 20
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Ferro Silicon SlagIndustrial Waste8.016Tons00RoadOthersfilling the low laying areas
(2.)Fe Titanium SlagIndustrial Waste1.44Tons00RoadOtherssent to cement industry
(3.)Fe Vanadium SlagIndustrial Waste1.44Tons00RoadOthersFilling low laying areas
(4.)Fe Boron SlagIndustrial Waste1.44Tons00RoadOthersFilling low laying areas
(5.)Mc FeMn SlagIndustrial Waste3.6Tons00RoadOthersFilling low laying areas
(6.)Fe Neobium SlagIndustrial Waste1.44Tons00RoadAuthorized Recyclers
(7.)Lc FeMn SlagIndustrial Waste3.6Tons00RoadAuthorized Recyclers
(8.)Fe Moly SlagIndustrial Waste1.44Tons00RoadOthersBrick manufactures
(9.)Ferro manganese slagIndustrial Waste65.45Tons0.0RoadOtherssent to SiMn manufacturing proces
(10.)Silico manganese slagIndustrial Waste68.175Tons0.0RoadCo-Processingused in process
(11.)FeSiZrIndustrial Waste1.2Tons00RoadOthersFilling low laying areas
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube70.81.53.7374.54100
(2.)NOxMicrogram per Meter Cube23.91.54.8728.7880
(3.)SO2Microgram per Meter Cube001.5000180
(4.)PM2.5Microgram per Meter Cube001.5000160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)FurnaceElectricity301.5PM100.71
(2.)FurnanceElecirity301.5NOx2.35
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 49500
(b)Source APEPDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 250
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 30.9
(c)Government Land (ha.) 4.8
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 35.7
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 35.7
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NO LAND IS REQUIRED 0
    Total (ha.) 35.7
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant10.6
(2.)Green belt12.2
(3.)OthersFUTURE EXPANSION12.9
Total (ha.) 35.7
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLS00NA
(2.)ESAs00NA
(3.)Corridors00NA
(4.)Wildlife Corridors00NA
(5.)NPA00NA
(6.)ESZsNONE0NO ecological sensitivity zones are there in with in 10km
(7.)Critically Polluted Area00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sites00NA
(2.)Defence Installations00NA
(3.)Forest00NA
(4.)Othersnonenone0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 14.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 110
(c)Temporary Employment- During Construction 60
(d)Temporary Employment- During Operation 190
(e)No. of working days 330
(f)Total Manpower 410
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt12.2012.2
(2.)Percentage of Total Project Area34.17034.17
(3.)No. of Plants105862927350
(4.)Funds Allocated035000003500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Financialprovides income to government
(2.)SocialEmployement
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA 051
(ii)Name of the EIA Consultant Eco Chem Sales & Services (ECSS)
(iii)Address Office floor, Ashoka Pavillion - A, Opp.Kapadia Health Club, New Civil road, Surat - 395001, Gujarat
(iv)Mobile No. 8458979969
(v)Landline No. 0261223163
(vi)Email Id eco@ecoshripad.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 03 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe below EDS was raised on 16/04/2019. However, it is observed that reply to the EDS has not been furnished. i. Water abstraction permission from the competent authority shall be furnished for the existing and proposed projects. ii. Impact Assessment shall be carried out for the worst case scenarios involving different combinations of ferro alloys production at a time. iii. In Form 2, the name of the consultant is mentioned as M/s. Sri Sai Mansa Nature, accredited for Cat ‘A’ with respect to schedule 3(a). Whereas on report name of consultant is different. Same may be updated. 18 May 2019
2.NAThe correction have been made as per the instruction received 05 Aug 2019
3.NAProposal returned due to the following: • Permission for drawl of 254 KLD bore well water from the Competent Authority shall be furnished. • Details regarding slag generated from Fe moly, Fe Titanium, Fe Vanadium, Fe Boron, McFeMn, LcFeMn, Fe Niobium, Cored Wire and FeSiZr and its disposal shall be furnished. 13 Aug 2019
4.NAThe correction have been made as per the instruction received 14 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantsubhash chand jain
DesignationDirector
Name of Company (Applicant Name should not be given here)M/S. OSWAL SMELTER PVT. LTD
AddressGollapuram Village, Hindupuram Mandal,
Print