1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Offshore Oil & Gas Drilling/ Development and Production from 8 wells in Western Offshore Block MB/OSDF/B80/2016 of Heera Panna Basin in Arabian Sea | (b)Name of the Company / Organisation | Hindustan Oil Exploration Company Ltd | (c)Registered Address | Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, C,Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, C,Chennai,Lakshadweep-600018 | (d)Legal Status of the Company | Joint Venture(Pvt+Govt.) | (e)Joint Venture | Yes | |
|
1.1. No. of JV Partners 2 |
---|
S. No. | Name of the JV Partner | Share of the JV Partner | Address of the JV Partner | Email Id of JV Partner | Mobile No. of JV Partner |
---|
(1.) | Oil India Limited | 44.086% | OIL INDIA LIMITED, EASTERN ASSET MANNING, DULIAJAN, ASSAM-786602 | jppdas@oilindia.in | 9435005611 | (2.) | Indian Oil Corporation Limited | 29.032% | INDIAN OIL, 7TH FLOOR, INDIAN OIL BHAVAN, NO-1, SRI AUROBINDO MARG, YUSUF SARAI, NEW DELHI-110 016 | ashokkumar@indianoil.in | 9873936005 | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Janakiraman Janakiraman Ganesan | (b)Designation (Owner/ Partner/ CEO) | Head - HSE | (c)Address | Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, Chennai - 600018,Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, Chennai - 600018,KandiVali,Chennai,Lakshadweep-600018 | (d)Pin code | 600018 | (e)E-mail | gjanakiraman@hoec.com | (f)STD Code. | 44(f)Telephone No. | 66229000 | (g)Fax No. | 04466229011 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Category | A | (c)Proposal Number | IA/MH/IND2/95746/2017 | (d)Master Proposal Number(Single Window) | SW/95743/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | NA | (b)Pincode | 400053 | (c)Bounded Latitudes (North) | | From | | Degree | 185900 | Minutes | | Second | | From | | Degree | 190300 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 714300 | Minutes | | Second | | From | | Degree | 714719 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | NA | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 0 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 110 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA/MH/IND2/70980/2017 | (b)Date of Apply of TOR | 17 Nov 2017 | (c)Date of Issue of TOR / Standard ToR | 01 Feb 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public consultation is exempted as the proposed pr | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | MOPU | MOPU for well fluid processing | | (2.) | Development wells | 8 development wells | | (3.) | Pipeline | 11.5 km Oil and 1.35 km gas pipeline | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Oil & Gas production | 15000 | Others | blpd | Pipe Conveyor | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 228 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 22.94 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 9 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 9 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | High Speed Diesel | 9 | Kilo Litre per Day | | Local | Pipe Conveyor | | 110 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Oct 2018 To 30 Dec 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 0 | 0 | 0 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 0 | 0 | 0 | 60 | |
14.2. No. of Ground Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 0 | 0 | 500 | 2000 | (3.) | Chlorides | | | mg/l | | 0 | 0 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0 | 0 | 1 | 1.5 | (5.) | Others | Total coliform | | Others | MPN/100 ml | 0 | 0 | 9 | 0 | (6.) | Total Hardness | | | mg/l | | 0 | 0 | 300 | 600 | (7.) | Heavy Metals | | cadmium | mg/l | | 0 | 0 | 0.003 | 0.003 | (8.) | pH | | | Others | NA | 0 | 0 | 8.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.8 | 7.4 | B | (2.) | DO | | mg/l | | 5.73 | 4.12 | B | (3.) | BOD | | mg/l | | 2 | 2 | B | (4.) | COD | | mg/l | | 12 | 4 | B | (5.) | Others | TPH | Others | micro gm/l | 6.8 | 3.8 | B | |
14.4. No. of Ambient Noise monitoring locations : 0 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 0 | 0 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 0 | 0 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 9.1 | 8.2 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 0 | 0 | (3.) | Electric Conductivity | Milliequivalents per 100 Gram | | 0 | 0 | (4.) | N(Nitrogen) | Milligram per Kilogram | | 9 | 0 | (5.) | K(Potassium) | Milligram per Kilogram | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mumbai Port Authority | 69.15 | 110 | Copy of Permission Letter | modeOthers | Supply vessel | Others | Port supply | NA | 30 Jan 2019 | 45.65 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Deck cleaning | 10 | 15 | ETP | Discharge into Seawater Body | | | 10 | (2.) | Sewage | 10.8 | 15 | STP | Discharge into Seawater Body | | | 10.8 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 20.8 | (b)Total Discharged Water (Kilolitre per Day) | 20.8 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Drill cuttings | Industrial Waste | | 1344 | Tons | 0 | Others | Disposed in the sea | Others | Disposed as per MoEF&CC guidelines | (2.) | Spent mud | Industrial Waste | | 720 | Tons | 0 | Others | Disposed in the sea | Others | Disposed as per MoEF&CC guidelines | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 0 | 1.2 | 1.31 | 1.312 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 0 | 1.2 | 0.11 | 0.112 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 0 | 1.2 | 2.808 | 2.8085 | 80 | (4.) | NOx | | Microgram per Meter Cube | 0 | 1.2 | 23.11 | 23.112 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 0 | 1.2 | 6.035 | 6.0356 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG | HSD | 7 | 0.6 | PM10 | | 0.175 | (2.) | DG | HSD | 7 | 0.6 | Others | CO | 0.305 | (3.) | DG | HSD | 7 | 0.6 | NOx | | 2.082 | (4.) | DG | HSD | 7 | .06 | SO2 | | 0.0272 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3750 | (b)Source | DG Sets (3 x 1250 KVA) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | DG (3 x 1250 KVA) | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 56.016 | Total Land (ha.) | 56.016 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Offshore area | 0 | Total (ha.) | 0 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Offshore drilling | 0 | Offshore drilling | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | No | 0 | Not falling in critically polluted area | (2.) | WLS | No | 0 | No WLS | (3.) | Corridors | No | 0 | No ESZ | (4.) | Wildlife Corridors | No | 0 | No Wildlife corridor | (5.) | ESAs | No | 0 | No ESA | (6.) | NPA | No | 0 | No NPA | (7.) | ESZs | No | 0 | No ESZ | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | No | 0 | No Forest | (2.) | Archaeological Sites | | No | 0 | No archaeological site | (3.) | Others | NA | No | 0 | NA | (4.) | Defence Installations | | No | 0 | No Defense Installation | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | offshore area land is not required | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Offshore area | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | offshore area | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 55 | (c)Temporary Employment- During Construction | 120 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 175 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0 | (b)Percentage of Total Project Area | 0.00 | (c)No. of Plants to be Planted | 0 | (d)Funds Allocated for Plantation | 0 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Direct Employment during drilling the well at each location will be 100 people and indirect employment will be 75. During production direct employment will be 25 and indirect employment will be 50 | (2.) | Environmental | India’s economic growth is closely related to energy demand; therefore, the need for oil and gas is projected to grow more, thereby making the sector quite conducive for investment. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA-0055 | (ii)Name of the EIA Consultant | ERM India Private Limited | (iii)Address | Building 10, Tower A, 4th Floor, DLF Cyber City, Gurgaon 122002 | (iv)Mobile No. | 0981006816 | (v)Landline No. | 0124417030 | (vi)Email Id | subir.gupta@erm.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 31 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | The instant project site is located beyond 12 nautical miles accordingly the applicability of the EIA Notification is under examination/consideration in the Ministry. The PP may be informed accordingly in due course of time. | 21 Mar 2020 | 2. | NA | The instant project site is located beyond 12 nautical miles accordingly the applicability of the EIA Notification is under examination/consideration in the Ministry. The PP may be informed accordingly in due course of time. | 21 Mar 2020 | 3. | NA | The instant project site is located beyond 12 nautical miles accordingly the applicability of the EIA Notification is under examination/consideration in the Ministry. The PP may be informed accordingly in due course of time. | 21 Mar 2020 | 4. | NA | The instant project site is located beyond 12 nautical miles accordingly the applicability of the EIA Notification is under examination/consideration in the Ministry. The PP may be informed accordingly in due course of time. | 21 Mar 2020 | 5. | NA | The instant project site is located beyond 12 nautical miles accordingly the applicability of the EIA Notification is under examination/consideration in the Ministry. The PP may be informed accordingly in due course of time. | 21 Mar 2020 | 6. | NA | The instant project site is located beyond 12 nautical miles accordingly the applicability of the EIA Notification is under examination/consideration in the Ministry. The PP may be informed accordingly in due course of time. | 21 Mar 2020 | 7. | ADS Reply Letter | Respected sir, Hereby we submitting the revised EIA with submission letter and undertaking.
We merged the following documents in PDF format 1. Submission letter 2. Undertaking 3.Revised EIA report 4.Annexures .
kindly review and consider our proposal in the next EAC meeting. | 13 Sep 2019 | 8. | NA | Deferred | 17 May 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Janakiraman Janakiraman Ganesan | Designation | Head - HSE | Name of Company (Applicant Name should not be given here) | Hindustan Oil Exploration Company Ltd | Address | "HOEC House" Tandaljia Road,
Vadodara -390020, Gujarat |
|