Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development of Durg-Raipur Section of NH-53(Mumbai Kolkata Economic Corridor) start at near Village Tadesara, Dist. Durg and terminate at near Village Paragaon-1, Arang, Dist. Raipur, Chhattisgarh
(b)Name of the Company / Organisation NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR
(c)Registered Address D-61, HIG-1 (Akash), Abhilash Parisar, Behind Hitech Bus Stand, Tifra, Bilaspur,,Bilaspur,Chhattisgarh-495001
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Narendra Singh
(b)Designation (Owner/ Partner/ CEO) ProjectDirector
(c)Address D-61, HIG-1,Abhilasha Parisar, Tifra, Bilaspur,,Bilaspur,Bilaspur,Chhattisgarh-495001
(d)Pin code 495001
(e)E-mail piubilaspur@nhai.org
(f)STD Code. 7752(f)Telephone No. 2282354
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/NCP/94760/2018
(d)Master Proposal Number(Single Window) SW/95690/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Attached as Additional Document
(b)Pincode 491441
(c)Bounded Latitudes (North)
From
Degree 21.13840556
Minutes
Second
From
Degree 21.15149722
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 81.180005
Minutes
Second
From
Degree 82.01194444
Minutes
Second
(e)Survey of India Topo Sheet No. 64 G/4, G/8, G/12 AND G/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 315
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamTinsukiaDoom DoomaBaghjan, Dighaltarang
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-72/2018-IA-III
(c)Date of Apply of TOR 25 Aug 2018
(d)Date of Issue of TOR / Standard ToR 28 Dec 2019
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :03 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :5
Manas Bhawan, Near Ravi Shankar Stadium, Durg
State :Chhattisgarh
District :Durg
Tehsil :Durg
Village :Durg city
107Major issues were related to CompensationOthersAdditional District Magistrate
(2.)
Date of Advertisement :04 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :15
Collectorate Conference Hall, Raipur Collectorate
State :Chhattisgarh
District :Raipur
Tehsil :Raipur
Village :Raipur
65Major issues were related to compensationOthersAdditional District Magistrate
(3.)
Date of Advertisement :04 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :06 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :0
Open Area near Gram Panchayat Building, Village Dewada
State :Chhattisgarh
District :Rajnandgaon
Tehsil :Rajnandgaon
Village :Dewada
78Major issues were related to compensationOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)National Highway4 Lane / 70 m RoWEconomic Corridor
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)92.2 km & 70m RoW92.2KilometersRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1382
(b) Funds Allocated for Environment Management (Capital) (in Crores) 12.20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 19.72
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.213
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 19605256
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 19605256
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Aggregate1451988OthersCUMNearby approved quarriesRoad19 Open MarketCopy of Linkage
(2.)Cement220759OthersMTNearby Cement PlantRoad45 Open MarketCopy of Linkage
(3.)Fly Ash2056432OthersCUMNearby Power PlantsRoad50 Open MarketCopy of Linkage
(4.)Borrow Earth11996645OthersCUMNearby Borrow AreaRoad0 Open MarketCopy of Linkage
(5.)Bitumen23369OthersMTRefinery in OdishaRoad630 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube39.817.636.880
(2.)PM10Micro Gram per Meter Cube7958.878.5100
(3.)PM2.5Micro Gram per Meter Cube49.927.445.860
(4.)SO2Micro Gram per Meter Cube21.97.119.480
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.927.326.58.5
(2.)Chloridesmg/l388.425.292501000
(3.)Fluoridemg/l0.90.0211.5
(4.)TSSmg/l42100
(5.)Heavy MetalsIronmg/l0.9340.020.30.3
(6.)TDSmg/l12823055002000
(7.)Total Hardnessmg/l62746200600
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.97.1C
(2.)CODmg/l0.10.1C
(3.)pHNA7.97.27C
(4.)BODmg/l0.10.1C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))514255
(2.)Leq(Night)A-weighted decibels(dB(A))423445
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Percent0.490.13
(2.)K(Potassium)Percent0.390.16
(3.)P(Phosphorus)Percent0.0410.022
(4.)Electric ConductivityOthersµmhos/cm342162
(5.)pH8.657.97
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.24 To 2.7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.7 To 10.24
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface40720 Not Appliacble modeOthersTankerOthersDirect WithdrawalNA01 Jan 19904072
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Sewage43.251.8Portable STPGreen Belt Renewal Plant,OthersDust Suppression43.20
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 43.2
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 43.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Camp WasteMunicipal Solid Waste121.5Tons0RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube78.50078.51100
(2.)PM2.5Microgram per Meter Cube45.80045.8160
(3.)NOxMicrogram per Meter Cube36.80036.8180
(4.)Others(Specify)COMicrogram per Meter Cube1.140.020.581.722
(5.)SO2Microgram per Meter Cube19.40019.4180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10000
(b)Source State Electricity Board and DG Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 701.8595
(c)Government Land (ha.) 44.7545
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 746.614
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 273.44
(b)Waste/Barren Land (ha.) 194.09
(c)Grazing/ Community Land (ha.) 94.61
(d)Surface Water Bodies (ha.) 26.44
(e)Settlements (ha.) 53.27
(f)Industrial (ha.) 5.54
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Shrubs & Fallow 99.224
    Total (ha.) 746.614
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersRoW for Highway746.614
Total (ha.) 746.614
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSBarnawapara Wildlife Sanctuary30More than 10 km
(2.)NPANone.No area within 10km
(3.)CorridorsNone.No within 10km
(4.)ESZsNone.No area within 10km
(5.)Critically Polluted AreaNone.No area within 10km
(6.)ESAsNone.No area within 10km
(7.)Wildlife CorridorsNone.No within 10km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone.No forest inside Project RoW
(2.)Archaeological SitesNone.No such site within 300m
(3.)Defence InstallationsNone.No such installation
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 9731
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 597.291
(b)Land yet to be acquired(Ha) 149.323
(c)Status of Land acquisition if not acquired In progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 54
(b)No. of Households 3800
(c)No. of PDFs (Project Displaced Families) 3800
(d)No. of PAFs (Project Affected Families) 3800
(e)Funds Allocated for R&R(in INR) (in Lacs) .
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 2 River, 9 irrigation Channels and One Pond
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area River and Other Water Bodies
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 200
(b)Permanent Employment-During Operation 100
(c)Temporary Employment- During Construction 800
(d)Temporary Employment- During Operation 100
(e)No. of working days 540
(f)Total Manpower 1200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 369
(b)Percentage of Total Project Area 49.42
(c)No. of Plants to be Planted 115500
(d)Funds Allocated for Plantation 17.32
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialShall save time and fuel of the commuters
(2.)EnvironmentalThe proposed bypass shall reduce the carbon emission by diverting traffic.
(3.)SocialShall connect remote areas
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) .
(b)Total No. of Flats to be Build .
(c)No. of Buildings .
(d)Total plot area (sqm) 746.614
(e)Total built up area (sqm) 746.614
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 180
(b)Capacity 1000
(c)No. of Recharge Pits 180
(d)Capacity 1000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2
5.
Energy Saving Measures:
(a)Source/Mode Solar Light
(b)Percentage 20
(c)Quantity .
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area 0
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 92.2
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 33
(b)Total No. of ROB 2
(c)Total No. of Interchanges 4
(d)Total No. of Flyovers 2
(e)Total No. of Vehicle Underpass 39
(f)Total No. of Pedestrian Underpass 2
(g)Details of other utilities rail and road corridors .
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0116
(ii)Name of the EIA Consultant Feedback Infra Pvt. Ltd.
(iii)Address 15th Floor, Tower 9B, DLF Cyber City, Phase III, Gurgaon
(iv)Mobile No. 9868563137
(v)Landline No. 0124441690
(vi)Email Id raj.singh@feedbackinfra.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 26 Aug 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarendra Singh
DesignationProjectDirector
Name of Company (Applicant Name should not be given here)NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BILASPUR
AddressD-61, HIG-1 (Akash), Abhilash Parisar, Behind Hitech Bus Stand, Tifra, Bilaspur