Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Kawatha Manganese Mine
(b)Name of the Company / Organisation RACHANA BELORKAR
(c)Registered Address R/o Plot No. 57, Flat No.D/2, Kanchangeet Apartment, Shivaji Nagar Nagpur,,Nagpur,Maharashtra-440010
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rachana A Belorkar
(b)Designation (Owner/ Partner/ CEO) Owner
(c)Address R/o. Plot No. 57 Flat No. D/2, Kanchangeet Apartment, Shivaji Nagar Nagpur,,Savner,Nagpur,Maharashtra-440010
(d)Pin code 440010
(e)E-mail rbelorkar001@gmail.com
(f)STD Code. 712(f)Telephone No. 2242007
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/MIN/95635/2016
(d)Master Proposal Number(Single Window) SW/95614/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasara no. 251, 253, 254, 255, 259, 267, 268, 269
(b)Pincode 441112
(c)Bounded Latitudes (North)
From
Degree 212932.541
Minutes
Second
From
Degree 212957.810
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 785339.245
Minutes
Second
From
Degree 78545.703
Minutes
Second
(e)Survey of India Topo Sheet No. 55K/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 390
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.4
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/227/2015-IA.II(M)
(b)Date of Apply of TOR 04 Nov 2016
(c)Date of Issue of TOR / Standard ToR 09 Nov 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :18 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :2.5
Grampanchayat office, Kawatha, Tal. Saoner, Dist. Nagpur of Maharashtra State
State :Maharashtra
District :Nagpur
Tehsil :Savner
Village :kawatha
971. Road maintenance 2.employment 3. effect on agricultural yield 4. use of ground water 5. land ownership in mine lease areaOthersAdditional District Collector, Nagpur
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Minearea 26.67 ha Capacity 2732TPAOpen cast manual mining
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)26.67 Ha2732Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3.0205
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.2905
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.061
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 35626
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 35626
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)RoM956Tons per Annumwithin mineRoad0 Othersown mineCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 01 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMicro Gram per Meter Cube0.3290.1050.3262
(2.)SO2Micro Gram per Meter Cube17.45.516.980
(3.)NOxMicro Gram per Meter Cube34.38.134.180
(4.)PM10Micro Gram per Meter Cube84.641.384.3100
(5.)PM2.5Micro Gram per Meter Cube33.413.233.260
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.267.728.58.5
(2.)Total Hardnessmg/l882211.89200600
(3.)TSSmg/l651000
(4.)Heavy Metalsironmg/l0.260.051.00
(5.)TDSmg/l12363185002000
(6.)Fluoridemg/l2.270.211.01.5
(7.)Chloridesmg/l269.0729.352501000
    14.3.     No. of Surface Water monitoring locations : 02
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.488.09A
(2.)BODmg/l20A
(3.)CODmg/l40C
(4.)DOmg/l6.56.4A
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))63.545.375
(2.)Leq(Night)A-weighted decibels(dB(A))51.335.670
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.857.2
(2.)N(Nitrogen)Kilogram per hectare161.12125.17
(3.)P(Phosphorus)Kilogram per hectare18.5212.18
(4.)K(Potassium)Kilogram per hectare1132.72128.75
(5.)Electric ConductivityMillisiemens per Centimetre456.6111
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 3
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherswater supplier1510 Not Appliacble modeOthersTankerOthersWater supplierNA18 Feb 201915
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)soak pit0.81.0NAOthersSoak pit0.80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ore rejectOthersMineral reject1967.524Tons0Otherswithin mine siteOthersbackfill
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube84.61.48.1992.79100
(2.)PM2.5Microgram per Meter Cube27.81.42.430.560
(3.)NOxMicrogram per Meter Cube19.81.4019.8180
(4.)SO2Microgram per Meter Cube13.81.4013.8580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 40
(b)Source DG
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1 DG of 40kva
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 26.67
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 26.67
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 26.67
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 26.67
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area0.2544
(2.)Green belt0.2850570 trees in proposed 5 year
(3.)Safety Zone2.63
Total (ha.) 3.1694
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0None
(2.)NPANA0None
(3.)Wildlife CorridorsNA0None
(4.)Critically Polluted AreaNA0None
(5.)ESZsNA0None
(6.)ESAsNA0None
(7.)CorridorsNA0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserved forest0.5scrub forest not in mining lease area
(2.)Defence InstallationsNA0None
(3.)OthersNANA0NA
(4.)Archaeological SitesNA0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 26.67
(c)Status of Land acquisition if not acquired Surface rights will be acquired by project propone
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian peafowl & Indian gazelle
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1600000
(iii)Period of Implementation 5 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. No. Desk- 1/5/Land/C.R. 35/19-20/397 Nagpur
(iii)Date of issue 09 Jul 2019
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kanhan River ~ 2.66 km, NE
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.66
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2
(b)Permanent Employment-During Operation 09
(c)Temporary Employment- During Construction 05
(d)Temporary Employment- During Operation 07
(e)No. of working days 250
(f)Total Manpower 23
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.2850
(b)Percentage of Total Project Area 1.07
(c)No. of Plants to be Planted 570
(d)Funds Allocated for Plantation 280000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalPlantation & supply of accumulated surplus rain water to farmers
(2.)Financial*Revenue generation for Government *CSR & CER funds
(3.)SocialEmployment • Drinking water facilities • Improvement of roads
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)ManganeseMajor
2.
Mine Capacity in ROM (Run of Mine) 956 TPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. NGP/MN/MPW-1173/NGP-2016
(b)Date of Approval 03 Aug 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 26.67
(f)Approved Capacity 2732
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 0.07268
(b)Mineable Reserves (Million Ton) 0.04864
(c)Extractable Reserves(Million Ton) NA
(d)Percent(%) of Extraction 80
(e)Grade of Coal /Ore /Mineral low 22% to 32%
(f)Stripping Ratio 1 : 6
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) 5
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 26.67
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 18 Jan 2016
(iii)Validity of LOI 50
(iv)Reference No. of LOI MMN-0915/CN99/industry-9
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 26.67
(iii)Validity of the lease deed From : 16 May 2017 To : 16 May 2067
(iv)Date of Execution of Mining Lese 16 May 2017
(v)Reference Number Reg. no. 39M receipt no. 2071
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 2
(ii)Total Area (in Hectare) 0.3600
(iii)Height (in meter) 3
(iv)Quantity (in Million Cubic meter) 0.006074
(v)No. of year back fill up 5
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0.001272
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0.001272
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0.2544
(b)Depth (in meter) 4
(c)Volume (in Million Cubic meter) 0.014782
12.
Details of Quarry:
(a)Final Void of 0.2544 (hectare) at a Depth of 4 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 26.67
13.
Details of Transportation:
(a)In Pit/Underground to Surface manual
(b)Surface to Siding/Loading Tipper
(c)Transportation / Conveyor Details NA
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)OTHERS(Specify)Barren land26.67026.67
(2.)SURFACE WATER BODIES000
(3.)SETTLEMENTS000
(4.)GRAZING LAND000
(5.)AGRICULTURE LAND000
(6.)FOREST LAND000
(7.)WASTE LAND000
TOTAL26.67026.67
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)TOP SOIL STORAGE0.0510000.051
(2.)ROADS0.1600000.16
(3.)GREEN BELT0.2850000.285
(4.)VIRGIN AREA25.39950025.3995
(5.)EXCAVATION/QUARRY00.254400.2544
(6.)BUILT UP AREA (COLONY/OFFICE)0.0200000.02
(7.)INTERNAL OB DUMPS0000
(8.)EXTERNAL OB DUMPS0.3600000.36
(9.)Othermineralized reject & stoarage of ore0.14000.14
TOTAL26.41550.25440026.6699
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0.3600
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0.2544
(d)Safety Zone(in hectare) 2.63
(e)Final Void of 0.2544 (hectare) at a Depth of 4 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 570
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0.2850
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)1007477470
(2.)2009039030
(3.)500273227320
(4.)300100010000
(5.)400100010000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0059(Rev.01) Dtd. 29.11.2017
(ii)Name of the EIA Consultant Anacon Laboratories Pvt. Ltd.
(iii)Address 33, Bajiprabhu Nagar, Nagpur -440033
(iv)Mobile No. 0937296007
(v)Landline No. 0712224207
(vi)Email Id ngp@anacon.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 01 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP need to submit the following: 1. Copy of Valid Lease Document. 2. Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. 3. Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. 4. Status of the Mine (working/ not). 11 Apr 2019
2.NAThe correction have been made as per the instruction received 16 Apr 2019
3.NAPlease submit the i) proof of submission of Conservation plan prepared for Schedule-1 Species to Chief Wildlife Warden, ii) copy of accreditation certificate uploaded in respect of consultant is not showing the name of consultant Anacon Laboratories Pvt. Ltd. thus submit the certificate of accreditation of consultant while preparing the EIA Report and for the current period, iii) executed lease deed needs to be submitted as the same in not provided in Annexure-1 of EIA Report, iv) list of flora & fauna separately for core and buffer zone duly authenticated by Forest Department needs to be submitted , v) GLC values in worst case scenario and control case scenario needs to be submitted taking all the activities at a time and vi) Time bound, activity wise action plan for activities proposed under Occupational Health Surveillance, EMP, Plantation, and CER needs to be submitted along with budgetary provision. Budget for each activity and its expenditure schedule needs to be submitted. 09 May 2019
4.NAThe correction have been made as per the instruction received 09 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRachana A Belorkar
DesignationOwner
Name of Company (Applicant Name should not be given here)RACHANA BELORKAR
AddressR/o Plot No. 57, Flat No.D/2, Kanchangeet Apartment, Shivaji Nagar Nagpur