1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Deepak Nitrite Limited, Hyderabad Specialties Division, Unit-III
(b)Name of the Company / Organisation DEEPAK NITRITE LIMITED
(c)Registered Address Deepak Nitrite Limited, 9/10. Kunj Society,,Alkapuri, Baroda, Gujarat,Vadodara,Gujarat-390007
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Prabhudeva HM
(b)Designation (Owner/ Partner/ CEO) GMOperations
(c)Address Deepak Nitrite Ltd., Hyderabad Specialties Division, Unit-III,Plot No. 22, Phase-I, IDA Jeedimetla, Quthubullapur Mandal, Medchal Malkjgiri District, Telangana State,Quthbullapur,Rangareddi,Telangana-500055
(d)Pin code 500055
(e)E-mail kvenugopal@godeepak.com
(f)STD Code. 265(f)Telephone No. 23093533
(g)Fax No. 04023093588
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/IND2/95620/2018
(d)Master Proposal Number(Single Window) SW/95619/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 22
(b)Pincode 500055
(c)Bounded Latitudes (North)
From
Degree 17.31.23.24
Minutes
Second
From
Degree 17.31.24.69
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.26.50.52
Minutes
Second
From
Degree 78.26.51.59
Minutes
Second
(e)Survey of India Topo Sheet No. E44M6. E44M7, E44M10, E44M11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 573
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.9
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number SEIAA/TS/OL/MDCL-45/2018-1124
(b)Date of Apply of TOR 26 Jan 2018
(c)Date of Issue of TOR / Standard ToR 26 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is exempted from the process of Public Hea
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Area0.424 HaArea of the Plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Diamino Stilbene Di-Sulphonic Acid (DASDA) (OR) Aceto Amine Phenone5040Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 27 Jun 2016
(iv)Valid Upto 31 Jul 2021
(v)File No. TSPCB/10080/CFO/RR-II/HO/2016
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 17.59
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.123
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.46
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 48376
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 48376
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Para Nitro Toluene5303Tons per AnnumIndianRoad1100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube1241180
(2.)NOxMicro Gram per Meter Cube28102580
(3.)PM2.5Micro Gram per Meter Cube38163760
(4.)PM10Micro Gram per Meter Cube774376100
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l342010805002000
(3.)Fluoridemg/l1.060.8611.5
(4.)pHNA7.636.926.58.58.5
(5.)Total Hardnessmg/l1405217200600
(6.)Chloridesmg/l10861582501000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.577.01C
(2.)BODmg/l12010E
(3.)DOmg/l5.24.5C
(4.)CODmg/l262.645E
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))7250.675
(2.)Leq(Night)A-weighted decibels(dB(A))6441.870
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare387139
(2.)K(Potassium)Kilogram per hectare290140
(3.)P(Phosphorus)Kilogram per hectare9049
(4.)Electric ConductivityOthersmilli mhos/cm718150
(5.)pH7.846.1
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 11 To 13.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.2 To 9.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersHyderabad Metro Water Supply2550 Not Appliacble PipelineOthersSupply Pipeline2013-1-196803 May 2013500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Effluent1215Pre-treatmentOthersCETP-JETL012
(2.)Trade Effluent2130ETP-ZLDReuse within the Plant & Recycling21
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 33
(b)Total Discharged Water (Kilolitre per Day) 12
(c)Total Reused Water (Kilolitre per Day) 21
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Detoxified ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)240Tons50RoadOthersOutside Agencies
(2.)Boiler AshFly Ash2880Tons50RoadOthersBrick Manufacturers
(3.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3492Tons150RoadCo-Processing
(4.)Used Lead Acid BatteriesHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Kilolitre50RoadAuthorized Recyclers
(5.)Waste Mineral OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Kilolitre50RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube770.710.31577.4100
(2.)SO2Microgram per Meter Cube120.713.26415.380
(3.)NOxMicrogram per Meter Cube280.711.9863080
(4.)PM2.5Microgram per Meter Cube380.710.1438.260
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3 TPH Coal fired BoilerCoal300.4PM100.113
(2.)160 KVA DG SetDiesel70.15PM100.003
(3.)120 KVA DG SetDiesel70.15PM100.002
(4.)10 lakh Kcal/hr Thermic Fluid HeaterCoal300.2PM100.02
(5.)250 KVA DG SetDiesel80.2PM100.004
(6.)2 TPH BoilerCoal300.35PM100.075
(7.)160 KVA DG SetDiesel70.15PM100.003
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 700
(b)Source Telangana State Power Distribution Corporation
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 695 KVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.424
    Total Land (ha.) 0.424
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0.424
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 0.424
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.26304
(2.)Green belt0.10087
(3.)OthersRoads0.06032
Total (ha.) 0.42423
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0No CPA
(2.)WLSNA0No WLS
(3.)NPANA0No NPA
(4.)ESAsNA0No ESA
(5.)ESZsNA0No ESZs
(6.)CorridorsNA0No Corridors
(7.)Wildlife CorridorsNA0No Wild life corridors
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDulapalle RF1.03Rocky Knob
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsHakimpet Air force Station6.5Air Force Station
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.424
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not Applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Fox sagar (Kotta cheruvu)
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 1.9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 75
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 110
(e)No. of working days 365
(f)Total Manpower 185
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.10087
(b)Percentage of Total Project Area 23.79
(c)No. of Plants to be Planted 150
(d)Funds Allocated for Plantation 1
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalIndustry located in Notified industrial Area and proposing to increase in production capacity of existing product with ETP-ZLD for effluent handling and effective EMP with dedicated EHS cell.
(2.)FinancialProposed product provides tremendous potential of indigenous market as well as export market and the promotion of such projects will help in generation of foreign currency reserves for the country.
(3.)SocialProviding the local employment and infrastructure development as part of social development to the neighboring areas.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0035 dated 14-02-2017
(ii)Name of the EIA Consultant KKB Envirocare Consultants Private Limited
(iii)Address KKB Envirocare Consultants Pvt. Ltd., Tarun Plaza, 1st Floor, #3-5-244, NFC Main Road, Krishna Nagar Colony, Moula-Ali, Hyderabad – 500040, Telangana State
(iv)Mobile No. 9391013686
(v)Landline No. 7842047107
(vi)Email Id kkbenviro@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 06 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - As per the CTO dated 27/6/2016 (renewal of CFO & HWA dated 1/10/2015), industrial operations already exist/continuing at the project site. Accordingly, details of EC for the same and the compliance status thereof. - Report/findings of the sub-committee constituted by SEIAA Telangana vide ToR dated 26/4/2018. - Notification status for the IDA along with supporting documents. - Permission from the concerned regulatory authority for 255 cum/day of water supply. 23 Feb 2019
2.NAThe correction have been made as per the instruction received 26 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPrabhudeva HM
DesignationGMOperations
Name of Company (Applicant Name should not be given here)DEEPAK NITRITE LIMITED
AddressDeepak Nitrite Limited, 9/10. Kunj Society,