Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development Drilling of 24 Drill Sites, Commissioning of two GGS, Capacity expansion of existing M-GPP and laying of underground transportation Pipeline at onshore Block AAP-ON-94/1 Tinsukia District,
(b)Name of the Company / Organisation Hindustan Oil Exploration Company Ltd
(c)Registered Address Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, C,Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, C,Chennai,Lakshadweep-600018
(d)Legal Status of the Company Joint Venture(Pvt+Govt.)
(e)Joint Venture Yes
     1.1.         No. of JV Partners         2
S. No. Name of the JV PartnerShare of the JV Partner Address of the JV Partner Email Id of JV Partner Mobile No. of JV Partner
(1.)Oil India Limited44.086%OIL INDIA LIMITED, EASTERN ASSET MANNING, DULIAJAN, ASSAM-786602jppdas@oilindia.in 9435005611
(2.)Indian Oil Corporation Limited29.032%INDIAN OIL, 7TH FLOOR, INDIAN OIL BHAVAN, NO-1, SRI AUROBINDO MARG, YUSUF SARAI, NEW DELHI-110 016ashokkumar@indianoil.in 9873936005
2.
Address for the correspondence:
(a)Name of the Applicant Janakiraman Janakiraman Ganesan
(b)Designation (Owner/ Partner/ CEO) Head - HSE
(c)Address Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, Chennai - 600018,Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, Chennai - 600018,KandiVali,Chennai,Lakshadweep-600018
(d)Pin code 600018
(e)E-mail gjanakiraman@hoec.com
(f)STD Code. 44(f)Telephone No. 66229000
(g)Fax No. 04466229011
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity1(b) Offshore and onshore oil and gas exploration, development & production
(b)Category A
(c)Proposal Number IA/AS/IND2/95497/2014
(d)Master Proposal Number(Single Window) SW/95488/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 83 M/11
(b)Pincode 786181
(c)Bounded Latitudes (North)
From
Degree 271130.00
Minutes
Second
From
Degree 271854.99
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 952000
Minutes
Second
From
Degree 955655.92
Minutes
Second
(e)Survey of India Topo Sheet No. 83/M/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 160
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/246/2014-IA.II(I)
(b)Date of Apply of TOR 17 Sep 2014
(c)Date of Issue of TOR / Standard ToR 09 Dec 2014
(d)Date of Apply of EC 10 Dec 2015
(e)Date of Issue of EC 19 Jul 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason PH conducted during July 2015 for 2017 EC process.
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Shillong
(iii)Letter No. RONE/EIA/AS/OR/34/2132
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Sep 18 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Development Drilling62430OthersNumberRoad
(2.)GGS123OthersNumberPipe Conveyor
(3.)GPP202040OthersmmscfdPipe Conveyor
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)GGS123Group gather station
(2.)GPP20 mmscfd20 mmscfd40 mmscfdGas processing facility
(3.)Well62430Development wells
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 08 Aug 2018
(iv)Valid Upto 31 Mar 2019
(v)File No. WB/DIB/T-641/16-17/248
(vi)Application No. PCB/F50/TI/002674/03/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 552.33
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.66
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.53
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 11
(b)Existing quantity of raw material/fuel 6
(c)Total quantity of raw material/fuel 17
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD Fuel5OthersKL per day per wellLoaclRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube9.54.18.51880
(2.)NOxMicro Gram per Meter Cube34.210.228.580
(3.)PM10Micro Gram per Meter Cube992998100
(4.)PM2.5Micro Gram per Meter Cube581455.4860
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA7.26.48.58.5
(2.)Total Hardnessmg/l18880300600
(3.)Chloridesmg/l39142501000
(4.)Fluoridemg/l0.130.1111.5
(5.)TDSmg/l276905002000
(6.)TSSNA0000
(7.)Heavy MetalsCadmiummg/l0.00100.0030.003
(8.)OthersTotal ColiformOthersMPN/100 ml0000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersNA7.36.01A
(2.)CODmg/l1212A
(3.)OthersColiformOthersMPN/100ml160070B
(4.)DOmg/l7.86.0A
(5.)BODmg/l2.42.4A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.251.355
(2.)Leq(Night)A-weighted decibels(dB(A))44.139.445
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.544.58
(2.)P(Phosphorus)Milligram per Kilogram33
(3.)K(Potassium)Milligram per Kilogram148146
(4.)Electric ConductivityOthersµS/cm528137
(5.)N(Nitrogen)Milligram per Kilogram414157
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.2 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater500.5Copy of Permission LettermodeOthersTankerTube Well21-4/553/AS/IND/201822 Nov 201850
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water610STPDischarge into Surface Water Body6
(2.)Drilling waste water1420ETPDischarge into Surface Water Body14
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20
(b)Total Discharged Water (Kilolitre per Day) 20
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent MudIndustrial Waste120Tons0OthersDisposed in the lined pit within the siteOthersDisposed in the HDPE lined pit
(2.)Drill cuttingsIndustrial Waste3000Tons0OthersDisposed in the lined pit within the siteOthersDisposed in the HDPE lined pit
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube72.832.50.0139572.84395100
(2.)PM2.5Microgram per Meter Cube40.960040.960160
(3.)SO2Microgram per Meter Cube6.700.006.70180
(4.)NOxMicrogram per Meter Cube18.342.51.8864320.2264480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGHSD70.30PM100.007
(2.)DGHSD70.30NOx1.836
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2010
(b)Source DG set
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3x670 KVA
(e)Stack Height (in m) 7.0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 50
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 50
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 27.43
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2.90
(e)Settlements (ha.) 21.76
(f)Industrial (ha.) 0.79
(g)Forest (ha.) 203.52
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Tea garden, road 57.6
    Total (ha.) 314.00000000000006
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant50NA
Total (ha.) 50
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNo0Not falling in critically polluted area
(2.)WLSDehing Patkai Wildlife Sanctuary0.92No facilities located in the WLS
(3.)NPANo0No NPA
(4.)Wildlife CorridorsGolai-Powai Elephant Corridor0Proposed pipeline is passing through the elephant corridor
(5.)ESZsDehing Patkai Wildlife Sanctuary0.92Eco-sensitive zone has not been notified
(6.)CorridorsGolai-Powai Elephant Corridor8Proposed pipeline is passing through the elephant corridor
(7.)ESAsNo0No ESA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNo0Not falling in the study area
(2.)Archaeological SitesNo0No archaeological site
(3.)ForestUpper Dehing RF0.06Proposed drill sites are not falling the forest area
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species 12 schedule 1 species
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 50 lakh
(iii)Period of Implementation 2019-2023
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. FRW.14/2016/176
(iii)Date of issue 28 Feb 2017
(iv)Recommendation NA
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Buri Dehing River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 110
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.50.51
(2.)Percentage of Total Project Area101020
(3.)No. of Plants5005001000
(4.)Funds Allocated2.52.55
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThis expansion project will significantly increases the business opportunity among local people.
(2.)FinancialThis expansion project is of strategic importance to enhance gas production in the State of Assam and will carry mainly the Rich Gas produced in the Dirok field for supply to Brahmaputra Cracker and Polymer Limited (BCPL). This project will benefit multiple industrial units that require additional gas in the State
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0055
(ii)Name of the EIA Consultant ERM India Private Limited
(iii)Address Building 10. Tower A, 4th Floor, DLF Cyber City, Gurgaon 122002
(iv)Mobile No. 0981006816
(v)Landline No. 0124417030
(vi)Email Id subir.gupta@erm.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Last public hearing dated 3/7/2015 is for different scope of the project. Moreover, the same is more than three years old and thus not acceptable as per the extant norms/guidelines in this regard. - As stated in column 7(a) of Form-2, public hearing for the proposed project was never exempted by the Ministry. Your version is factually incorrect. - Dehing Patkai WLS being within 10 km from the project site, status of wildlife clearance from the Standing Committee of NBWL. - Covering letter dated 27/6/2018 is too old. 23 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJanakiraman Janakiraman Ganesan
DesignationHead - HSE
Name of Company (Applicant Name should not be given here)Hindustan Oil Exploration Company Ltd
Address"HOEC House" Tandaljia Road, Vadodara -390020, Gujarat
Print