1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Development Drilling of 24 Drill Sites, Commissioning of two GGS, Capacity expansion of existing M-GPP and laying of underground transportation Pipeline at onshore Block AAP-ON-94/1 Tinsukia District, | (b)Name of the Company / Organisation | Hindustan Oil Exploration Company Ltd | (c)Registered Address | Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, C,Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, C,Chennai,Lakshadweep-600018 | (d)Legal Status of the Company | Joint Venture(Pvt+Govt.) | (e)Joint Venture | Yes | |
|
1.1. No. of JV Partners 2 |
---|
S. No. | Name of the JV Partner | Share of the JV Partner | Address of the JV Partner | Email Id of JV Partner | Mobile No. of JV Partner |
---|
(1.) | Oil India Limited | 44.086% | OIL INDIA LIMITED, EASTERN ASSET MANNING, DULIAJAN, ASSAM-786602 | jppdas@oilindia.in | 9435005611 | (2.) | Indian Oil Corporation Limited | 29.032% | INDIAN OIL, 7TH FLOOR, INDIAN OIL BHAVAN, NO-1, SRI AUROBINDO MARG, YUSUF SARAI, NEW DELHI-110 016 | ashokkumar@indianoil.in | 9873936005 | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Janakiraman Janakiraman Ganesan | (b)Designation (Owner/ Partner/ CEO) | Head - HSE | (c)Address | Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, Chennai - 600018,Lakshmi Chambers, 192, St.Mary's Road, Alwarpet, Chennai - 600018,KandiVali,Chennai,Lakshadweep-600018 | (d)Pin code | 600018 | (e)E-mail | gjanakiraman@hoec.com | (f)STD Code. | 44(f)Telephone No. | 66229000 | (g)Fax No. | 04466229011 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| Minor Activity | 1(b) Offshore and onshore oil and gas exploration, development & production
| (b)Category | A | (c)Proposal Number | IA/AS/IND2/95497/2014 | (d)Master Proposal Number(Single Window) | SW/95488/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 83 M/11 | (b)Pincode | 786181 | (c)Bounded Latitudes (North) | | From | | Degree | 271130.00 | Minutes | | Second | | From | | Degree | 271854.99 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 952000 | Minutes | | Second | | From | | Degree | 955655.92 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 83/M/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 160 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1 | (j)Seismic Zone | 5 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Assam | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/246/2014-IA.II(I) | (b)Date of Apply of TOR | 17 Sep 2014 | (c)Date of Issue of TOR / Standard ToR | 09 Dec 2014 | (d)Date of Apply of EC | 10 Dec 2015 | (e)Date of Issue of EC | 19 Jul 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | PH conducted during July 2015 for 2017 EC process. | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Shillong | (iii)Letter No. | RONE/EIA/AS/OR/34/2132 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 18 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Development Drilling | 6 | 24 | 30 | Others | Number | Road | | (2.) | GGS | 1 | 2 | 3 | Others | Number | Pipe Conveyor | | (3.) | GPP | 20 | 20 | 40 | Others | mmscfd | Pipe Conveyor | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | GGS | 1 | 2 | 3 | Group gather station | (2.) | GPP | 20 mmscfd | 20 mmscfd | 40 mmscfd | Gas processing facility | (3.) | Well | 6 | 24 | 30 | Development wells | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 08 Aug 2018 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | WB/DIB/T-641/16-17/248 | (vi)Application No. | PCB/F50/TI/002674/03/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 552.33 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.66 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.53 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | c)Notified Eco-sensitive areas | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 11 | (b)Existing quantity of raw material/fuel | 6 | (c)Total quantity of raw material/fuel | 17 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD Fuel | 5 | Others | KL per day per well | Loacl | Road | | 20 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 9.5 | 4.1 | 8.518 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 34.2 | 10.2 | 28.5 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 99 | 29 | 98 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 58 | 14 | 55.48 | 60 | |
14.2. No. of Ground Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | NA | 7.2 | 6.4 | 8.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 188 | 80 | 300 | 600 | (3.) | Chlorides | | | mg/l | | 39 | 14 | 250 | 1000 | (4.) | Fluoride | | | mg/l | | 0.13 | 0.11 | 1 | 1.5 | (5.) | TDS | | | mg/l | | 276 | 90 | 500 | 2000 | (6.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (7.) | Heavy Metals | | Cadmium | mg/l | | 0.001 | 0 | 0.003 | 0.003 | (8.) | Others | Total Coliform | | Others | MPN/100 ml | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | NA | 7.3 | 6.01 | A | (2.) | COD | | mg/l | | 12 | 12 | A | (3.) | Others | Coliform | Others | MPN/100ml | 1600 | 70 | B | (4.) | DO | | mg/l | | 7.8 | 6.0 | A | (5.) | BOD | | mg/l | | 2.4 | 2.4 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.2 | 51.3 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.1 | 39.4 | 45 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 6.54 | 4.58 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 3 | 3 | (3.) | K(Potassium) | Milligram per Kilogram | | 148 | 146 | (4.) | Electric Conductivity | Others | µS/cm | 528 | 137 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 414 | 157 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.2 To 2 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 50 | 0.5 | Copy of Permission Letter | modeOthers | Tanker | Tube Well | | 21-4/553/AS/IND/2018 | 22 Nov 2018 | 50 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic waste water | 6 | 10 | STP | Discharge into Surface Water Body | | | 6 | (2.) | Drilling waste water | 14 | 20 | ETP | Discharge into Surface Water Body | | | 14 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 20 | (b)Total Discharged Water (Kilolitre per Day) | 20 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Spent Mud | Industrial Waste | | 120 | Tons | 0 | Others | Disposed in the lined pit within the site | Others | Disposed in the HDPE lined pit | (2.) | Drill cuttings | Industrial Waste | | 3000 | Tons | 0 | Others | Disposed in the lined pit within the site | Others | Disposed in the HDPE lined pit | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 72.83 | 2.5 | 0.01395 | 72.84395 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 40.96 | 0 | 0 | 40.9601 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 6.7 | 0 | 0.00 | 6.701 | 80 | (4.) | NOx | | Microgram per Meter Cube | 18.34 | 2.5 | 1.88643 | 20.22644 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG | HSD | 7 | 0.30 | PM10 | | 0.007 | (2.) | DG | HSD | 7 | 0.30 | NOx | | 1.836 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2010 | (b)Source | DG set | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 3x670 KVA | (e)Stack Height (in m) | 7.0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 50 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 50 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 27.43 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2.90 | (e)Settlements (ha.) | 21.76 | (f)Industrial (ha.) | 0.79 | (g)Forest (ha.) | 203.52 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Tea garden, road | 57.6 | Total (ha.) | 314.00000000000006 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 50 | NA | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | No | 0 | Not falling in critically polluted area | (2.) | WLS | Dehing Patkai Wildlife Sanctuary | 0.92 | No facilities located in the WLS | (3.) | NPA | No | 0 | No NPA | (4.) | Wildlife Corridors | Golai-Powai Elephant Corridor | 0 | Proposed pipeline is passing through the elephant corridor | (5.) | ESZs | Dehing Patkai Wildlife Sanctuary | 0.92 | Eco-sensitive zone has not been notified | (6.) | Corridors | Golai-Powai Elephant Corridor | 8 | Proposed pipeline is passing through the elephant corridor | (7.) | ESAs | No | 0 | No ESA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | No | 0 | Not falling in the study area | (2.) | Archaeological Sites | | No | 0 | No archaeological site | (3.) | Forest | | Upper Dehing RF | 0.06 | Proposed drill sites are not falling the forest area | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 12 schedule 1 species | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 50 lakh | (iii)Period of Implementation | 2019-2023 | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | FRW.14/2016/176 | (iii)Date of issue | 28 Feb 2017 | (iv)Recommendation | NA | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Buri Dehing River | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 1.2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 60 | (c)Temporary Employment- During Construction | 50 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 110 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.5 | 0.5 | 1 | (2.) | Percentage of Total Project Area | 10 | 10 | 20 | (3.) | No. of Plants | 500 | 500 | 1000 | (4.) | Funds Allocated | 2.5 | 2.5 | 5 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | This expansion project will significantly increases the business opportunity among local people. | (2.) | Financial | This expansion project is of strategic importance to enhance gas production in the State of Assam and will carry mainly the Rich Gas produced in the Dirok field for supply to Brahmaputra Cracker and Polymer Limited (BCPL). This project will benefit multiple industrial units that require additional gas in the State | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0055 | (ii)Name of the EIA Consultant | ERM India Private Limited | (iii)Address | Building 10. Tower A, 4th Floor, DLF Cyber City, Gurgaon 122002 | (iv)Mobile No. | 0981006816 | (v)Landline No. | 0124417030 | (vi)Email Id | subir.gupta@erm.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 31 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Last public hearing dated 3/7/2015 is for different scope of the project. Moreover, the same is more than three years old and thus not acceptable as per the extant norms/guidelines in this regard.
- As stated in column 7(a) of Form-2, public hearing for the proposed project was never exempted by the Ministry. Your version is factually incorrect.
- Dehing Patkai WLS being within 10 km from the project site, status of wildlife clearance from the Standing Committee of NBWL.
- Covering letter dated 27/6/2018 is too old. | 23 Feb 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Janakiraman Janakiraman Ganesan | Designation | Head - HSE | Name of Company (Applicant Name should not be given here) | Hindustan Oil Exploration Company Ltd | Address | "HOEC House" Tandaljia Road,
Vadodara -390020, Gujarat |
|