Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Augmentation of Acid slurry (LABSA) from 10 TPD to 160 TPD and Spent Sulphuric Acid (Weak Sulphuric Acid) Production capacity from 10 TPD to 110 TPD
(b)Name of the Company / Organisation NEW INDIA ASSOCIATES
(c)Registered Address R.S. No. 63/3, Mangalam Village, Villianur Commune, Pondicherry,,Pondicherry,Puducherry-605110
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Nimesh Patel
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address R.S.No. 63/3, Mangalam Village, Villianur Commune, Pondicherry,605110,Villianur Commune Panchayat,Pondicherry,Puducherry-605110
(d)Pin code 605110
(e)E-mail info@newindiapondy.com
(f)STD Code. 413(f)Telephone No. 2667701
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/PY/IND2/95298/2019
(d)Master Proposal Number(Single Window) SW/95297/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. R.S. No. 63/3
(b)Pincode 605110
(c)Bounded Latitudes (North)
From
Degree 11.895965
Minutes
Second
From
Degree 11.896681
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 79.739591
Minutes
Second
From
Degree 79.740780
Minutes
Second
(e)Survey of India Topo Sheet No. 59 M/9, M/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 10
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Puducherry
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number Nil
(b)Date of Apply of TOR 11 Feb 2019
(c)Date of Issue of TOR / Standard ToR 11 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since it is a B2 category, Public hearing is not a
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Storage TankExisting-6 and Proposed -2
(2.)separatorExisting-1 and Proposed -1
(3.)Acid dossersExisting-4 and Proposed -0
(4.)LAB dossersExisting-4 and Proposed -0
(5.)DilutorsExisting-0 and Proposed -4
(6.)ReactorsExisting-4 and Proposed -0
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Acid Slurry160OthersTones/DayRoad
(2.)Spent Sulphuric Acid110OthersTones/DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 23 Nov 2018
(iv)Valid Upto 31 Mar 2021
(v)File No. 4225/PPCC/CON/AIR/VCP/JE-I/2018/1063
(vi)Application No. -
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.05
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.01
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 2
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fuel oil Diesel Generator (GHSD)200Otherslitres/monthLocalRoad5 Open MarketCopy of Linkage
(2.)linear alkyl benzene (LAB)110OthersTons/DayTPL ChennaiRoad165 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2019 To 31 Jan 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube74.9735.9074.5100
(2.)SO2Micro Gram per Meter Cube14.395.3414.380
(3.)NOxMicro Gram per Meter Cube35.8115.3635.680
(4.)PM2.5Micro Gram per Meter Cube36.8917.0336.760
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l1381052501000
(2.)Heavy MetalsZincmg/l0.0330.012512
(3.)Fluoridemg/l0.650.4411.5
(4.)pHNA8.226.986.58.5
(5.)TDSmg/l2311565002000
(6.)TSSmg/l11100100
(7.)Total Hardnessmg/l307185200600
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.087.54A
(2.)CODmg/l4.54A
(3.)BODmg/l2.11.4B
(4.)DOmg/l6.55.9B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))644975
(2.)Leq(Night)A-weighted decibels(dB(A))604070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.27.2
(2.)Electric ConductivityOthersumhos/cm533250
(3.)P(Phosphorus)Kilogram per hectare4729
(4.)K(Potassium)Kilogram per hectare183128
(5.)N(Nitrogen)Kilogram per hectare8239
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater200.15Copy of Permission LetterPipelineOthersBore wellnil08 Mar 20195
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage0.30.3Septic tankOthersSeptic Tnak00.3
(2.)Wash water0.21ETPOthersETP Plant0.20
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.5
(b)Total Discharged Water (Kilolitre per Day) 0.3
(c)Total Reused Water (Kilolitre per Day) 0.2
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Used or Spent OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.1Tons0.15RoadOthersUsed as lubricant in plant machineries
(2.)Organic WasteMunicipal Solid Waste1.522Tons1.5RoadOthersDisposed to municipal bins
(3.)Inorganic wasteMunicipal Solid Waste2.29Tons3RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube36.890036.9060
(2.)SO2Microgram per Meter Cube14.390014.4080
(3.)PM10Microgram per Meter Cube74.970074.98100
(4.)NOxMicrogram per Meter Cube35.810035.8280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)82.5 kVAHSD50.1NOx2.27 E-02
(2.)8.25 kVAHSD50.1SO22.44 E-02
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 12053
(b)Source Electricity department of Pondicherry
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 82.5 kVA (1 No)
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.4573
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.4573
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 21745
(b)Waste/Barren Land (ha.) 918
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2370
(e)Settlements (ha.) 5922
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 277
(j)Others (ha.) : Coastal wetland 247
    Total (ha.) 31479
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.4573Total Plant area
Total (ha.) 0.4573
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSOussudu lake wildlife sanctuary4.86N
(2.)Critically Polluted AreaNil0Nil
(3.)CorridorsNil0Nil
(4.)Wildlife CorridorsNil0Nil
(5.)NPANil0Nil
(6.)ESAsNil0Nil
(7.)ESZsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0Nil
(2.)Archaeological SitesNil0Nil
(3.)Defence InstallationsNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Oussudu Lake
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4.86
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 28
(e)No. of working days 302
(f)Total Manpower 28
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.151
(b)Percentage of Total Project Area 33.02
(c)No. of Plants to be Planted 235
(d)Funds Allocated for Plantation 7
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialJobs to local peoples
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0083
(ii)Name of the EIA Consultant Hubert Enviro Care system Pvt Ltd
(iii)Address Hubert Enviro Care Systems (P) Ltd. A-21, (Behind Lions Club School) III Phase, Thiru Vi Ka Industrial Estate. Guindy, Chennai - 600 032. Ph: 044-43635555
(iv)Mobile No. 9884390811
(v)Landline No. 0444363555
(vi)Email Id moses@hecs.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 13 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Whether the proposed industrial operations would be in conformity with permitted land use of the area. This needs to be clarified along with supporting documents. - EC status for the present LABSA production of 10 TPD, and the compliance status thereof. - Applicability of the EIA Notification, 2006 for manufacturing Spent Suphuric Acid. - Status of Wildlife Clearance in view of Ossudu Lake WLS at 4.86 km from the project site. - Permission from the concerned regulatory authority for ground water withdrawal of 20 cum/day. 17 Feb 2019
2.NAThe correction have been made as per the instruction received 19 Feb 2019
3.NAPlease see our earlier observations dated 17/2/2019. To take the proposal forward, inputs/clarification are required in r/o the following:- - Supporting documents showing commencement of LABSA production prior to September, 2006. - Applicability of EIA Notification, 2006 for spent Sulphuric Acid. - Proposal to be submitted for Wildlife clearance from the Standing Committee of NBWL. - Proposal to be submitted to seek permission for ground water withdrawal of 20 cum/day. 02 Mar 2019
4.NAThe correction have been made as per the instruction received 26 Mar 2019
5.NAApplicability of the EIA Notification, 2006 for manufacturing spent Sulphuric Acid @110 TPD needs to be examined again and confirmed along with supporting documents. 31 Mar 2019
6.NAThe correction have been made as per the instruction received 24 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNimesh Patel
DesignationDGM
Name of Company (Applicant Name should not be given here)NEW INDIA ASSOCIATES
AddressR.S. No. 63/3, Mangalam Village, Villianur Commune, Pondicherry
Print