1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Chemfab Alkalis Limited (Survey Nos. 129/1, 129/2, 130/1A, 130/2A, 104 Part, 105/1, 209/1B, 209/2B, 209/3B, 210/1A, 210/2A, 210/3A, 210/1B, 210/2B, 210/3B, 214/1A, 214/1B, 214/2A, 214/4, 21 | (b)Name of the Company / Organisation | M/S CHEMFAB ALKALIS LIMITED | (c)Registered Address | Gnanananda Place, Kalapet, Pondicherry,,Pondicherry,Puducherry-605014 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Raguraman VR | (b)Designation (Owner/ Partner/ CEO) | VP | (c)Address | Chemfab Alkalis Limited , Team House, GST Road,,Vandalur, Chennai,Chengalpattu,Kanchipuram,Tamil Nadu-600048 | (d)Pin code | 600048 | (e)E-mail | vrr@drraoholdings.com | (f)STD Code. | 413(f)Telephone No. | 2655111 | (g)Fax No. | 2655125 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(d) Chlor-alkali industry
| Minor Activity | | (b)Category | B2 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/PY/IND2/95155/2019 | (d)Master Proposal Number(Single Window) | SW/95154/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | M/s Chemfab Alkalis Limited Survey Nos. 129/1, 129 | (b)Pincode | 605014 | (c)Bounded Latitudes (North) | | From | | Degree | 12.024544 | Minutes | | Second | | From | | Degree | 12.029300 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.8573805 | Minutes | | Second | | From | | Degree | 79.858800 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57P/16 & 58 M/13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 21 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Puducherry | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/371/2007-IA-II (I) | (c)Date of Issue of TOR | 09 Feb 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 08 May 2019 | (c)Date of Issue of EC | 27 Aug 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Since it is a B2 project, public hearing is not ap | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | F.No: EP/12.1/01/2015/PY | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 15 2015 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | HCL | 50 | 100 | 150 | Tons per Annum(TPA) | | Road | | (2.) | Caustic soda | 125 | 75 | 200 | Tons per Annum(TPA) | | Road | | (3.) | sodium hypochlorite | 8 | 4 | 12 | Tons per Annum(TPA) | | Road | | (4.) | Barium/sodium sulphate | 1.2 | 0.8 | 2 | Tons per Annum(TPA) | | Road | | (5.) | soda ash | 4 | 0 | 4 | Tons per Annum(TPA) | | Road | | (6.) | sodium sulphate | 0 | 8 | 8 | Tons per Annum(TPA) | | Road | | (7.) | chlorine | 111 | 65 | 176 | Tons per Annum(TPA) | | Road | | (8.) | Hydrogen (bottled) | 11500 | 6500 | 18000 | Others | NM3/Annum | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Flaker Molten salt heater | 2.69 Million Kcal/hr | Nil | 2.69 Million Kcal/hr | No change | (2.) | Furnace Oil and /or Hydrogen fired Boiler | 1x6 TPH | Nil | 1x6 TPH | No change | (3.) | Thermic Fluid Heater | 2.0 Million Kcal/hr | Nil | 2.0 Million Kcal/hr | No change | (4.) | Furnace Oil Fired Boiler | 1x2 TPH | Nil | 1x2 TPH | No change | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 14 Dec 2018 | (iv)Valid Upto | 31 Mar 2019 | (v)File No. | 1844/PPCC/CON/AIR/OM-KPT/JE-II/2018/1162 | (vi)Application No. | - | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 60 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 7.17 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.4216 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | Yes | 8.(a) | If any Industrial Estate/Complex / Export processing Zones /Special Economic Zones/Biotech Parks / Leather Complex with homogeneous type of industries such as Items 4(d), 4(f), 5(e), 5(f), or those Industrial estates with pre –defined set of activities (not necessarily homogeneous, obtains prior environmental clearance, individual industries including proposed industrial housing within such estates /complexes will not be required to take prior environmental clearance, so long as the Terms and Conditions for the industrial estate/complex are complied with (Such estates/complexes must have a clearly identified management with the legal responsibility of ensuring adherence to the Terms and Conditions of prior environmental clearance, who may be held responsible for violation of the same throughout the life of the complex/estate | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 10 | (c)Total quantity of raw material/fuel | 10 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | diesel | 0.65 | Kilo Litre per Day | | Local | Road | | 5 | Open Market | | Copy of Linkage | (2.) | Eight raw materials | 385.9 | Others | Mt/day | Local | Road | | 35 | Open Market | | Copy of Linkage | (3.) | Hydrogen | 54000 | Others | Nm3/day | Local | Road | | 35 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jul 2018 To 31 Jul 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 78.6 | 62.3 | 74.6 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 21.3 | 8.2 | 20.1 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 30.4 | 11.3 | 29.5 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 36.4 | 11.3 | 25.0 | 60 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 1 | 1 | 100 | 100 | (2.) | TDS | | | mg/l | | 1181 | 462 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 501.34 | 123.06 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 289 | 136 | 250 | 1000 | (5.) | pH | | | NA | | 7.74 | 6.98 | 6.5 | 8.5 | (6.) | Fluoride | | | mg/l | | 1.5 | 1 | 1 | 1.5 | (7.) | Heavy Metals | | Zinc | mg/l | | 4.54 | 1.06 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 27 | 4.8 | E | (2.) | DO | | mg/l | | 6.5 | 5.5 | B | (3.) | BOD | | mg/l | | 12.7 | 2.3 | E | (4.) | pH | | NA | | 8.01 | 7.35 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 60.8 | 51.1 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.2 | 44.3 | 65 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 117 | 73 | (2.) | pH | | | 8.15 | 6.96 | (3.) | P(Phosphorus) | Kilogram per hectare | | 79 | 47 | (4.) | N(Nitrogen) | Kilogram per hectare | | 125 | 67 | (5.) | Electric Conductivity | Others | µS/cm | 714 | 101 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30.5 To 4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 29.5 To 3 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 502 | 0.017 | Copy of Permission Letter | Pipeline | | Others | Dug well | P-02-20-01-01639/PGWA/S11/RENEWAL/2015-16 | 16 Mar 2016 | 490 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 2000 | (c)Quantity of Brine (KLD) | 9000 | (d)Mode of Disposal of Brine | Marine outfall | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | washing | 12 | 12 | ETP | Others | ZLD | 0 | 12 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 12 | (b)Total Discharged Water (Kilolitre per Day) | 12 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Oil waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1 | Tons | 0.5 | Road | | Authorized Recyclers | | (2.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6.0 | Tons | 5 | Road | | Authorized Recyclers | | (3.) | Paper/Cardboard waste | Municipal Solid Waste | | 3 | Tons | 0.05 | Road | | Authorized Recyclers | | (4.) | Brine Mud | Municipal Solid Waste | | 4400 | Tons | 0.05 | Road | | Others | used for salt field embarkment purpose | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 78.6 | 0 | 0.1 | 78.7 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 21.3 | 0 | 0 | 21.31 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 35.4 | 0 | 0 | 35.41 | 60 | (4.) | NOx | | Microgram per Meter Cube | 30.4 | 0 | 0 | 30.41 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boilers | 1x2 MT/hr | 33 | 0.5 | Others | Gaseous discharge | 2286 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 25000 | (b)Source | Pondicherry Electricity Department | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | There is no standby. DG of capacity 1 x 380 kVA & | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 14.778 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 14.778 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 12489 | (b)Waste/Barren Land (ha.) | 321 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 5889 | (e)Settlements (ha.) | 1946.33 | (f)Industrial (ha.) | 5.67 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 11737 | (j)Others (ha.) : sandy | 512 | Total (ha.) | 32900 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 14.778 | Total Plant | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | Nil | 0 | Nil | (2.) | ESZs | Nil | 0 | Nil | (3.) | Corridors | Nil | 0 | Nil | (4.) | Wildlife Corridors | Nil | 0 | Nil | (5.) | Critically Polluted Area | Nil | 0 | Nil | (6.) | ESAs | Nil | 0 | Nil | (7.) | WLS | Nil | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Kumalumpatti RF | 14.36 | NW | (2.) | Archaeological Sites | | Nil | 0 | Nil | (3.) | Defence Installations | | Nil | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Unnamed Nullah flowing inside the project area | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kuliveli Lake | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 4.26 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 240 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 160 | (e)No. of working days | 365 | (f)Total Manpower | 400 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 9.505 | 0 | 9.505 | (2.) | Percentage of Total Project Area | 64.32 | 0 | 64.32 | (3.) | No. of Plants | 43296 | 0 | 43296 | (4.) | Funds Allocated | 0 | 0 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | NGT | (c)Name of the Sub Court | NGT Delhi | (d)Case No. | 508/2014 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | We wish to mention that, on 29.01.2019, the Hon’bl | (f)Case Details | (Copy of the order) enclosed as Annexure 8. | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 051 | (ii)Name of the EIA Consultant | ECO CHEM SALES AND SERVICES, GUJARAT | (iii)Address | Eco chem. Sales and Services Ashoka Pavillion – A opp. Kapadia Health Club, New Civil Road, Surat - 395001 | (iv)Mobile No. | 9227934111 | (v)Landline No. | 0261223163 | (vi)Email Id | eco@ecoshripad.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 03 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please clarify categorization of the project/activity vis-a-vis the schedule to the EIA Notification, 2006 and the applicability of general/specific conditions along with the supporting documents. | 13 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 15 Feb 2019 | 3. | NA | Puducherry-Tamil Nadu boundary not being the inter-state, general conditions are not applicable to the project. | 24 Feb 2019 | 4. | NA | The correction have been made as per the instruction received | 27 Feb 2019 | 5. | NA | The proposal has to be in compliance of the NGT Order dated 29/1/2019 in OA No.89/2014. Please ensure the same. | 03 Mar 2019 | 6. | NA | The correction have been made as per the instruction received | 10 Apr 2019 | 7. | NA | NGT Order dated 29/1/2019 does not mention about EC from the concerned regulatory authority. There being no clarity, the proposal needs to be discussed with us in the Ministry along with the earlier ECs dated 16/8/2007 & 31/10/2016. | 19 Apr 2019 | 8. | NA | The correction have been made as per the instruction received | 08 May 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Chemfab Alkalis Limited reply for Additional details sought (ADS) by MoEF&CC dated:16.07.2020 | 04 Aug 2020 | 2. | NA | Please submit the latest status of compliance of existing environmental clearance conditions and provide the website link of the company wherein the latest six monthly compliance report is uploaded. | 16 Jul 2020 | 3. | ADS Reply Letter | Submission of query reply report for the Additional Detail sought by MoEF&CC during 9th EAC meeting held on 26.06.2019. | 11 May 2020 | 4. | NA | |
|