Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Development Drilling wells and Testing of Hydrocarbons in Dipling, Sarojini and Saekhati Block in Sivasagar and Dibrugarh District Assam By M/s. Ramayana Ispat Pvt. Ltd.
(b)Name of the Company / Organisation RAMAYANA ISPAT PVT LTD
(c)Registered Address M-163, LOWER GROUND FLOOR, GK-II, NEW DELHI-110048,,South,Delhi-110048
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant PIYUSH GUPTA
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address M-163, LOWER GROUND FLOOR, GK-II, NEW DELHI-110048,,Defence Colony,South,Delhi-110048
(d)Pin code 110048
(e)E-mail bocindia2017@gmail.com
(f)STD Code. 11(f)Telephone No. 45689388
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(b) Offshore and onshore oil and gas exploration, development & production
Minor Activity
(b)Category A
(c)Proposal Number IA/AS/IND2/71519/2017
(d)Master Proposal Number(Single Window) SW/94869/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. not applicable
(b)Pincode 785692
(c)Bounded Latitudes (North)
From
Degree 27.5
Minutes
Second
From
Degree 27.7
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 94.58
Minutes
Second
From
Degree 95.08
Minutes
Second
(e)Survey of India Topo Sheet No. G46F03, G46F08, G46F04, G46E16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 528
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 3
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Assam
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamDibrugarhMoran
(2.)AssamSibsagarAmguri
(3.)Uttar PradeshSonbhadraDudhiChilkatand, Khadia
(4.)Madhya PradeshSingrouliSingrauliKaruwaari, Dudhichua, Churideh, Panjreh, Madhouli
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/564/2017-IA-II(I)
(b)Date of Apply of TOR 09 Dec 2017
(c)Date of Issue of TOR / Standard ToR 25 Jan 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :08 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :2
Sapekhati Tai Cultural Centre, Sapekhati, Dist-Charaideo, Assam
State :Assam
District :Sibsagar
Tehsil :Amguri
Village :Sapekhati
40employment for local peopleOthersAdditional Deputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Drilling rig equipment1200 GPM
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)37.5 Ha (2.5 Ha for each well)15HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 225
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.8
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 4.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)FUEL6Kilo Litre per DayLOCALRoad5 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 18 Dec 2017 To 09 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 13
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube50.123.649.2100
(2.)SO2Micro Gram per Meter Cube6.85.06.880
(3.)PM2.5Micro Gram per Meter Cube24.813.524.360
(4.)NOxMicro Gram per Meter Cube13.66.513.480
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.75.856.58.5
(2.)Total Hardnessmg/l16424200600
(3.)TSSmg/l0000
(4.)TDSmg/l212575002000
(5.)Chloridesmg/l4442501000
(6.)Fluoridemg/l0.580.111.5
(7.)Heavy MetalsLeadmg/l0.0010.0010.010.01
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.747.55C
(2.)DOmg/l5.84.5C
(3.)BODmg/l2.82C
(4.)OthersNitratemg/l2.31.5C
(5.)CODmg/l148C
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))49.341.155
(2.)Leq(Night)A-weighted decibels(dB(A))43.535.445
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH6.325.19
(2.)N(Nitrogen)Kilogram per hectare512287
(3.)Electric ConductivityMillisiemens per Centimetre0.1920.041
(4.)P(Phosphorus)Kilogram per hectare63.919.6
(5.)K(Potassium)Kilogram per hectare15674
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker supply255Copy of Permission LettermodeOthersTankerOtherstankerxyz01 Feb 201925
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic wastewater45modular STPOtherssoak pit31
(2.)drilling & rig wash4.55mobile ETPReuse within the Plant & Recycling4.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8.5
(b)Total Discharged Water (Kilolitre per Day) 1
(c)Total Reused Water (Kilolitre per Day) 7.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)drill cuttingsIndustrial Waste250Tons1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube50.10.080.0350.14100
(2.)PM2.5Microgram per Meter Cube24.80.080.0324.8460
(3.)NOxMicrogram per Meter Cube13.60.080.11713.7380
(4.)SO2Microgram per Meter Cube6.80.080.0586.8780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setHSD160.4SO20.139
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1430
(b)Source DG sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1430 KVA
(e)Stack Height (in m) 16
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 3.06
(b)Private Land (ha.) 34.44
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 37.5
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 19712.68
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 1813.11
(d)Surface Water Bodies (ha.) 2636.52
(e)Settlements (ha.) 1824.28
(f)Industrial (ha.) 0
(g)Forest (ha.) 2312.68
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Road & Rail network 3294.76
    Total (ha.) 31594.03
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.8
(2.)Green belt0.7
Total (ha.) 2.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Not applicable
(2.)Wildlife CorridorsNil0Not applicable
(3.)WLSNil0Not applicable
(4.)ESZsNil0Not applicable
(5.)CorridorsNil0Not applicable
(6.)NPANil0Not applicable
(7.)ESAsNil0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0Not applicable
(2.)Defence InstallationsNil0Not applicable
(3.)ForestDiroi Reserve Forest2Reserve Forest within Dipling block area
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Reserved
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.5
(b)Land yet to be acquired(Ha) 35
(c)Status of Land acquisition if not acquired Ongoing, Drilling location will be decided based o
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Dirol Nadi
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Buri Dihing River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 7.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 40
(e)No. of working days 300
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Total Area of Green Belt 12.375
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 50000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Socialemployment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0048
(ii)Name of the EIA Consultant ABC Techno Labs India Pvt. Ltd.
(iii)Address 400, 13th Street, SIDCO Industrial Estate (North Phase) Ambattur – 600 098
(iv)Mobile No. 8420642002
(v)Landline No. 0442616112
(vi)Email Id abc@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - As per the EIA/EMP report, project is covered under two districts namely, Sibsagar and Dibrugarh. But the public hearing has been conducted in Charaideo District. This needs to be clarified. - Many of the wells are proposed in forest areas, requiring diversion of forest land. Please inform present status of stage-I forest clearance. 16 Feb 2019
2.NAThe correction have been made as per the instruction received 11 Mar 2019
3.NAYour reply in respect of public hearing for the project in Charaideo District only, needs to be endorsed by the State Pollution Control Board. 30 Mar 2019
4.NAThe correction have been made as per the instruction received 10 Apr 2019
5.NAOur observations dated 16/2/2019 for public hearing conducted in District Charaideo only, and diversion of forest area involved under the project, are yet to be resolved. For better understanding, the matter may be discussed with us in the Ministry. 14 Apr 2019
6.NAThe correction have been made as per the instruction received 03 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPIYUSH GUPTA
DesignationDirector
Name of Company (Applicant Name should not be given here)RAMAYANA ISPAT PVT LTD
AddressM-163, LOWER GROUND FLOOR, GK-II, NEW DELHI-110048
Print