1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Actero Pharma Pvt. Ltd. | (b)Name of the Company / Organisation | HONOUR INFRAESTATES LTD | (c)Registered Address | chanakya puri,chanakya puri new delhi,New Delhi,Karnataka-281203 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Mohan Reddy C | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Hetero Corporate Office,
7-2-A2, Industrial Estates, Sanath Nagar,,Ameerpet,Hyderabad,Telangana-500018 | (d)Pin code | 500018 | (e)E-mail | jagadeeswar.v@heterodrugs.com | (f)STD Code. | 40(f)Telephone No. | 12345678 | (g)Fax No. | 23700405 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TG/IND2/62657/2017 | (d)Master Proposal Number(Single Window) | SW/94782/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy. No 407 (Part) and 411, Veliminedu (V), Chityal | (b)Pincode | 508114 | (c)Bounded Latitudes (North) | | From | | Degree | 17.133021 | Minutes | | Second | | From | | Degree | 17.133967 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 79.23445 | Minutes | | Second | | From | | Degree | 79.24278 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E44M15, E44M16, E44N3 and E44N4 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 334 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 290 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Nalgonda | Chityala | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/59/2017-IA-II(I) | (b)Date of Apply of TOR | 22 Feb 2017 | (c)Date of Issue of TOR / Standard ToR | 26 May 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At Project Site | State : | Telangana | District : | Nalgonda | Tehsil : | Narketpalle | Village : | Veliminedu |
| 450 | Employement
Water Pollution
Odor Nusiance
Village Development | Others | Joint Collector & Addl. District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Bulk Drug and Intermediates Manufacturing Unit | 165 TPM Capacity | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Bulk Drug and Intermediates | 165 | Others | Tons Per Month | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 35 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 7.88 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 2640 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 2640 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Synthetic Organics | 220 | Others | Tons | Indigenous | Road | | 200 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 01 Jun 2017 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 56 | 32 | 54 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 12 | 9 | 12 | 80 | (3.) | Others | VOC in PPM | NA | 1.2 | 0.3 | 1.1 | NA | (4.) | NOx | | Micro Gram per Meter Cube | 12 | 9 | 11 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 24 | 11 | 23 | 60 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 365 | 74 | 250 | 250 | (2.) | pH | | | NA | | 7.8 | 7 | 7 | 7 | (3.) | TSS | | | mg/l | | 13 | 10 | 100 | 100 | (4.) | TDS | | | mg/l | | 1081 | 327 | 500 | 500 | (5.) | Fluoride | | | mg/l | | 0.87 | 0.4 | 1 | 1 | (6.) | Total Hardness | | | mg/l | | 790 | 130 | 200 | 200 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 6.67 | 6.6 | E | (2.) | BOD | | mg/l | | 4 | 3.7 | B | (3.) | COD | | mg/l | | 13 | 11 | B | (4.) | DO | | mg/l | | 4.4 | 4.3 | B | |
14.4. No. of Ambient Noise monitoring locations : 10 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53 | 44 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 40 | 34 | 45 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 388 | 239 | (2.) | Electric Conductivity | Others | ds/m | 0.3 | 0.04 | (3.) | pH | | | 8 | 6.8 | (4.) | P(Phosphorus) | Percent | | 0.76 | 0.32 | (5.) | N(Nitrogen) | Percent | | 0.29 | 0.017 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.3 To 26 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.54 To 16 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 206.82 | 1 | Copy of Permission Letter | Pipeline | | Tube Well | | T2/DEE2/MB Grid/Bulk Water Connections/2017-18 | 30 Mar 2019 | 250 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | High TDS and High COD Stream | 67.9 | 100 | Effluent is stripped in a steam stripper to remove organics and then concentrated in multiple effect evaporators (MEE) followed by drying in agitated thin film dryer (ATFD). Stripper condensate will be sent to cement plants for Co-Incineration. Salt from ATFD is sent to TSDF. Distillate from MEE and ATFD is sent for further treatment in biological treatment plant | Others | Reused in Cooling Towers and Boiler Makeup | 64 | 3.9 | (2.) | Low TDS and Low COD Stream | 43.5 | 150 | Sent to Biological Treatment System followed by RO. RO permeate reused for cooling towers and boiler makeup. RO rejects are sent to MEE | Others | Reused in Cooling Towers and Boiler Makeup | 42 | 1.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 111.4 | (b)Total Discharged Water (Kilolitre per Day) | 5.4 | (c)Total Reused Water (Kilolitre per Day) | 106 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Organic Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2007.5 | Tons | 60 | Road | | Others | Sent to TSDF or Cement Plants for Co-processing | (2.) | Boiler Ash | Bottom Ash | | 11680 | Tons | 5 | Road | | Others | Sent to Brick Manufacturers | (3.) | Inorganic Residue | Industrial Waste | | 255.5 | Tons | 52 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Spent Carbon | Industrial Waste | | 237.25 | Tons | 60 | Road | | Others | Sent to TSDF or Cement Plants for Co-processing | (5.) | Evaporation Salts | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1120.55 | Tons | 52 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (6.) | Solvent Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1361.45 | Tons | 60 | Road | | Others | Sent to TSDF or Cement Plants for Co-processing | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 12 | 1.6 | 3.3 | 15.36 | 80 | (2.) | NOx | | Microgram per Meter Cube | 12 | 1.6 | 4.2 | 16.28 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 23 | 1.6 | 0.5 | 23.52 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 54 | 1.6 | 1.1 | 55.16 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 2x8TPH Boiler | Coal | 30 | 0.9 | SO2 | | 0.7 g/sec | (2.) | 2x8TPH Boiler | Coal | 30 | 0.9 | NOx | | 0.25 g/sec | (3.) | 2x8TPH Boiler | Coal | 30 | 0.9 | PM10 | | 0.6 g/sec | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 5000 | (b)Source | TSSPDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1x1500 kVA; 2x1000 kVA; 1x500 kVA | (e)Stack Height (in m) | 10 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.56 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.56 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Private Lans | 4.56 | Total (ha.) | 4.56 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 1.51 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Patancheru Bollaram | 78.5 | Critically Polluted Area | (2.) | NPA | NA | 0.00 | No NPA | (3.) | Corridors | NA | 0.00 | No Corridors | (4.) | Wildlife Corridors | NA | 0.00 | No Wildlife Corridors | (5.) | WLS | NA | 0.00 | No WLS | (6.) | ESAs | NA | 0.00 | No ESAs | (7.) | ESZs | NA | 0.00 | No ESZs | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Chityal RF | 6 | in East | (2.) | Defence Installations | | NA | 0.00 | No Defence Installations | (3.) | Archaeological Sites | | NA | 0.00 | No Archaeological Sites | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.56 | (b)Land yet to be acquired(Ha) | 0.00 | (c)Status of Land acquisition if not acquired | Taken Lease for 25 years from principle organizati | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chinna Vagu a Seasonal Nala | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 6.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 300 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 100 | (e)No. of working days | 365 | (f)Total Manpower | 480 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.51 | (b)Percentage of Total Project Area | 33.11 | (c)No. of Plants to be Planted | 2500 | (d)Funds Allocated for Plantation | 800000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0077 | (ii)Name of the EIA Consultant | Team Labs and Consultants | (iii)Address | TEAM Labs and Consultants B-115-117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad-500 038 | (iv)Mobile No. | 9866415966 | (v)Landline No. | 0402374855 | (vi)Email Id | teamlabs@gmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 01 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify/submit the following:-
- Whether the proposed industrial operations would be in conformity with permitted land use of the area. The same needs to be confirmed along with supporting documents.
- During public hearing conducted on 14/9/2018, more than 90% of the locals have opposed setting up the industry.
- Firm commitment from the regulatory authority to supply 206.82 cum/day of surface water. | 16 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 04 Apr 2019 | 3. | NA | To support your contention regarding problems in public hearing conducted on 14/9/2018, comments from SPCB would facilitate to take the proposal forward. | 13 Apr 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Mohan Reddy C | Designation | Director | Name of Company (Applicant Name should not be given here) | HONOUR INFRAESTATES LTD | Address | SY. NO. 169 - 171, 174 - 186, 186(P), 187 - 188, 188(P),
189 - 191, 191(p), 192, 194 - 204, 204(P), 205, 206(P), 217(P),
221(P), 222, 222(P), 223 - 231, 231(P), 232, 232(P), 233 - 242, 242(P),243 - 245, 245(P), 246, 248 - 256,
PEDDAMASANPALLY |
|