1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Construction of Eight lane road (newly declared NH 148N) from Kajaliya village in Ratlam district in the state of Madhya Pradesh to Dodka village in Vadodara district in the state of Gujarat from CH: | (b)Name of the Company / Organisation | National Highways Authority of India | (c)Registered Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,South West,Delhi-110075 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr Biswajit Mukhopadhyay | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075,G-5 & 6, Sector-10, Dwarka, New DElhi-110075,,New Delhi,Delhi-110075 | (d)Pin code | 110075 | (e)E-mail | biswajit@nhai.org | (f)STD Code. | 11(f)Telephone No. | 25074200 | (g)Fax No. | 25093543 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(f) Highways
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/NCP/94616/2018 | (d)Master Proposal Number(Single Window) | SW/94426/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Kajaliya village Ratlam district in the Madhya Pra | (b)Pincode | 391340 | (c)Bounded Latitudes (North) | | From | | Degree | 22.460236 | Minutes | | Second | | From | | Degree | 23.302294 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.116583 | Minutes | | Second | | From | | Degree | 74.857392 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H45/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 45 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 2 | (c)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-50/2018-IA.III | (c)Date of Apply of TOR | 07 Jul 2018 | (d)Date of Issue of TOR / Standard ToR | 12 Sep 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| mamiatdar office | State : | Gujarat | District : | Vadodara | Tehsil : | Savli | Village : | Savli |
| 120 | Land compensation amount Land demanded in lieu of acquired land and pollution from construction. | Others | ADM | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2 |
| Tehsil Office Ravti, ratlam | State : | Madhya Pradesh | District : | Ratlam | Tehsil : | Ratlam | Village : | Ravti |
| 80 | Land compensation amount
Land demanded in lieu of acquired land | Others | Additional Collector Ratlam | (3.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 2.5 |
| Timarwani panchyat bhawan | State : | Madhya Pradesh | District : | Jhabua | Tehsil : | Thandla | Village : | Timarwani village |
| 73 | Land compensation amount Land demanded in lieu of acquired land | Others | ADC | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | N/A | N/A | N/A | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | N/A | 0 | Others | N/A | Others | N/A | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 6345 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 32.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 31.7 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 16.1 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 10008783.2141 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 10008783.2141 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Bitumen | 275808.7917 | Others | Cum | Nearby project area | Road | | 10 | Linkage | | Copy of Linkage | (2.) | Coarse Sand | 6937081.241 | Others | Cum | Mine quarry | Road | | 10 | MoU | | Copy of Linkage | (3.) | Cement | 732269.2764 | Others | Cum | Nearby project area | Road | | 10 | Linkage | | Copy of Linkage | (4.) | Sand | 2063623.905 | Others | Cum | Mine quarry | Road | | 10 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Apr 2018 To 30 Jun 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 12 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 57.8 | 30.9 | 55 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 27.9 | 9.0 | 25.0 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 34.8 | 11.2 | 33.5 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 0.98 | 0.32 | 0.95 | 4 | (5.) | PM10 | | Micro Gram per Meter Cube | 95.2 | 53.6 | 92.2 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.27 | 7.6 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | TDS | | | mg/l | | 458.23 | 404.54 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 302.32 | 236.10 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 85.32 | 50.32 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.98 | 0.60 | 1 | 1.5 | (7.) | Heavy Metals | | Zn | mg/l | | 0.06 | 0.03 | 5 | 15 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.0 | 6.55 | C | (2.) | BOD | | mg/l | | 3.0 | 2.2 | C | (3.) | COD | | mg/l | | 6.4 | 5.0 | C | (4.) | DO | | mg/l | | 6.0 | 5.8 | C | |
14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.4 | 50.1 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 53.5 | 39.8 | 55 | |
14.5. No. of Soil Sample Monitored locations : 12 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 222.73 | 170.45 | (2.) | Electric Conductivity | Others | micromhos per cm | 309.01 | 206.45 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 47.50 | 12.72 | (4.) | pH | | | 7.8 | 7.21 | (5.) | K(Potassium) | Milligram per Kilogram | | 419.53 | 299.53 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 25.4 To 4.4 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.2 To 11.25 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 2330 | 0 | Copy of Permission Letter | Pipeline | | Intake Well | | N/A | 01 Feb 2019 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | N/A | 0 | 0 | N/A | Green Belt Renewal Plant | | 0 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | N/A | Industrial Waste | | 0 | Tons | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 57.8 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 27.9 | 80 | (3.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 34.8 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 0 | 0 | 0 | 95.2 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | N/A | N/A | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | N/A | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 260 | (b)Private Land (ha.) | 1280 | (c)Government Land (ha.) | 910 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2450 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 2157.12 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 28.83 | (e)Settlements (ha.) | 4.05 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 260 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : N/A | 0 | Total (ha.) | 2450 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 423 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | N/A | 0 | N/A | (2.) | ESZs | N/A | 0 | N/A | (3.) | Corridors | N/A | 0 | N/A | (4.) | Wildlife Corridors | N/A | 0 | N/A | (5.) | WLS | N/A | 0 | N/A | (6.) | NPA | N/A | 0 | N/A | (7.) | ESAs | N/A | 0 | N/A | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Protected Forest | 0 | along crossing of rail/road/canal | (2.) | Archaeological Sites | | N/A | 0 | N/A | (3.) | Defence Installations | | N/A | 0 | N/A | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Protected | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2450 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | N/A | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 125 | (b)No. of Households | 3250 | (c)No. of PDFs (Project Displaced Families) | 405 | (d)No. of PAFs (Project Affected Families) | 3250 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 1351.5 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | 15 Rivers, 28 Canals, 04 Dam, 01 check Dam, 51 Drains, 11 Pond and 01 other water bodies | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 100 | (b)Permanent Employment-During Operation | 120 | (c)Temporary Employment- During Construction | 800 | (d)Temporary Employment- During Operation | 200 | (e)No. of working days | 340 | (f)Total Manpower | 1220 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 423 | (b)Percentage of Total Project Area | 17.27 | (c)No. of Plants to be Planted | 126600 | (d)Funds Allocated for Plantation | 189900000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment Generation | (2.) | Environmental | Faster transportation will ultimately lead to massive savings in the form of reduced wear and tear of vehicles, reduced vehicle operating costs (VOCs) and total reduction in transportation costs etc. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 0 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 0 | (d)Total plot area (sqm) | 0 | (e)Total built up area (sqm) | 0 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | N/A | |
|
5. | Energy Saving Measures: | (a)Source/Mode | N/A | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | 211.492 | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | (a)Total No. of Bridges | 163 | (b)Total No. of ROB | 2 | (c)Total No. of Interchanges | 6 | (d)Total No. of Flyovers | 0 | (e)Total No. of Vehicle Underpass | 20 | (f)Total No. of Pedestrian Underpass | 0 | (g)Details of other utilities rail and road corridors | LVUP- 50, SVUP- 71, Culverts - 211 | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/IA 0018 | (ii)Name of the EIA Consultant | Enviro Infra Solutions Pvt. Ltd. | (iii)Address | 301,302 & 305, SRBC, Plot No. INS - 12, Sector - 9,Vasundhara, Ghaziabad. (U.P.) - 201012 | (iv)Mobile No. | 9818922344 | (v)Landline No. | 0120415118 | (vi)Email Id | eis@enviroinfrasolutions.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 09 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | The EIA/EMP report has been revised after incorporating all the Public Hearing reports of all the districts involved in this project and is attached for grant of Environmental Clearance. | 13 Jul 2019 | 2. | NA | The EAC, during 208th meeting held on 19-20 February, 2019, observed Public Hearing has been conducted for only four out of five districts. Therefore, the EAC did not consider the proposal and advised the PP to submit the revised EIA/EMP after incorporating all the Public Hearing reports of all the districts involved in this project. Hence the proposal was deferred by the EAC. | 12 Mar 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr Biswajit Mukhopadhyay | Designation | General Manager | Name of Company (Applicant Name should not be given here) | National Highways Authority of India | Address | G-5 & 6, Sector-10, Dwarka, New DElhi-110075 |
|