Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Clinker unit from 3.3 MTPA to 3.927 MTPA, Addition of 9.5 MW CPP-WHRS and dropping of 40 MW FBC-Captive Power from 70 MW accorded in previous EC under para 7(ii) of EIA Notification 14th
(b)Name of the Company / Organisation BHARATHI CEMENT CORPORATION PRIVATE LIMITED
(c)Registered Address kamalapuram mandal,yerraguntla,,Cuddapah,Andhra Pradesh-516289
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant swathi vobilishetty
(b)Designation (Owner/ Partner/ CEO) manager
(c)Address banjarahills.hyderabad,,Secunderabad,Hyderabad,Telangana-500034
(d)Pin code 500034
(e)E-mail swathi.y@vicat.com
(f)STD Code. 40(f)Telephone No. 30006999
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND/94552/2019
(d)Master Proposal Number(Single Window) SW/94549/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 212,213,215,217,355
(b)Pincode 516289
(c)Bounded Latitudes (North)
From
Degree 143456.82
Minutes
Second
From
Degree 143547.66
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 783421.95
Minutes
Second
From
Degree 783451.30
Minutes
Second
(e)Survey of India Topo Sheet No. D44G10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 165
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.3
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaMancherialMancherialSrirampur
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/525/AP/1578
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 4 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cement500000005000000Tons per Annum(TPA)Road,Rail
(2.)WHRS-CPP09.59.5Mega Watt(MW)OthersTransmission line
(3.)Cement Clinker33000006270003927000Tons per Annum(TPA)Road,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Clinker Kiln 21.815 MTPA0.33 MTPA2.145 MTPAIncrease by 0.33 MTPA
(2.)FBC-Power Plant70 MW- 40 MW30 MW40 MW Power Dropped
(3.)WHRS-Power Plant09.5 MW9.5 MWPower from Waste Heat Recovery of Kilns
(4.)Clinker Kiln 11.485 MTPA0.297 MTPA1.782 MTPAIncrease by 0.297 MTPA
(5.)Cement Mill5.0 MTPA05.0 MTPANo Change
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Feb 2018
(iv)Valid Upto 30 Sep 2020
(v)File No. APPCB/KNL/ATP/105/CFO/HO/2018-595
(vi)Application No. APPCB/KNL/ATP/105/CFO/HO/2018-595
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 115
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.11
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 6500238
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 6500238
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Limestone5694150Tons per Annumown Captive MinesConveyor Belt0.4 LinkageCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.15 To 14.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 8.49 To 12.85
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface850013.78Copy of Permission LetterPipelineIntake WellG.OMs.No.1801 Feb 200811637
(2.)GroundWater00Copy of Permission LetterPipelineOthersBore Well6919/HgII(1)/200610 Jan 20071000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial10621100ETPReuse within the Plant & Recycling1062
(2.)Domestic125150STPGreen Belt Renewal Plant125
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1187
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1187
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Fly ash & Bed Ash from CFBCIndustrial Waste88800Tons0RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.25.74.4784.68100
(2.)PM2.5Microgram per Meter Cube32.55.72.6435.1560
(3.)NOxMicrogram per Meter Cube24.25.723.2947.5080
(4.)SO2Microgram per Meter Cube19.25.72.5321.7480
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Kiln 1Coal + AFR1405OthersParticulate Matter5.31 g/s
(2.)Kiln 1Coal + AFR1405SO24.05 g/s
(3.)Kiln 2Coal + AFR1405SO29.76
(4.)Kiln 2Coal + AFR1405NOx98.16 g/s
(5.)Cooler 1NA304OthersParticulate matter2.38 g/s
(6.)Cement Mill 1 & 2Electricity505.3OthersParticulate matter1.88 g/s
(7.)Kiln 2Coal + AFR1405OthersParticulate Matter4.45 g/s
(8.)CPP-30 MWCoal1052.4OthersParticulate matter0.635 g/s
(9.)Kiln 1Coal + AFR1405NOx77.76 g/s
(10.)Cooler 2NA404OthersParticulate matter2.84 g/s
(11.)Coal mill 1Electricity351.7OthersParticulate matter0.3 g/s
(12.)COal mill 2Electricity351.7OthersParticulate Matter0.35 g/s
(13.)CPP-30 MWCoal1052.4SO22.08 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 10606
(b)Source Southern Power Distribution Co Ltd
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 3 MW
(e)Stack Height (in m) 17
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 160
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 160
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 23457
(b)Waste/Barren Land (ha.) 3453.80
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2229.80
(e)Settlements (ha.) 622.20
(f)Industrial (ha.) 414
(g)Forest (ha.) 62.30
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining 1161.40
    Total (ha.) 31400.5
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt66
(2.)Water Reservoir6
(3.)Main Plant49
(4.)OthersVacant Space39
Total (ha.) 160
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Not found
(2.)NPANA0Not found
(3.)ESAsNA0Not found
(4.)WLSNA0Not found
(5.)CorridorsNA0Not found
(6.)ESZsNA0Not found
(7.)Wildlife CorridorsNA0Not found
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0Not Found
(2.)Archaeological SitesNA0Not Found
(3.)Defence InstallationsNA0Not Found
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 160
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pageru
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 1.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 8
(b)Permanent Employment-During Operation 62
(c)Temporary Employment- During Construction 37
(d)Temporary Employment- During Operation 193
(e)No. of working days 330
(f)Total Manpower 300
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt66066
(2.)Percentage of Total Project Area41.2041.2
(3.)No. of Plants87915087915
(4.)Funds Allocated15112500015112500
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialInfrastructure Development, Peripheral Development
(2.)FinancialRevenue Generation
(3.)EnvironmentalAfforestation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 158
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt Ltd
(iii)Address Plot No-N 22 & 23, Chandaka Industrial Estate
(iv)Mobile No. 7752017905
(v)Landline No. 0674645178
(vi)Email Id visiontekin@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 12 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantswathi vobilishetty
Designationmanager
Name of Company (Applicant Name should not be given here)BHARATHI CEMENT CORPORATION PRIVATE LIMITED
Addresskamalapuram mandal,yerraguntla
Print