1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Sultanpur Thanda Limestone Mine- M/s. NCL Industries Limited | (b)Name of the Company / Organisation | NCL INDUSTRIES LIMITED | (c)Registered Address | NCL INDUSTRIES LIMITED
7th Floor , Raghavaratna Towers, Chirag Ali Lane,Abids ,Hyderabad,,Nalgonda,Telangana-500001 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Gautam K | (b)Designation (Owner/ Partner/ CEO) | Joint Managing Director | (c)Address | NCL INDUSTRIES LIMITED
NCL Pearl, 6th & 7th Floor, Near Rail Nilayam, S.D. Road, Secunderabad,,Secunderabad,Hyderabad,Telangana-500026 | (d)Pin code | 500026 | (e)E-mail | gautam@nclind.com | (f)STD Code. | 40(f)Telephone No. | 30120000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/TG/MIN/53618/2007 | (d)Master Proposal Number(Single Window) | SW/94387/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 540 (P) | (b)Pincode | 508204 | (c)Bounded Latitudes (North) | | From | | Degree | 1848094.62 | Minutes | | Second | | From | | Degree | 1849045.41 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 376190.30 | Minutes | | Second | | From | | Degree | 377350.38 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 56 P/14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 60 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Telangana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Telangana | Suryapet | Mattam palle | Pedaveedu Village | (2.) | Telangana | Suryapet | Mattam palle | Pedaveedu Village | (3.) | Telangana | Mancherial | Mancherial | Srirampur | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/576/2008-IA.II(I) | (c)Date of Issue of TOR | 11 Nov 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 22 Jun 2009 | (c)Date of Issue of EC | 15 Dec 2009 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 29 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| mine site | State : | Telangana | District : | Suryapet | Tehsil : | Mattam palle | Village : | Pedaveedu |
| 600 | Greenbelt development, drinking water, employment, roads maintenance, social welfare measures and medical facilities | District Magistrate | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Chennai | (iii)Letter No. | EP/12.1/835/AP/0696 dated 17.06.2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 5 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 50000 | 950000 | 1000000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Limestone Mine | open cast mining | open cast mining | open cast mining | - | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 03 Mar 2017 | (iv)Valid Upto | 31 Mar 2022 | (v)File No. | TSPCB/CFO/NLG/HO/2017-3266 | (vi)Application No. | 289 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 6 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.6 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.30 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | ANFO & Booster | 200 | Tons per Annum | | local | Road | | 230 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 06 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 13.9 | 10.3 | 13 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 15.6 | 11.3 | 15 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 68.1 | 49.6 | 68 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 30.2 | 21.3 | 30 | 60 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 1852 | 542 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 630 | 273 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 1.32 | 0.7 | 1 | 1.5 | (5.) | Heavy Metals | | Zinc | mg/l | | 0.01 | 0.01 | 5 | 15 | (6.) | Chlorides | | | mg/l | | 467 | 62 | 250 | 1000 | (7.) | pH | | | Others | No units | 7.49 | 6.79 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.8 | 5.4 | C | (2.) | BOD | | mg/l | | 3 | 2 | C | (3.) | COD | | mg/l | | 14 | 10 | C | (4.) | pH | | NA | | 7.62 | 7.58 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.4 | 49.6 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 45.1 | 38.4 | 45 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.17 | 7.55 | (2.) | P(Phosphorus) | Kilogram per hectare | | 78 | 22 | (3.) | K(Potassium) | Kilogram per hectare | | 525 | 167 | (4.) | Electric Conductivity | Others | MICRO SIEMENS/CM | 603 | 151 | (5.) | N(Nitrogen) | Kilogram per hectare | | 415 | 149 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 40 To 45 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 30 To 35 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | mine pit | 40 | 1 | Copy of Permission Letter | Pipeline | | Others | pumping from mine pit | Not Applicaable | 01 Jan 2009 | 40 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic use | 1.6 | 2 | SEPTIC TANK | Others | SOAK PIT | 0 | 1.6 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1.6 | (b)Total Discharged Water (Kilolitre per Day) | 1.6 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | None | Others | NA | 0 | Tons | 0 | Others | No solid waste | Others | No solid waste generation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 30.1 | 0.5 | 2.06 | 32.2 | 60 | (2.) | NOx | | Microgram per Meter Cube | 15.5 | 2.5 | 5 | 21 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 13.8 | 2.5 | 4.98 | 18.8 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 68 | 0.5 | 12.9 | 80.93 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | None | not applicable | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 250 | (b)Source | Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | None | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 42.83 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 42.83 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.5 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : out crop and mining | 42.33 | Total (ha.) | 42.83 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 39.64 | | (2.) | Green belt | | 3.188 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | Not Applicable | (2.) | NPA | None | 0 | Not Applicable | (3.) | ESAs | None | 0 | Not Applicable | (4.) | ESZs | None | 0 | Not Applicable | (5.) | Corridors | None | 0 | Not Applicable | (6.) | Wildlife Corridors | None | 0 | Not Applicable | (7.) | Critically Polluted Area | None | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | 0 | None within 10 km | (2.) | Defence Installations | | None | 0 | Not Applicable | (3.) | Forest | | Sultanpur RF – Adjacent RF near to mine | 0.3 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 42.83 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Krishna River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 0.60 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 25 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 35 | (e)No. of working days | 300 | (f)Total Manpower | 60 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0 | 3.188 | 3.188 | (2.) | No. of Plants | 0 | 4782 | 4782 | (3.) | Funds Allocated | 0 | 1000000 | 1000000 | (4.) | Percentage of Total Project Area | 0 | 7.4 | 7.4 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | • No additional land acquisition. The mining operations will continue in the Govt Poramboke land which is devoid of any agricultural activities.
• Most of the mining area is outcrop of limestone. No waste generation from the mine. No dumps will be formed | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1.0 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | AP/NLG/MP/LST-31/HYD | (b)Date of Approval | 28 Feb 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 42.83 | (f)Approved Capacity | 1.0 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 29.512 | (b)Mineable Reserves (Million Ton) | 23.042 | (c)Extractable Reserves(Million Ton) | 23.042 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Cement Grade | (f)Stripping Ratio | 1 : 0 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 4 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 23 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 42.83 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 22 Jun 1996 | (iii)Validity of LOI | 20 | (iv)Reference No. of LOI | Go Ms 126 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 42.83 | (iii)Validity of the lease deed | From : 29 Oct 1996 To : 28 Oct 2046 | (iv)Date of Execution of Mining Lese | 29 Oct 1996 | (v)Reference Number | 2876/M/1998 | (d)Whether Lease Deed Renewed ? | Yes | |
|
11.1. Earlier Renewals |
---|
S. No. | Lease Details | Date of Renewal | Period | Copy of Earlier Lease | Letter No. | Area | Remarks |
---|
NIL | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 3240 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 3240 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 39.642 | (b)Depth (in meter) | 30 | (c)Volume (in Million Cubic meter) | 57.605 | |
|
12. | Details of Quarry: | (a)Final Void of 39.642 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 39.642 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | BY ROAD | (b)Surface to Siding/Loading | BY ROAD | (c)Transportation / Conveyor Details | BY ROAD | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SETTLEMENTS | | 0 | 0 | 0 | (2.) | AGRICULTURE LAND | | 0 | 0 | 0 | (3.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (4.) | FOREST LAND | | 0 | 0 | 0 | (5.) | GRAZING LAND | | 0 | 0 | 0 | (6.) | WASTE LAND | | 42.83 | 0 | 42.83 | |
TOTAL | 42.83 | 0 | 42.83 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 39.642 | 0 | | 39.642 | (2.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (3.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (4.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (5.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (6.) | GREEN BELT | | 2.368 | 0 | 0 | | 2.368 | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (8.) | ROADS | | 0 | 0 | 0 | | 0 | (9.) | Other | Safety Bund at HFL of Pulichintala Project | 0.82 | 0 | 0 | | 0.82 | |
TOTAL | 3.188 | 39.642 | 0 | 0 | 42.83 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 39.642 | (d)Safety Zone(in hectare) | 0.82 | (e)Final Void of 39.642 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 2.368 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 9495 | 0 | 0 | 0 | 0 | 0 | (2.) | 9596 | 0 | 0 | 0 | 0 | 0 | (3.) | 9697 | 0 | 0 | 0 | 0 | 0 | (4.) | 9798 | 0 | 0 | 0 | 0 | 0 | (5.) | 9394 | 0 | 0 | 0 | 0 | 0 | (6.) | 0203 | 0 | 0 | 0 | 0.0002 | 0.0002 | (7.) | 0405 | 0 | 0 | 0 | 0 | 0 | (8.) | 0506 | 0 | 0 | 0 | 0 | 0 | (9.) | 0809 | 0.0077 | 0 | 0 | 0.001 | 0 | (10.) | 0910 | 0.05 | 0.05 | 0 | 0.0001 | 0 | (11.) | 1011 | 0.05 | 0.05 | 0.051 | 0.001 | 0 | (12.) | 1516 | 0.05 | 0.0497 | 0.05 | 0.052 | 0.002 | (13.) | 1617 | 0.05 | 0.0497 | 0.2 | 0.051 | 0.001 | (14.) | 1718 | 0.05 | 0.0497 | 1.0 | 0.05 | 0 | (15.) | 1213 | 0.05 | 0.0497 | 0.05 | 0.02 | 0 | (16.) | 0001 | 0 | 0 | 0 | 0 | 0 | (17.) | 0102 | 0 | 0 | 0 | 0 | 0 | (18.) | 1112 | 0.05 | 0.05 | 0.051 | 0.05 | 0 | (19.) | 1314 | 0.05 | 0.0497 | 0.05 | 0.0002 | 0 | (20.) | 1415 | 0.05 | 0.0497 | 0.05 | 0.0325 | 0 | (21.) | 0607 | 0.0077 | 0 | 0 | 0 | 0 | (22.) | 0708 | 0.0077 | 0 | 0 | 0 | 0 | (23.) | 9899 | 0 | 0 | 0 | 0 | 0 | (24.) | 992000 | 0 | 0 | 0 | 0.0002 | 0.0002 | (25.) | 0304 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA064 | (ii)Name of the EIA Consultant | B. S. Envi-Tech Pvt. Ltd. | (iii)Address | 12-13-1270/71/73, Amity Ville, 4th Floor, Beside Spencer Super Market, St. Ann’s Road, Tarnaka, Secunderabad-500017 | (iv)Mobile No. | 9848053012 | (v)Landline No. | 0404978306 | (vi)Email Id | info@bsenvitech.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 12 Nov 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.)
(ii) Details of demand if any raised by Department of Mining and Geology
(iii) Details of payment, if any made to Department of Mines & Geology
(iv) Validity of mine lease
(v) Status of mine whether working or not
(vi) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
(vii) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018.
(viii) Compliance report submitted by PP is very old. Kindly upload the latest certified compliance report
(ix) The document uploaded w.r.t. CTO are not uploaded properly some part of the letter are missing.
(x) Annexures uploaded are not legible. | 01 Mar 2019 | 2. | NA | The correction have been made as per the instruction received | 25 Jun 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Request Letter seeking time for submission of additional data is sought in the light of Covid 19 related Lockdown and delays that have taken place. | 30 Jun 2021 | 2. | NA | Deferred. | 01 Apr 2021 | 3. | ADS Reply Letter | We are herewith submitting the past production details sought by MOEFCC. | 17 Feb 2021 | 4. | ADS Raise Letter | ADS | 01 Oct 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Gautam K | Designation | Joint Managing Director | Name of Company (Applicant Name should not be given here) | NCL INDUSTRIES LIMITED | Address | NCL INDUSTRIES LIMITED
7th Floor , Raghavaratna Towers, Chirag Ali Lane,Abids ,Hyderabad |
|