Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sultanpur Thanda Limestone Mine- M/s. NCL Industries Limited
(b)Name of the Company / Organisation NCL INDUSTRIES LIMITED
(c)Registered Address NCL INDUSTRIES LIMITED 7th Floor , Raghavaratna Towers, Chirag Ali Lane,Abids ,Hyderabad,,Nalgonda,Telangana-500001
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Gautam K
(b)Designation (Owner/ Partner/ CEO) Joint Managing Director
(c)Address NCL INDUSTRIES LIMITED NCL Pearl, 6th & 7th Floor, Near Rail Nilayam, S.D. Road, Secunderabad,,Secunderabad,Hyderabad,Telangana-500026
(d)Pin code 500026
(e)E-mail gautam@nclind.com
(f)STD Code. 40(f)Telephone No. 30120000
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/TG/MIN/53618/2007
(d)Master Proposal Number(Single Window) SW/94387/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 540 (P)
(b)Pincode 508204
(c)Bounded Latitudes (North)
From
Degree 1848094.62
Minutes
Second
From
Degree 1849045.41
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 376190.30
Minutes
Second
From
Degree 377350.38
Minutes
Second
(e)Survey of India Topo Sheet No. 56 P/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 60
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaSuryapetMattam pallePedaveedu Village
(2.)TelanganaSuryapetMattam pallePedaveedu Village
(3.)TelanganaMancherialMancherialSrirampur
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/576/2008-IA.II(I)
(c)Date of Issue of TOR 11 Nov 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 22 Jun 2009
(c)Date of Issue of EC 15 Dec 2009
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Jun 2018
Distance of Public Hearing Venue from the Proposed Project :0
mine site
State :Telangana
District :Suryapet
Tehsil :Mattam palle
Village :Pedaveedu
600Greenbelt development, drinking water, employment, roads maintenance, social welfare measures and medical facilitiesDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. EP/12.1/835/AP/0696 dated 17.06.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 5 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limestone500009500001000000Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Limestone Mineopen cast miningopen cast miningopen cast mining-
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 03 Mar 2017
(iv)Valid Upto 31 Mar 2022
(v)File No. TSPCB/CFO/NLG/HO/2017-3266
(vi)Application No. 289
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 6
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.6
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.30
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ANFO & Booster200Tons per AnnumlocalRoad230 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 06 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13.910.31380
(2.)NOxMicro Gram per Meter Cube15.611.31580
(3.)PM10Micro Gram per Meter Cube68.149.668100
(4.)PM2.5Micro Gram per Meter Cube30.221.33060
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l0000
(2.)TDSmg/l18525425002000
(3.)Total Hardnessmg/l630273200600
(4.)Fluoridemg/l1.320.711.5
(5.)Heavy MetalsZincmg/l0.010.01515
(6.)Chloridesmg/l467622501000
(7.)pHOthersNo units7.496.796.58.5
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.85.4C
(2.)BODmg/l32C
(3.)CODmg/l1410C
(4.)pHNA7.627.58C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.449.655
(2.)Leq(Night)A-weighted decibels(dB(A))45.138.445
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.177.55
(2.)P(Phosphorus)Kilogram per hectare7822
(3.)K(Potassium)Kilogram per hectare525167
(4.)Electric ConductivityOthersMICRO SIEMENS/CM603151
(5.)N(Nitrogen)Kilogram per hectare415149
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 40 To 45
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Othersmine pit401Copy of Permission LetterPipelineOtherspumping from mine pitNot Applicaable01 Jan 200940
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic use1.62SEPTIC TANKOthersSOAK PIT01.6
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1.6
(b)Total Discharged Water (Kilolitre per Day) 1.6
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)NoneOthersNA0Tons0OthersNo solid wasteOthersNo solid waste generation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube30.10.52.0632.260
(2.)NOxMicrogram per Meter Cube15.52.552180
(3.)SO2Microgram per Meter Cube13.82.54.9818.880
(4.)PM10Microgram per Meter Cube680.512.980.93100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Nonenot applicable00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source Grid
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) None
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 42.83
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 42.83
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.5
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : out crop and mining 42.33
    Total (ha.) 42.83
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area39.64
(2.)Green belt3.188
Total (ha.) 42.828
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNone0Not Applicable
(2.)NPANone0Not Applicable
(3.)ESAsNone0Not Applicable
(4.)ESZsNone0Not Applicable
(5.)CorridorsNone0Not Applicable
(6.)Wildlife CorridorsNone0Not Applicable
(7.)Critically Polluted AreaNone0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0None within 10 km
(2.)Defence InstallationsNone0Not Applicable
(3.)ForestSultanpur RF – Adjacent RF near to mine0.3-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 42.83
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Krishna River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 0.60
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 25
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 35
(e)No. of working days 300
(f)Total Manpower 60
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt03.1883.188
(2.)No. of Plants047824782
(3.)Funds Allocated010000001000000
(4.)Percentage of Total Project Area07.47.4
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental• No additional land acquisition. The mining operations will continue in the Govt Poramboke land which is devoid of any agricultural activities. • Most of the mining area is outcrop of limestone. No waste generation from the mine. No dumps will be formed
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 1.0
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. AP/NLG/MP/LST-31/HYD
(b)Date of Approval 28 Feb 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 42.83
(f)Approved Capacity 1.0
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 29.512
(b)Mineable Reserves (Million Ton) 23.042
(c)Extractable Reserves(Million Ton) 23.042
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral Cement Grade
(f)Stripping Ratio 1 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 4
(i)Mining Method Opencast
(j)Life of Mine (Years) 23
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 42.83
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 22 Jun 1996
(iii)Validity of LOI 20
(iv)Reference No. of LOI Go Ms 126
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 42.83
(iii)Validity of the lease deed From : 29 Oct 1996 To : 28 Oct 2046
(iv)Date of Execution of Mining Lese 29 Oct 1996
(v)Reference Number 2876/M/1998
(d)Whether Lease Deed Renewed ? Yes
     11.1.    Earlier Renewals
S. No.Lease Details Date of Renewal Period Copy of Earlier Lease Letter No.Area Remarks
NIL
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 3240
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 3240
11.
Details of Final Mine Void:
(a)Area (in Hectare) 39.642
(b)Depth (in meter) 30
(c)Volume (in Million Cubic meter) 57.605
12.
Details of Quarry:
(a)Final Void of 39.642 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 39.642
13.
Details of Transportation:
(a)In Pit/Underground to Surface BY ROAD
(b)Surface to Siding/Loading BY ROAD
(c)Transportation / Conveyor Details BY ROAD
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SETTLEMENTS000
(2.)AGRICULTURE LAND000
(3.)SURFACE WATER BODIES000
(4.)FOREST LAND000
(5.)GRAZING LAND000
(6.)WASTE LAND42.83042.83
TOTAL42.83042.83
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY039.642039.642
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)INTERNAL OB DUMPS0000
(5.)VIRGIN AREA0000
(6.)GREEN BELT2.368002.368
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)ROADS0000
(9.)OtherSafety Bund at HFL of Pulichintala Project0.82000.82
TOTAL3.18839.6420042.83
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 39.642
(d)Safety Zone(in hectare) 0.82
(e)Final Void of 39.642 (hectare) at a Depth of 30 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 2.368
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan None
Total Area Excavated (in hectare) 4.056
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)949500000
(2.)959600000
(3.)969700000
(4.)979800000
(5.)939400000
(6.)02030000.00020.0002
(7.)040500000
(8.)050600000
(9.)08090.0077000.0010
(10.)09100.050.0500.00010
(11.)10110.050.050.0510.0010
(12.)15160.050.04970.050.0520.002
(13.)16170.050.04970.20.0510.001
(14.)17180.050.04971.00.050
(15.)12130.050.04970.050.020
(16.)000100000
(17.)010200000
(18.)11120.050.050.0510.050
(19.)13140.050.04970.050.00020
(20.)14150.050.04970.050.03250
(21.)06070.00770000
(22.)07080.00770000
(23.)989900000
(24.)9920000000.00020.0002
(25.)030400000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA064
(ii)Name of the EIA Consultant B. S. Envi-Tech Pvt. Ltd.
(iii)Address 12-13-1270/71/73, Amity Ville, 4th Floor, Beside Spencer Super Market, St. Ann’s Road, Tarnaka, Secunderabad-500017
(iv)Mobile No. 9848053012
(v)Landline No. 0404978306
(vi)Email Id info@bsenvitech.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 12 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA(i) Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.) (ii) Details of demand if any raised by Department of Mining and Geology (iii) Details of payment, if any made to Department of Mines & Geology (iv) Validity of mine lease (v) Status of mine whether working or not (vi) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government. (vii) Copy of affidavit needs to be submitted by PP in compliance of the Ministry’s OM no. 3-50/2017-IA.III (Pt.), dated 30th May 2018. (viii) Compliance report submitted by PP is very old. Kindly upload the latest certified compliance report (ix) The document uploaded w.r.t. CTO are not uploaded properly some part of the letter are missing. (x) Annexures uploaded are not legible. 01 Mar 2019
2.NAThe correction have been made as per the instruction received 25 Jun 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRequest Letter seeking time for submission of additional data is sought in the light of Covid 19 related Lockdown and delays that have taken place. 30 Jun 2021
2.NA

Deferred.

01 Apr 2021
3. ADS Reply LetterWe are herewith submitting the past production details sought by MOEFCC. 17 Feb 2021
4. ADS Raise LetterADS 01 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGautam K
DesignationJoint Managing Director
Name of Company (Applicant Name should not be given here)NCL INDUSTRIES LIMITED
AddressNCL INDUSTRIES LIMITED 7th Floor , Raghavaratna Towers, Chirag Ali Lane,Abids ,Hyderabad
Print