Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Construction of 4/6 lane road from Rasisar (Bikaner) to Deogarh (Jodhpur) in the state of Rajasthan from CH-0.000 km to 180.000 km. This is a part of Amritsar to Kandla Express Way under Bharatmala Pa
(b)Name of the Company / Organisation NATIONAL HIGHWAY AUTHORITY OF INDIA PIU JODHPUR
(c)Registered Address Humnabad,Bidar,,Bidar,Karnataka-585330
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shailendra Kumar Mishra
(b)Designation (Owner/ Partner/ CEO) PD
(c)Address National Highway Authority of India,188 Umaid Haritage,Jodhpur,Jodhpur,Rajasthan-342001
(d)Pin code 342001
(e)E-mail jodhpurpiu3@gmail.com
(f)STD Code. 291(f)Telephone No. 2510065
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(f) Highways
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/NCP/94368/2019
(d)Master Proposal Number(Single Window) SW/94363/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Bikaner and Jodhpur District
(b)Pincode 434803
(c)Bounded Latitudes (North)
From
Degree 25
Minutes
Second
From
Degree 27
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72
Minutes
Second
From
Degree 73
Minutes
Second
(e)Survey of India Topo Sheet No. G42R13, G43B2, G43B6, G43B3, G43A15, G43B4, G43A16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 356
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 40
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)TelanganaMancherialMancherialSrirampur
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :40
Collectorate Office, Bikaner
State :Rajasthan
District :Bikaner
Tehsil :Nokha
Village :Bikaner
40Public Had raised issues related to negative impacts due to cutting of trees, use of transplantation, maintenance of new tree plantation, involvement of local population in monitoring of grievance reOthersADM
(2.)
Date of Advertisement :22 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :29 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :5
Govt. Sec School Sirmandi, Jodhpur
State :Rajasthan
District :Jodhpur
Tehsil :Osian
Village :Deogarh, Tajnagar, Karwan
76Issues related to number of cutting trees, low survival rate of new planted trees, impacts of dust particles on human being and their mitigations, compensation for impacted structures, direct hit of aOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Green Field Economic Corridor6-laneGreen Field
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Hot Mix plant150OthersTon Per hourRoad
(2.)Batching plant360Cubic Meter per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3000
(b) Funds Allocated for Environment Management (Capital) (in Crores) 21
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 6.6
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 7800000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 7800000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Bitumen18711Tons per AnnumLocal SourceRoad175 Open MarketCopy of Linkage
(2.)Emulsion425Tons per AnnumKoyali RefineryRoad175 MoUCopy of Linkage
(3.)Cement38133.5Tons per AnnumLocal SourceRoad20 Open MarketCopy of Linkage
(4.)Water365000Kilo Litre per DayLocal SourceRoad40 Open MarketCopy of Linkage
(5.)Aggregate132613025OthersMTLocal SourceRoad210 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Apr 2018 To 30 Jun 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube125.211.880
(2.)NOxMicro Gram per Meter Cube37.216.53780
(3.)PM10Micro Gram per Meter Cube100.569.5100.1100
(4.)PM2.5Micro Gram per Meter Cube61.73961.260
    14.2.     No. of Ground Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.36.58.5
(2.)Fluoridemg/l0.80.511.5
(3.)Total Hardnessmg/l340.651200600
(4.)TDSmg/l17809805002000
(5.)TSSmg/l1.81.5510
(6.)Chloridesmg/l299.5118.12501000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l12.3712.37E
(2.)BODmg/l66E
(3.)CODmg/l20.320.3E
(4.)pHNA8.218.21E
    14.4.     No. of Ambient Noise monitoring locations : 4
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.548.465
(2.)Leq(Night)A-weighted decibels(dB(A))58.240.255
    14.5.     No. of Soil Sample Monitored locations : 4
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare145.6104.8
(2.)pH7.826.43
(3.)Electric ConductivityOthersmS/cm0.4600.31
(4.)P(Phosphorus)Kilogram per hectare28.2219.5
(5.)K(Potassium)Kilogram per hectare165120
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 80.3 To 88.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 77.2 To 82.6
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface100040 Not Appliacble modeOthersTankerTube Well45605 Feb 20191000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)construction waste water10.0NAGreen Belt Renewal Plant1
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DebrisConstruction & Demolition Waste100Tons5RoadOthersTo give locality for leveling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.40.050888.5100
(2.)SO2Microgram per Meter Cube9.10.050110.280
(3.)NOxMicrogram per Meter Cube24.40.050428.680
(4.)PM2.5Microgram per Meter Cube49.40.050554.560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)HMPLDO151NOx80
(2.)Hot Mix PlantLDO151PM10131
(3.)HMPLDO151SO2150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 600
(b)Source DG Set
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 600 kw DG set
(e)Stack Height (in m) 2
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1252.395
(c)Government Land (ha.) 142.285
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1394.68
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 1394
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Cart Track Land 0.68
    Total (ha.) 1394.68
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.5
Total (ha.) 2.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsJaipur-Delhi Express Way200it is industrial corridor
(2.)WLSTal Chhapar Wildlife Sanctuary100This sanctuary falls in Churu district
(3.)ESZsEco-Sensitive Zone of Tal Chappar Sanctuary90It is nearest ESZ
(4.)ESAsJorbeer Conservation Reserve21It is reserved for migratory and resident vultures
(5.)Wildlife CorridorsRanthambhore Wildlife Corridor in Swai Madhopur400It is nearest wildlife corridor
(6.)Critically Polluted AreaBiwadi250Biwadi industrial area is approx 250 km far
(7.)NPAJorbeer Conservation Reserve21It is reserved for migratory and resident vultures
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDesalser Bhatiyan forest area0.5It is nearest forest area in Desalser Bhatiyan village, Nokha
(2.)Defence InstallationsDefense area Bikaner40There are defense Air Strip and Chhawani area
(3.)Archaeological SitesMehrangarh fort, Jodhpur68It is protected under ASI
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 9000
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1252.395
(b)Land yet to be acquired(Ha) 142.285
(c)Status of Land acquisition if not acquired Govt. Land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 61
(b)No. of Households 396
(c)No. of PDFs (Project Displaced Families) 100
(d)No. of PAFs (Project Affected Families) 396
(e)Funds Allocated for R&R(in INR) (in Lacs) 1500
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30000
(b)Permanent Employment-During Operation 100000
(c)Temporary Employment- During Construction 100000
(d)Temporary Employment- During Operation 48100
(e)No. of working days 730
(f)Total Manpower 278100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 170
(b)Percentage of Total Project Area 12.19
(c)No. of Plants to be Planted 90000
(d)Funds Allocated for Plantation 306000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalSocial Benefits and Beautification
(2.)SocialIt will provide direct and indirect employment to local population
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 7
(b)Total No. of Flats to be Build 42
(c)No. of Buildings 21
(d)Total plot area (sqm) 31376
(e)Total built up area (sqm) 29376
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 21
(b)Capacity 50000
(c)No. of Recharge Pits 21
(d)Capacity 100000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 105/420
5.
Energy Saving Measures:
(a)Source/Mode Installation of Solar Energy on Building
(b)Percentage 10
(c)Quantity 210
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area no
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment 175.758
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
(a)Total No. of Bridges 2
(b)Total No. of ROB 1
(c)Total No. of Interchanges 6
(d)Total No. of Flyovers 6
(e)Total No. of Vehicle Underpass 19
(f)Total No. of Pedestrian Underpass 104
(g)Details of other utilities rail and road corridors 0
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA007
(ii)Name of the EIA Consultant Global Management And Engineering Consultants Inte
(iii)Address Sirsi , Jaipur, Rajasthan
(iv)Mobile No. 9928599571
(v)Landline No. 0141235324
(vi)Email Id info@gmecinternational.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 04 Feb 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease upload ToR letter in the application 07 Feb 2019
2.NAThe correction have been made as per the instruction received 08 Feb 2019
3.NATor letter at sl No 6 mentioned No ,Please clarriffy 13 Feb 2019
4.NAThe correction have been made as per the instruction received 13 Feb 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterSigned copy of Final EIA/EMP Report is Attached 03 Oct 2019
2.NAPlease upload the EIA/EMP report along with the EIA consultant declaration. 03 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShailendra Kumar Mishra
DesignationPD
Name of Company (Applicant Name should not be given here)NATIONAL HIGHWAY AUTHORITY OF INDIA PIU JODHPUR
AddressNHAI, PIU 188 Umaid Heritage, Ratnada, Jodhpur (Rajasthan)