|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Manbro Polymers Limited | (b)Name of the Company / Organisation | MANBRO POLYMERS LIMITED | (c)Registered Address | Plot No :-D-2/CH-275, Industrial Estate Dahej 2, Dahej 2-392110.Dist:-Bharuch,Gujarat,,Bharuch,Gujarat-392110 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kanhaiya Gupta | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | C-73, Shivaji Park, Punjabi Bagh, Delhi-110026,,Vagra,Bharuch,Gujarat-392110 | (d)Pin code | 392110 | (e)E-mail | kimimpex12@yahoo.com | (f)STD Code. | 11(f)Telephone No. | 45562525 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/80629/2018 | (d)Master Proposal Number(Single Window) | SW/94289/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. D-2/CH-275 | (b)Pincode | 392130 | (c)Bounded Latitudes (North) | | From | | Degree | 21.43 | Minutes | | Second | | From | | Degree | 21.43 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72.38 | Minutes | | Second | | From | | Degree | 72.39 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43M10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 00 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4.06 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Bharuch | Vagra | | (2.) | Telangana | Mancherial | Mancherial | Srirampur | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/301/2018-IA-II(I) | (b)Date of Apply of TOR | 10 Oct 2018 | (c)Date of Issue of TOR / Standard ToR | 17 Nov 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public hearing is not applicable to this new proje | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | SS Reactor with Condenser | 4 KL | 2 Nos. | (2.) | FBD | 500 Lit | 2 Nos | (3.) | Transfer Pump | -- | 4 Nos. | (4.) | Steam Ejector | -- | 1 Nos. | (5.) | MEE | 25 KLD | | (6.) | Process Vessel | 3 KL | 3 Nos. | (7.) | Cooling Tower | 600 m3/hr | 1 Nos. | (8.) | Thermic Fluid heater | 200000 Kcal/hr | 1 Nos. | (9.) | Process Vessel | 5 KL | 2 Nos. | (10.) | Sparkler Filter | 3 Hp | 4 Nos. | (11.) | Chilling Plant | 780 TR | 1 Nos. | (12.) | Vacuum Pump | -- | MS (6 Nos.) | (13.) | Cooling Tower | 1500 m3/hr | 1 Nos. | (14.) | Process Vessel | 2 KL | 3 Nos. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Mono glycerides | 2400 | Tons per Annum | | Road | | (2.) | 5-Chloro-8-Hydroxyquinoline [5-HQ] | 120 | Tons per Annum | | Road | | (3.) | 3, 4 Dichloro Phenol [3,4 DCP] | 120 | Tons per Annum | | Road | | (4.) | 2,3 Dichloro Phenol [2,3 DCP] | 120 | Tons per Annum | | Road | | (5.) | 8-Hydroxyquinoline [8-HQ] | 120 | Tons per Annum | | Road | | (6.) | Acetic Anhydride | 4800 | Tons per Annum | | Road | | (7.) | Acetem (I)Acetic Acid ester of Monoglyceride | 2400 | Tons per Annum | | Road | | (8.) | Ethyl Acetate | 1200 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3.6 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.8 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.09 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.73 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 26558 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 26558 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | 4-Chloro 2-Amino Phenol (4-CAP) | 147.27 | Tons per Annum | | Prerana Industries | Road | | 70 | Open Market | | Copy of Linkage | (2.) | Glycine | 249 | Tons per Annum | | Suvidhi Industries | Road | | 227 | Open Market | | Copy of Linkage | (3.) | Sulfuric Acid | 682 | Tons per Annum | | Sharanam Chemicals | Road | | 50 | Open Market | | Copy of Linkage | (4.) | Acetic Acid | 7661 | Tons per Annum | | Krishna Chemicals | Road | | 70 | Open Market | | Copy of Linkage | (5.) | 2 Amino Phenol | 139 | Tons per Annum | | Shree Hari Organic | Road | | 59.4 | Open Market | | Copy of Linkage | (6.) | Nitrosyl Sulfuric Acid | 501 | Tons per Annum | | Kashyap Industries | Road | | 147 | Open Market | | Copy of Linkage | (7.) | 3,4 DCA | 127.2 | Tons per Annum | | Triveni Chemicals | Road | | 120 | Open Market | | Copy of Linkage | (8.) | 2,3-dichloroaniline | 128 | Tons per Annum | | Shree Hari Organic | Road | | 74 | Open Market | | Copy of Linkage | (9.) | Fatty acid | 1192 | Tons per Annum | | Shiv Shakti Trading Corporation | Road | | 123 | Open Market | | Copy of Linkage | (10.) | GLYCEROL | 672 | Tons per Annum | | Shiv Shakti Trading Corporation | Road | | 123 | Open Market | | Copy of Linkage | (11.) | Pottassium Hydroxide | 3.6 | Tons per Annum | | Finox Pellets Industries | Road | | 228 | Open Market | | Copy of Linkage | (12.) | Acetic anhydride | 960 | Tons per Annum | | J K Enterprise | Road | | 240 | Open Market | | Copy of Linkage | (13.) | Sodium acetate anhydrous | 2 | Tons per Annum | | Krishna Chemicals | Road | | 70 | Open Market | | Copy of Linkage | (14.) | Caustic lye | 553 | Tons per Annum | | Shreenathji Chemicals | Road | | 227 | Open Market | | Copy of Linkage | (15.) | phosphorus penta chloride | 9792 | Tons per Annum | | Triveni Chemicals | Road | | 120 | Open Market | | Copy of Linkage | (16.) | Monoglyceride | 1656 | Tons per Annum | | Estelle Chemicals Private Limited | Road | | 67 | Open Market | | Copy of Linkage | (17.) | Ethanol | 2094 | Tons per Annum | | Nanda Enterprise | Road | | 251 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 54 | 23 | 48 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 29 | 10 | 25 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 30 | 15 | 26 | 80 | (4.) | Others | VOC | Micro Gram per Meter Cube | 6 | 0.3 | 0.4 | 5 | (5.) | PM10 | | Micro Gram per Meter Cube | 87 | 46 | 82 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | mg/l | | 8.01 | 7.09 | 7 | 8.5 | (2.) | Fluoride | | | mg/l | | 4.6 | 0.3 | 1 | 1.5 | (3.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.01 | 0.01 | (4.) | Total Hardness | | | mg/l | | 484.5 | 178.5 | 200 | 600 | (5.) | Chlorides | | | mg/l | | 725 | 72 | 250 | 1000 | (6.) | TDS | | | mg/l | | 3398 | 463 | 500 | 2000 | (7.) | TSS | | | mg/l | | 10 | 5 | 10 | 100 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 7.9 | 7.4 | A | (2.) | BOD | | mg/l | | 5.5 | 2 | A | (3.) | COD | | mg/l | | 8 | 5 | A | (4.) | DO | | mg/l | | 5.8 | 5.6 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 49 | 39 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 56 | 45 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.1 | 7.8 | (2.) | N(Nitrogen) | Milligram per Kilogram | | 1500 | 900 | (3.) | K(Potassium) | Milligram per Kilogram | | 298 | 190 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 700 | 400 | (5.) | Electric Conductivity | Others | µmhos/cm | 0.6 | 0.4 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 00 To 00 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 00 To 00 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC | 17.04 | 2 | Copy of Permission Letter | Pipeline | | Others | -- | GIDC/DEE(WS)/BRH/47 | 19 Jan 2019 | 25 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 3 | 3 | Soak Pit | Others | Soak Pit | 0 | 3 | (2.) | Industrial | 24 | 24 | ETP followed by MEE | Reuse within the Plant & Recycling,Others | ETP Sludge & MEE Salt at TSDF | 20.96 | 3.04 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 27 | (b)Total Discharged Water (Kilolitre per Day) | 6.04 | (c)Total Reused Water (Kilolitre per Day) | 20.96 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 360 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | MEE Salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 662.4 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 52 | Tons | 60 | Road | | Co-Processing | | (4.) | Hydrocloric Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3630 | Tons | 20 | Road | | Others | End User | (5.) | Acetic ACid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2060 | Tons | 30 | Road | | Others | End User | (6.) | Spent Sulphuric Acid | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 900 | Tons | 30 | Road | | Others | End User | (7.) | Used/Spent Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 2 | Tons | 65 | Road | | Authorized Recyclers | | (8.) | Phosphoric chloride | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 7490 | Tons | 30 | Road | | Others | End user | (9.) | Discarded Bags, Linner, Drum | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Tons | 60 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 30 | 1 | 0.516 | 30.517 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 54 | 1 | 0.794 | 54.975 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 29 | 1 | 0.595 | 29.596 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 87 | 1 | 0.794 | 87.795 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Briquette | 12 | 0.2 | Others | PM | 150 | (2.) | Boiler | Briquette | 12 | 0.2 | SO2 | | 100 | (3.) | TFH | Briquette | 12 | 0.2 | SO2 | | 100 | (4.) | TFH | Briquette | 12 | 0.2 | NOx | | 50 | (5.) | TFH | Briquette | 12 | 0.2 | Others | PM | 150 | (6.) | Reactor Vent | -- | 11 | 0.15 | Others | HCl | 20 | (7.) | Boiler | Briquette | 12 | 0.2 | NOx | | 50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 120 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | D.G Set -1 nos. of Cap. 200KVA, | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.0 | (b)Private Land (ha.) | 0.0 | (c)Government Land (ha.) | 0.0 | (d)Revenue Land (ha.) | 0.0 | (e)Other Land (ha.) | 0.7054 | Total Land (ha.) | 0.7054 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1149.41 | (b)Waste/Barren Land (ha.) | 0.000 | (c)Grazing/ Community Land (ha.) | 0.000 | (d)Surface Water Bodies (ha.) | 23190.39 | (e)Settlements (ha.) | 115.99 | (f)Industrial (ha.) | 472.58 | (g)Forest (ha.) | 2128.10 | (h)Mangroves (ha.) | 0.000 | (i)Marine Area (ha.) | 0.000 | (j)Others (ha.) : Open Land, Open Scrub Land, Fallow Land, Salt Pan | 6187.22 | Total (ha.) | 33243.69 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.2327 | | (2.) | Main Plant | | 0.0930 | Plant Building Area | (3.) | Built Up Area | | 0.2325 | Storage, security, utility, admin, ETP | (4.) | Others | parking, road & open | 0.1472 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | -- | 00 | -- | (2.) | WLS | -- | 00 | -- | (3.) | NPA | -- | 00 | Not applicable | (4.) | ESAs | -- | 00 | Not applicable | (5.) | ESZs | -- | 00 | Not applicable | (6.) | Corridors | -- | 00 | Not applicable | (7.) | Wildlife Corridors | -- | 00 | Not applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | -- | 00 | Not applicable | (2.) | Defence Installations | | -- | 00 | Not applicable | (3.) | Forest | | -- | 0 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 00 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | 00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 45 | (c)Temporary Employment- During Construction | 20 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 26 | (f)Total Manpower | 65 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.2327 | (b)Percentage of Total Project Area | 32.99 | (c)No. of Plants to be Planted | 50 | (d)Funds Allocated for Plantation | 400000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Unit will do CER activity of 2.5 of total project cost. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 000 | (ii)Name of the EIA Consultant | M/s. Jyoti Om Chemical Research Centre Pvt. Ltd. | (iii)Address | F-11 Surajmoti complex, near high tension road subhanpura, Nr Hariom Nagar | (iv)Mobile No. | 9824150383 | (v)Landline No. | 0264622029 | (vi)Email Id | info@jyotiom.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 Apr 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please confirm whether the proposed products are technical grade pesticide and/or synthetic organic chemical to ascertain applicability of the EIA Notification, 2006. | 15 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 25 Feb 2019 | 3. | NA | As per the details provided, the project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006. Please submit your proposal accordingly to SEAC/SEIAA. | 03 Mar 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kanhaiya Gupta | Designation | Director | Name of Company (Applicant Name should not be given here) | MANBRO POLYMERS LIMITED | Address | Plot No :-D-2/CH-275, Industrial Estate Dahej 2, Dahej 2-392110.Dist:-Bharuch,Gujarat |
|