Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Pharmaceutical Ingredients and Specialty Chemicals manufacturing unit by Dynarx Technology (India) Limited
(b)Name of the Company / Organisation DYNARX TECHNOLOGY (INDIA) LTD
(c)Registered Address No 45 1st Floor Rajatha Nivasa Building Vasavi Temple Road VV Puram Bangalore,560004,Chikkaballapura,Karnataka-560004
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Abhilash KN
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address No 45 1st Floor Rajatha Nivasa Building Vasavi Temple Road VV Puram Bangalore,,Bangalore South,Bangalore Urban,Karnataka-560004
(d)Pin code 560004
(e)E-mail commercial@dynarx.com
(f)STD Code. 80(f)Telephone No. 41696007
(g)Fax No. 41305559
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/KA/IND2/82014/2018
(d)Master Proposal Number(Single Window) SW/94135/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No 23
(b)Pincode 561208
(c)Bounded Latitudes (North)
From
Degree 13.703127
Minutes
Second
From
Degree 77.504478
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 13.701646
Minutes
Second
From
Degree 77.503559
Minutes
Second
(e)Survey of India Topo Sheet No. 57G1/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 698
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.8
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)KarnatakaChikkaballapuraChikkaballapura
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/313/2018-IA-II(I)
(b)Date of Apply of TOR 17 Oct 2018
(c)Date of Issue of TOR / Standard ToR 18 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is located inside the notified KIADB i
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Boiler1.5 Tons per hr30meter chimnney
(2.)DG Set2 Nos X 160 KVA6 meter chimneey
(3.)Plot Area1.62Ha
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)L - Threonine methyl ester hydrochloride20Tons per AnnumRoad,Rail
(2.)3,5-Diiodosalicylic Acid35Tons per AnnumRoad,Rail
(3.)Chloro iodomethane2Tons per AnnumRoad,Rail
(4.)Iodine monochloride50Tons per AnnumRoad,Rail
(5.)5-Iodo-2-Methyl benzoic acid30Tons per AnnumRoad,Rail
(6.)PDHP50Tons per AnnumRoad,Rail
(7.)2-Butyl Benzofuran (BBF-I)50Tons per AnnumRoad,Rail
(8.)Diiodo methane5Tons per AnnumRoad,Rail
(9.)5-Amino-2,4,6-Triiodoisophthalic Acid25Tons per AnnumRoad,Rail
(10.)5-Amino-2,4,6-Triiodoisophthaloyl Dichloride25Tons per AnnumRoad,Rail
(11.)Iodobenzene12Tons per AnnumRoad,Rail
(12.)Starch Dialdehyde5Tons per AnnumRoad,Rail
(13.)5-Iodo-2-Chlorobenzoic acid30Tons per AnnumRoad,Rail
(14.)5-Bromo-2-Chlorobenzoic acid30Tons per AnnumRoad,Rail
(15.)L-Valine methyl ester hydrochloride50Tons per AnnumRoad,Rail
(16.)2-Butyl-3-(3,5-Diiodo-4-Hydroxy benzoyl) Benzofuran (BBF-II)50Tons per AnnumRoad,Rail
(17.)Diphenyl sulfide300Tons per AnnumRoad,Rail
(18.)2-Benzoyl benzoic acid5Tons per AnnumRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8.55
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.75
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 312
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 312
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Wood Briquette312Tons per AnnumIndiaRoad,Rail125 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 17 Oct 2018 To 17 Jan 2019
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube68.341.668.09100
(2.)SO2Micro Gram per Meter Cube21.55.919.980
(3.)PM2.5Micro Gram per Meter Cube35.110.833.9640
(4.)NOxMicro Gram per Meter Cube30.110.229.2280
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.917.336.58.5
(2.)TDSmg/l9826755002000
(3.)Total Hardnessmg/l588280300600
(4.)Fluoridemg/l1.510.3811.5
(5.)TSSmg/l10101010
(6.)Chloridesmg/l2011252501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l6.53.5C
(2.)CODmg/l3825C
(3.)DOmg/l4.63.5C
(4.)pHNA7.557.42B
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.337.875
(2.)Leq(Night)A-weighted decibels(dB(A))42.729.370
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.877.17
(2.)N(Nitrogen)Kilogram per hectare638437
(3.)P(Phosphorus)Kilogram per hectare20050
(4.)K(Potassium)Kilogram per hectare26445
(5.)Electric ConductivityMillisiemens per Centimetre10366
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.7 To 2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 2.2
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersKIADB551Copy of Permission LetterPipelineOthersTanker/Pipeline2767/18-1903 Sep 201860
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process water-HTDS625ETPReuse within the Plant & Recycling,Green Belt Renewal Plant6
(2.)Process Water -LTDS425MEE ATFD ROReuse within the Plant & Recycling,Green Belt Renewal Plant4
(3.)Floor and Equipment washing3.725ETPReuse within the Plant & Recycling,Green Belt Renewal Plant3.7
(4.)Cooling tower make up2.64525ETPReuse within the Plant & Recycling,Green Belt Renewal Plant2.645
(5.)Domestic1.710STPReuse within the Plant & Recycling,Green Belt Renewal Plant1.7
(6.)Boiler Feed make and condensate4.7756softenerReuse within the Plant & Recycling,Green Belt Renewal Plant4.775
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 22.82
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 22.82
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Inorganic wastePlastic Waste3Tons5RoadAuthorized Recyclers
(2.)Bottom AshBottom Ash74Tons3RoadAuthorized Recyclers
(3.)Organic wasteMunicipal Solid Waste4Tons0Otherswithin siteCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube21.490.72.423.8980
(2.)NOxMicrogram per Meter Cube29.90.65.835.780
(3.)PM10Microgram per Meter Cube68.30.91.669.9100
(4.)PM2.5Microgram per Meter Cube35.050.71.436.4540
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBriquests/wood300.45SO20.5134
(2.)DG SetDiesel60.2SO20.0012
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 400
(b)Source KPTCL Via KIADB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 160 KVA 2 No
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.62
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.62
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 1.62
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 1.62
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.4869
Total (ha.) 0.4869
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNONE0NONE WITH IN 10 KM RADIUS
(2.)Critically Polluted AreaNONE0NONE WITH IN 10 KM RADIUS
(3.)ESZsNONE0NONE WITH IN 10 KM RADIUS
(4.)CorridorsNONE0NONE WITH IN 10 KM RADIUS
(5.)NPANONE0NONE WITH IN 10 KM RADIUS
(6.)ESAsNONE0NONE WITH IN 10 KM RADIUS
(7.)Wildlife CorridorsNONE0NONE WITH IN 10 KM RADIUS
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNONE0NONE WITH IN 10 KM RADIUS
(2.)Archaeological SitesNONE0NONE WITH IN 10 KM RADIUS
(3.)Defence InstallationsNONE0NONE WITH IN 10 KM RADIUS
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.62
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Sale deed attched
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 1
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 9
(d)Temporary Employment- During Operation 10
(e)No. of working days 300
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.5346
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 900
(d)Funds Allocated for Plantation 350000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant Consultant has a stay order vide writ petition No.15026 -15038/2016(GM-RES) v/s Union of India Repr
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAProposal is to be prepared and submitted through NABET accredited EIA consultant. 09 Feb 2019
2.NAThe correction have been made as per the instruction received 11 Feb 2019
3.NA- Applicability of general condition needs to be confirmed along with supporting documents. - Notification status of the KIADB Industrial area to ascertain the requirement of public hearing. 17 Feb 2019
4.NAThe correction have been made as per the instruction received 18 Feb 2019
5.NAProposal to be resubmitted after addressing our observations dated 17/2/2019 in totality. 24 Feb 2019
6.NAThe correction have been made as per the instruction received 24 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAbhilash KN
DesignationMD
Name of Company (Applicant Name should not be given here)DYNARX TECHNOLOGY (INDIA) LTD
AddressNo 45 1st Floor Rajatha Nivasa Building Vasavi Temple Road VV Puram Bangalore
Print