Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Dharashiv Sakhar Karkhana Ltd.
(b)Name of the Company / Organisation DHARSHIV SAKHAR KARKHANA LTD.
(c)Registered Address M/s. Dharashiv Sakhar Karkhana Ltd., Village Chorkhali, Tehsil Kalamb, Dist. Osmanabad, Maharashtra,M/s. Dharashiv Sakhar Karkhana Ltd., Village Chorkhali, Tehsil Kalamb, Dist. Osmanabad, Maharashtra,Osmanabad,Maharashtra-413405
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Amar Dhananjay Patil
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address M/s. Dharashiv Sakhar Karkhana Ltd., Village Chorkhali, Tehsil Kalamb, Dist. Osmanabad, Maharashtra,M/s. Dharashiv Sakhar Karkhana Ltd., Village Chorkhali, Tehsil Kalamb, Dist. osmanabad, Maharashtra,Kalamb,Osmanabad,Maharashtra-413405
(d)Pin code 413405
(e)E-mail dharashivsugar@yahoo.co.in
(f)STD Code. 0(f)Telephone No. 00
(g)Fax No. 00
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/94118/2018
(d)Master Proposal Number(Single Window) SW/94117/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gut No. 55,56,57,58
(b)Pincode 413405
(c)Bounded Latitudes (North)
From
Degree 1822
Minutes
Second
From
Degree 1823
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 7550
Minutes
Second
From
Degree 7651
Minutes
Second
(e)Survey of India Topo Sheet No. 0
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 600
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number No.IA-J-11011/169/2018-IA-II(I)
(b)Date of Apply of TOR 12 May 2018
(c)Date of Issue of TOR / Standard ToR 17 Jun 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :13 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :0
Dharashiv Sakhar Karkhana Ltd., Gat No. 55,56,57,58, Village Chorakhali, Tehsil Kalamb, Dist. Osmanabad, Maharashtra
State :Maharashtra
District :Osmanabad
Tehsil :Kalamb
Village :Chorakhali
1101. Weather the local people suffer due to pollution problem after commissioning of the project 2. Which type of mitigation measures will be taken if there is a pollution for the said project. 3District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Molasses based distillery Unit45KLPD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Molasses based Distillery45Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NIL
(vi)Application No. NIL
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 72.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 5.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.684
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulfuric Acid0.045Kilo Litre per DayOpen MarketRoad150 Open MarketCopy of Linkage
(2.)Molasses as raw material for distillery67680Tons per Annumin house and near by industryRoad,Pipe Conveyor60 MoUCopy of Linkage
(3.)Turkey red oil0.26Kilo Litre per DayOpen MarketRoad150 Open MarketCopy of Linkage
(4.)Nutrients0.009Kilo Litre per DayOpen MarketRoad150 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 01 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube685368100
(2.)SO2Micro Gram per Meter Cube29172880
(3.)PM2.5Micro Gram per Meter Cube55225560
(4.)NOxMicro Gram per Meter Cube37213780
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l0.0660.0311.5
(2.)TDSmg/l10769885002000
(3.)pHNA7.67.26.58.5
(4.)Total Hardnessmg/l511482200600
(5.)TSSmg/l0000
(6.)Chloridesmg/l2332132501000
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA87.2E
(2.)CODmg/l1615E
(3.)DOmg/l5.63.8B
(4.)BODmg/l53E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.241.275 Industrial and 55 Residential
(2.)Leq(Night)A-weighted decibels(dB(A))59.429.570 Industrial and 45 Residential
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.97.2
(2.)N(Nitrogen)Kilogram per hectare35.731.4
(3.)K(Potassium)Kilogram per hectare42.539.5
(4.)Electric ConductivityMillisiemens per Centimetre0.280.1
(5.)P(Phosphorus)Kilogram per hectare18.410.4
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.32 To 4.77
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.5 To 4
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4582.15Copy of Permission LetterPipelineJack Well3966603 Apr 2019555.55
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process355500Primary + Secondary +TertiaryReuse within the Plant & Recycling,Green Belt Renewal Plant355
(2.)cooling purpose59500Primary + Secondary +TertiaryReuse within the Plant & Recycling59
(3.)Boiler12500Primary + Secondary +TertiaryReuse within the Plant & Recycling12
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 426
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 426
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)BiogasIndustrial Waste9528Tons10RoadOthersGiven as manure to nearby farmers
(2.)fly AshFly Ash75Tons0.5RoadOthersBio composting and supplied to brick manufacturing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube53.2410.7654.280
(2.)SO2Microgram per Meter Cube19.9616.526.5080
(3.)NOxMicrogram per Meter Cube21.9910.2122.2380
(4.)PM10Microgram per Meter Cube53.2410.7654.2100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler (15 TPH)Baggase602.0PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 26.30
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 26.30
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 7857.72
(b)Waste/Barren Land (ha.) 7351.47
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 820.95
(e)Settlements (ha.) 762.44
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow land scrub land 14693.64
    Total (ha.) 31486.22
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant2.02for process
(2.)OthersPollution control facility8.09for Pollution control facility
(3.)Green belt10.11Green belt development
Total (ha.) 20.22
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNA0No ESAs within 10 Km radius
(2.)CorridorsNA0No Corridors within 10 Km radius
(3.)Wildlife CorridorsNA0No wildlife corridors within 10 Km radius
(4.)ESZsNA0No ESZs within 10 Km radius
(5.)NPANA0No NPA within 10 Km radius
(6.)Critically Polluted AreaNA0No critically polluted area within 10 Km radius
(7.)WLSYedashi Ramling Wild life santuary8.5As per Yedshi sanctuary map, our project site is located away from Eco sensitive Zone ,thus there no requirement to obtained NOC from wild life division.
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0No Archiological sites within 10 Km radius
(2.)Defence InstallationsNA0No Defense installation within 10 Km radius
(3.)ForestNA0No Forest within 10 Km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.30
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired In hand
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 95
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 20
(e)No. of working days 210
(f)Total Manpower 115
32.
Green Belt in Ha:
(a)Total Area of Green Belt 10.11
(b)Percentage of Total Project Area 38.44
(c)No. of Plants to be Planted 33149
(d)Funds Allocated for Plantation 0.45
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmentalgreening area will be increase
(2.)SocialEmployment Generation will be generate for near by people
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. (QCI/NABET Accredited Vide S. No. 140,Dated 15.06.
(ii)Name of the EIA Consultant M/s. Sri Sai Manasa Nature Tech Pvt. Ltd.
(iii)Address Plot No. 74/A, Flat No 102, Central Bank Building Kalyan Nagar, Hyderabad 500038
(iv)Mobile No. 9010529529
(v)Landline No. 0402316333
(vi)Email Id ssmntpl@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 19 Jul 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPublic hearing proceedings not attached/uploaded against column 7.1 of Form-2. Also, please provide firm commitment of the concerned regulatory authority (in English) to allow surface water requirement of 458 cum/day. 23 Mar 2019
2.NAThe correction have been made as per the instruction received 05 Apr 2019
3.NAThe correction have been made as per the instruction received 05 Apr 2019
4.NAPlease reply to the observations dated 23/3/2019 for further consideration of the proposal. 13 Apr 2019
5.NAThe correction have been made as per the instruction received 26 Apr 2019
6.NAPlease reply to our observations dated 23/3/2019, reiterated on 13/4/2019, for consideration of the proposal. 04 May 2019
7.NAThe correction have been made as per the instruction received 18 May 2019
8.NAPlease inform/clarify the following:- - Yedashi Ramling WLS is within 10 km from the project site. In such a case, no requirement of permission from the Standing Committee of NBWL needs to be confirmed. - Entries against items 14.1 & 18.1 (regarding air quality) of Form-2 are not consistent. PM10 & PM2.5 values are reported to be same at 53.24 ug/m3, which requires revisiting of the whole exercise. 25 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAmar Dhananjay Patil
DesignationMD
Name of Company (Applicant Name should not be given here)DHARSHIV SAKHAR KARKHANA LTD.
AddressM/s. Dharashiv Sakhar Karkhana Ltd., Village Chorkhali, Tehsil Kalamb, Dist. Osmanabad, Maharashtra
Print