Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion in Limestone Production capacity from 0.279 Million TPA to 2.80 Million TPA, OB/IB 0.49 million TPA & Mineral reject 0.25 million TPA and installation of Crusher of 1200 TPH in RAS-
(b)Name of the Company / Organisation AMBUJA CEMENT LIMITED
(c)Registered Address 228. Udyog Vihar, Phase-I,Gurgaon,Gurgaon,Haryana-122016
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjeew Kumar Singh
(b)Designation (Owner/ Partner/ CEO) Manager - Environment
(c)Address 228, Udyog Vihar, Phase-I,,,Gurgaon,Haryana-122016
(d)Pin code 122016
(e)E-mail sanjeewkumar.singh@adani.com
(f)STD Code. 124(f)Telephone No. 4565328
(g)Fax No. 01244531180
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/RJ/MIN/93774/2011
(d)Master Proposal Number(Single Window) SW/93460/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Enclosed with EIA Report
(b)Pincode 306709
(c)Bounded Latitudes (North)
From
Degree 26231275
Minutes
Second
From
Degree 26241661
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74132632
Minutes
Second
From
Degree 74143549
Minutes
Second
(e)Survey of India Topo Sheet No. G43I7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 505
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)RajasthanPaliJaitaranSewariya, Bhaktawarpura, Dhaneriya, and Kotadiya
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number NA
(b)Date of Apply of TOR NA
(c)Date of Issue of TOR / Standard ToR NA
(d)Date of Apply of EC NA
(e)Date of Issue of EC NA
(f)Previous TOR Letter NA
(g)Previous EC Letter NA
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :19 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Oct 2018
Distance of Public Hearing Venue from the Proposed Project :4
Atal Sewa Kendra, Gram Panchayat, Kudki, Tehsil- Jaitaran, District Pali, State Rajasthan
State :Rajasthan
District :Pali
Tehsil :Jaitaran
Village :Kurki
168Issues raised during pulic hearing were about Social Development in the nearby area, Environment, Employment, Construction of Road & Gaushala, Skill Development, Water facilities etc.District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/ENV/R/IND-132/836/2012/234
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 11 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limestone Capacity0.2792.5212.8Othersmillion TPARoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Ras I Limestone Mine0.279 million tpa2.521 million TPA2.80 million TPA limestone & crusher 1200 TPH
(2.)CAT-3493.25 cum00
(3.)IR-CM-341115 mm dia00
(4.)Water tanker12000 lit20 kl20 kl
(5.)Excavator05.5 cum5.5 cum
(6.)Drill0115 mm dia115 mm dia
(7.)Motor grader011
(8.)Compactor.11
(9.)Diesel Tanker010 kl10 kl
(10.)Explosive van010 t10 t
(11.)Dumper050 Tonner50 tonner
(12.)Hydraulik Rock breaker1 (Atlas Corpo)20-25 tonner20-25 tonner
(13.)Tipper16 tonner00
(14.)Loader-20212.50 cum5 m35m3
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 03 May 2016
(iv)Valid Upto 31 Jul 2018
(v)File No. F (Mines)/Pali(Jaitaran)/82 (1)/2016-2017/811-816
(vi)Application No. 2016-2017/Mines/7007
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 85
(b) Funds Allocated for Environment Management (Capital) (in Crores) 7.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.85
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 2.521
(b)Existing quantity of raw material/fuel 0.279
(c)Total quantity of raw material/fuel 2.8
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel150000Kilo Litre per DayBhatinda PunjabRoad950 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube85.949.085.16100
(2.)PM2.5Micro Gram per Meter Cube46.019.545.4760
(3.)SO2Micro Gram per Meter Cube12.66.012.4680
(4.)NOxMicro Gram per Meter Cube20.88.220.5480
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Fluoridemg/l1.320.311.01.5
(2.)Chloridesmg/l504.86179.782501000
(3.)TDSmg/l13501485002000
(4.)Heavy MetalsOthersNA....
(5.)TSSmg/l....
(6.)pHOthers.7.527.386.88.5
(7.)Total Hardnessmg/l924268200600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.676.86D
(2.)BODmg/l22.8016.20D
(3.)CODmg/l65.8057.20D
(4.)DOmg/l5.705.40D
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))49.543.1I:70-75, C:55-65, R:45-55, S:40-50
(2.)Leq(Day)A-weighted decibels(dB(A))62.653I-70-75, C-55-65, R: 45-55, S:40-50
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare248.87124.36
(2.)Electric ConductivityOthersµs/cm0.490.29
(3.)P(Phosphorus)Kilogram per hectare281.7821.20
(4.)pHOthers.7.757.22
(5.)K(Potassium)Kilogram per hectare260.40191.72
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 04.5 To 37.3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 33.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater1201.5Copy of Permission LettermodeOthersWater tanker/PipelineOthersBore wells21-4/3398/RJ/MIN/201726 Oct 2017120
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Utility22Soak Pit via septic tankOthersDust Suppression and Plantation02
(2.)Workshop78Oil & water seperatorOthersDust Suppression and Plantation70
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9
(b)Total Discharged Water (Kilolitre per Day) 2
(c)Total Reused Water (Kilolitre per Day) 7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mineral RejectOthersMine waste250000Tons0OthersHaul RoadOtherswill be dump within lease area
(2.)OB/IBOthersMine waste490000Tons0OthersHaul RoadOtherswill be dump within lease area
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube20.804.0424.8580
(2.)PM10Microgram per Meter Cube81.303.8185.12100
(3.)SO2Microgram per Meter Cube12.603.5316.1480
(4.)PM2.5Microgram per Meter Cube41.7.1.1642.8760
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)crusherpower35.1490PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1500
(b)Source Rajasthan State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 35.149
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.10
(c)Government Land (ha.) 180.43
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 183.53
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 180.43
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Pvt Land 3.10
    Total (ha.) 183.53
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0
(2.)Township0
(3.)Green belt26.0
(4.)Ash Pond0
(5.)OB Dump Area26.75
(6.)Safety Zone0
(7.)Tailing Pond0
(8.)LandFill0
(9.)Quarry Area77.53Will be converted into water reservoir
(10.)Water Reservoir0
(11.)Desalination Plant0
(12.)Area for Solid Waste Management0
(13.)Built Up Area2.30
(14.)OthersROad 1.50 ha, Undisturbed area 49.45 ha50.95
Total (ha.) 183.53
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone.No ESA within 10 km of mine site
(2.)CorridorsNone.No Corridors within 10 km of mine site
(3.)NPANone.No NPA within 10 km of mine site
(4.)ESZsNone.No ESZ within 10 km of mine site
(5.)Critically Polluted AreaNone0No CPA within 10 km of mine site
(6.)WLSNone.No Wildlife Sanctuary with in 10 km of mine site
(7.)Wildlife CorridorsNone.No Wildlife corridors with in 10 km of mine site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPagara Block reserved Forest8.0.
(2.)Archaeological SitesNone..
(3.)Defence InstallationsNone..
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) .
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 180.43
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 3.10 ha land will not be purchased. Entire work wi
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 4
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Monitor lizard & Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 10 Lac
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. No./F() DCF/Survey/2018-19/3681
(iii)Date of issue 02 Jul 2018
(iv)Recommendation None
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area The area is devoid of perennial streams/rivers. A few nallas cut their course through alluvial formations. Protection measures are being/ will be taken to protect the nallah.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Sukri Nadi
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 4.0
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 8
(b)Permanent Employment-During Operation 70
(c)Temporary Employment- During Construction 92
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 170
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt04.04
(2.)Percentage of Total Project Area02.172.17
(3.)No. of Plants080008000
(4.)Funds Allocated0800000800000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenbelt/Plantation will be done within lease area which will enhance esthetic beauty of the area
(2.)SocialEmployment will be generated due to project
(3.)FinancialRevenue generation will be done due to the project
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) Limestone 2.80 million TPA, OB/IB 0.49 million TPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 584(4)(3)(1739)/2018 RCM-AJM/787-790
(b)Date of Approval 07 Jun 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 183.53
(f)Approved Capacity 2800000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 137.74 million Tonnes (As on 01.04.18)
(b)Mineable Reserves (Million Ton) 125.25 million Tonnes (As on 01.04.18)
(c)Extractable Reserves(Million Ton) 125.25 million tonnes (As on 01.04.18)
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral Cement Grade
(f)Stripping Ratio 1 : 0.30
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) None
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 48
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)11200 -
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 183.53
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease has already been granted
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Lease trasfer from Gujarat Ambuja to Ambuja Cement
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease trasfer from Gujarat Ambuja to Ambuja Cement
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 26.75
(iii)Height (in meter) 10
(iv)Quantity (in Million Cubic meter) 2.6
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 77.53
(b)Depth (in meter) 9
(c)Volume (in Million Cubic meter) 56
12.
Details of Quarry:
(a)Final Void of 77.53 (hectare) at a Depth of 9 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 183.53
13.
Details of Transportation:
(a)In Pit/Underground to Surface By dumpers
(b)Surface to Siding/Loading By excavator
(c)Transportation / Conveyor Details by road
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND000
(2.)FOREST LAND000
(3.)GRAZING LAND000
(4.)OTHERS(Specify)Pvt Land3.1003.1
(5.)WASTE LAND180.430180.43
(6.)SURFACE WATER BODIES000
(7.)SETTLEMENTS000
TOTAL183.530183.53
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY077.53077.53
(2.)TOP SOIL STORAGE0000
(3.)EXTERNAL OB DUMPS0000
(4.)ROADS001.501.5
(5.)BUILT UP AREA (COLONY/OFFICE)002.302.3
(6.)GREEN BELT260026
(7.)VIRGIN AREA0049.4549.45
(8.)INTERNAL OB DUMPS26.750026.75
(9.)Other.0000
TOTAL52.7577.5353.250183.53
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 26.75
(c)Quarry(in hectare) 183.53
(d)Safety Zone(in hectare) 26
(e)Final Void of 77.53 (hectare) at a Depth of 9 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2000
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 80
(h)Total afforestation plant (in hectare) 52.75
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan 0
Total Area Excavated (in hectare) 8.92
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)2013140.2790.2790.2780.160
(2.)2016170.2790.2790.2780.230
(3.)2017180.2790.2790.2790.050
(4.)2012130.2790.2790.2780.0060
(5.)2014150.2790.2790.2780.230
(6.)2015160.2790.2790.2780.250
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt Ltd
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram Haryana-122001
(iv)Mobile No. 9509267011
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjeew Kumar Singh
DesignationManager - Environment
Name of Company (Applicant Name should not be given here)AMBUJA CEMENT LIMITED
Address228, Udyog Vihar, Phase-I, Gurgaon, Haryana - 122016
Print