Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Group Housing
(b)Name of the Company / Organisation WELLWORTH REALTECH LLP
(c)Registered Address 1497 BHARDWAJ BHAWAN, KOTLA, MUBARAKPUR,,New Delhi,Delhi-110003
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant SUMIT GUPTA
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 1497 BHARDWAJ BHAWAN, KOTLA, MUBARAKPUR,,Connaught Place,New Delhi,Delhi-110003
(d)Pin code 110003
(e)E-mail rakesh.naukwal@gmail.com
(f)STD Code. 11(f)Telephone No. 98186232
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/93650/2019
(d)Master Proposal Number(Single Window) SW/93646/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 533/1 & 533/2
(b)Pincode 110074
(c)Bounded Latitudes (North)
From
Degree 3150644.84
Minutes
Second
From
Degree 3150690.66
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 713859.86
Minutes
Second
From
Degree 714055.08
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/03
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 264
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.06
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project belongs to category B2, Schedule 8 (a)
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Main Dwelling Unit115It is a Group Housing
(2.)Servant Unit44It is a Group Housing
(3.)EWS unit82It is a Group Housing
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total Plot area1.0871HectaresOthersNA
(2.)Net planned Area0.9971HectaresOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 106
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.97
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.59
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.122
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)NA0OthersNA0OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Jan 2019 To 22 Jan 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube226.25200.25200.25100
(2.)PM2.5Micro Gram per Meter Cube133.85116.85116.8560
(3.)SO2Micro Gram per Meter Cube7.656.46.480
(4.)NOxMicro Gram per Meter Cube41.234.234.280
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l756.7756.75002000
(2.)Heavy MetalsLeadmg/l000.010.01
(3.)Chloridesmg/l112112250250
(4.)TSSNA0000
(5.)pHNA7.37.36.58.5
(6.)Total Hardnessmg/l228228200200
(7.)Fluoridemg/l0.450.4511
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l00A
(2.)CODmg/l00B
(3.)BODmg/l00A
(4.)pHmg/l00A
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.756.755
(2.)Leq(Night)A-weighted decibels(dB(A))50.950.945
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram72.472.4
(2.)pH8.218.21
(3.)Electric ConductivityOthersmicrosiemens per Centimeter385.8385.8
(4.)P(Phosphorus)Milligram per Kilogram12.812.8
(5.)K(Potassium)Milligram per Kilogram42.642.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.05 To 6.44
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25.05 To 6.11
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMunicipal Supply830.1Copy of Permission LetterPipelineOthersMunicipal SupplyNone01 Feb 201985
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing & Misc112135STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersLoss 11 KLD6943
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 112
(b)Total Discharged Water (Kilolitre per Day) 43
(c)Total Reused Water (Kilolitre per Day) 69
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non biodegradableMunicipal Solid Waste46Tons0.1RoadAuthorized Recyclers
(2.)Plastic WastePlastic Waste15Tons0.1RoadAuthorized Recyclers
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.08Kilolitre1.0RoadAuthorized Recyclers
(4.)E-wasteE Waste0.024Tons1.0RoadAuthorized Recyclers
(5.)BiodegradableMunicipal Solid Waste92Tons0OthersNAOthersOrganic Waste Convertor
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube226.250.81.11227.37100
(2.)NOxMicrogram per Meter Cube41.20.82.9844.1980
(3.)SO2Microgram per Meter Cube7.650.80.5538.20480
(4.)PM2.5Microgram per Meter Cube133.850.80.625134.47660
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG Sets (3 x 1010)Low Sulfur Diesel840.40PM100.034
(2.)DG Sets (3 x 1010)Low Sulfur Diesel840.40NOx0.228
(3.)DG Sets (3 x 1010)Low Sulfur Diesel840.4SO20.12
(4.)DG Sets (3 x 1010)Low sulfur Diesel840.40OthersPM 2.50.013
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3400
(b)Source BSES
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3 x 1010 KVA
(e)Stack Height (in m) 84
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1.0871
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1.0871
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot Area 1.0871
    Total (ha.) 1.0871
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersTotal Plot Area1.0871
Total (ha.) 1.0871
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0Not applicable
(2.)ESAsNone0Not applicable
(3.)CorridorsNone0Not applicable
(4.)NPAAsola Wildlife Sanctuary0.94It is in SEE direction from project boundary
(5.)ESZsAsola Wildlife Sanctuary0.94It is in SEE direction
(6.)WLSAsola Wildlife Sanctuary0.94It is in SEE direction from project boundary
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsArjangarh AirForce station4.45It is in SW Direction of the project site.
(2.)ForestForet near Aya Nagar extension6.88It is in west direction of the site.
(3.)Archaeological SitesQutab Archaeological area6.55It is in NW direction of the project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 6
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.0871
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Indian Peafowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Drain near Project Site
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 0.06
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 190
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.3331
(b)Percentage of Total Project Area 30.64
(c)No. of Plants to be Planted 124
(d)Funds Allocated for Plantation 1200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental3331.69 Sqm of green area will be developed.
(2.)SocialEmployment will be generated.
(3.)FinancialRevenue will be generated.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 78
(b)Total No. of Flats to be Build 197
(c)No. of Buildings 2
(d)Total plot area (sqm) 10871.05
(e)Total built up area (sqm) 42253.97
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 91.56
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 440
5.
Energy Saving Measures:
(a)Source/Mode Solar
(b)Percentage 1
(c)Quantity 34
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact on Water Bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Revision no. 72, serial No 117 January 2019
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address Perfact Group, 5th floor,Front wing,NN Mall,Sector-3,Rohini,New Delhi-110085
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSUMIT GUPTA
DesignationPartner
Name of Company (Applicant Name should not be given here)WELLWORTH REALTECH LLP
Address1497 BHARDWAJ BHAWAN, KOTLA, MUBARAKPUR
Print