Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Amendment in Environmental Clearance under the provision of Section 7(ii) of EIA Notification 2006 with respect to increase of Bagatpura residential colony from 599 to 1028 units (Built-up area from
(b)Name of the Company / Organisation SHREE CEMENT EAST PRIVATE LIMITED
(c)Registered Address 21, Strand Road, Kolkata,,Kolkata,West Bengal-700001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr Anil Kumar Trivedi
(b)Designation (Owner/ Partner/ CEO) Authorized Signatory
(c)Address 21, Strand Road Road, Kolkata,,Kolkata,Jhunjhunu,Rajasthan-700001
(d)Pin code 700001
(e)E-mail sceplenv@shreecement.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND/93519/2019
(d)Master Proposal Number(Single Window) SW/93517/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 2549/1
(b)Pincode 306107
(c)Bounded Latitudes (North)
From
Degree 2904726
Minutes
Second
From
Degree 2905766
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 422430
Minutes
Second
From
Degree 423165
Minutes
Second
(e)Survey of India Topo Sheet No. 45 J/3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 394
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Lucknow
(iii)Letter No. IV/Env/R/Ind-175/971/2018/695
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 8 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Bagatpura Residential Colony5994291028OthersunitsOthersNot Applicable
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Bagatpura Residential Colony, Build-up Area in Sqm13676664383201149
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Aug 2017
(iv)Valid Upto 31 Jul 2022
(v)File No. G(CPM)/1000/2680(1)/2015-2016/4605-4607
(vi)Application No. 180542
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 104
(b) Funds Allocated for Environment Management (Capital) (in Crores) .55
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.02
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cement, AAC blocks, Steel, Bajri1Otherstonown cement plant and open marketRoad500 OthersOpen marketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 22 To 7
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater5000.5Copy of Permission LetterPipelineTube Well21-4(12)/WR/CGWA/2005-122012 Jul 20131000
(2.)GroundWater5000.5Copy of Permission LetterPipelineTube WellTS/21B(451A)/CGWA/WR/2008-281417 Feb 2019500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic Sewage303375STPOthersPlantation3003
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 303
(b)Total Discharged Water (Kilolitre per Day) 3
(c)Total Reused Water (Kilolitre per Day) 300
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Soild WasteMunicipal Solid Waste277.7Tons1.0RoadOthersOWC system (Organic Waste Composting System)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube9.89001.3211.1380
(2.)PM10Microgram per Meter Cube81503.2284.23100
(3.)PM2.5Microgram per Meter Cube00010
(4.)NOxMicrogram per Meter Cube26.39004.3030.780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000Others00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5049
(b)Source Own captive power plant and WHRS
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2 x 500 KVA
(e)Stack Height (in m) 4.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 40
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 40
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 25.50
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Green Area 14.5
    Total (ha.) 40
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township40No additional land will be required
Total (ha.) 40
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA-0No National park, Wildlife Sanctuary, Biosphere Reserve exisit within 10 KMS
(2.)ESAs-0No ESAs within 10 KMS
(3.)ESZs-0No ESZ within 10 KMS
(4.)Corridors-0No Corridors within 10 KMS
(5.)Critically Polluted Area-0No CPA within 10 KMS
(6.)Wildlife Corridors-0No Wildlife Corridors within 10 KMS
(7.)WLS-0No WLS within 10 KMS
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestReserved Forest4.23-
(2.)Defence Installations-0No Defense installation within 10 kms
(3.)Archaeological Sites-0no Archaeological site within 10 kms
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 40
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired already aquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Lilri River
(ii)Direction of Water Bodies in Buffer Area North
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 40
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt14.5014.5
(2.)Percentage of Total Project Area36.2036.2
(3.)No. of Plants35327035327
(4.)Funds Allocated350000003500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialDirect and indirect employment for local people in Colony
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant As proposal is for expansion of existing residential colony.
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Certified compliance report submitted along with the application is of July, 2017. Latest certified compliance report of RO shall be submitted. 2. Addendum to the earlier EIA/EMP report inter-alia including pollution load comparison, resources consumption, and pollution control measures etc has not been submitted. 04 Feb 2019
2.NAThe correction have been made as per the instruction received 23 Feb 2019
3.NACertified compliance report submitted along with the application is of July, 2017. Latest certified compliance report of RO shall be submitted. 08 Mar 2019
4.NAThe correction have been made as per the instruction received 26 Mar 2019
5.NA1. The proposal involves development of residential colony, which is not in the premises of the existing project boundary. 2. The proposed development is interlinked project for which application has to be submitted to the IA(Infrastructure)-III Division. 3. The water withdrawal permission shall be submitted along with application. 16 Apr 2019
6.NAThe correction have been made as per the instruction received 24 Apr 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr Anil Kumar Trivedi
DesignationAuthorized Signatory
Name of Company (Applicant Name should not be given here)SHREE CEMENT EAST PRIVATE LIMITED
Address21, Strand Road, Kolkata