|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Shree Limestone Mine from 8.6 Million TPA to 11.06 Million TPA Limestone Production with 3.42 Million TPA Inter-burden & Over-burden and 0.96 Million TPA Top Soil (ML No. 38/2007, ML. Are | (b)Name of the Company / Organisation | SHREE CEMENT EAST PRIVATE LIMITED | (c)Registered Address | 21, Strand Road, Kolkata,,Kolkata,West Bengal-700001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr Anil Kumar Trivedi | (b)Designation (Owner/ Partner/ CEO) | Authorized Signatory | (c)Address | 21, Strand Road Road, Kolkata,,Kolkata,Jhunjhunu,Rajasthan-700001 | (d)Pin code | 700001 | (e)E-mail | sceplenv@shreecement.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 2(b) Mineral beneficiation
| (b)Category | A | (c)Proposal Number | IA/CG/MIN/93467/2017 | (d)Master Proposal Number(Single Window) | SW/93438/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra Map is enclosed | (b)Pincode | 493113 | (c)Bounded Latitudes (North) | | From | | Degree | 213436 | Minutes | | Second | | From | | Degree | 213706 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 820312 | Minutes | | Second | | From | | Degree | 820612 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F44Q2, F44P14 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 277 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 25 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/07/2018-IA.II(M) | (c)Date of Issue of TOR | 06 Feb 2018 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 14 Mar 2019 | (c)Date of Issue of EC | 27 Aug 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 04 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 3.0 |
| Village Chandi Ground (Near Panchayat Bhawan) | State : | Chhattisgarh | District : | Balodabazar | Tehsil : | Simga | Village : | Chandi |
| 62 | Development of near by area, employment, water and environment etc | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-353/RON/2017-NGP/3998 dated 31.07/2018 and EC-3 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 15 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Area | 531.126 | 0 | 531.126 | Hectares(ha) | | Conveyor Belt,Others | none | (2.) | Limestone | 8.6 | 2.46 | 11.059999999999999 | Others | Million TPA | Conveyor Belt | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Drill Machine | 2 | 2 | 4 | | (2.) | Hydraulic Excavator | 3 | 4 | 7 | | (3.) | Explosive Ven | 1 | 1 | 2 | | (4.) | Diesel Tanker | 2 | 2 | 3 | | (5.) | Dumper | 12 | 9 | 21 | | (6.) | Water Tanker | 2 | 1 | 3 | | (7.) | Rock Breaker | 3 | 3 | 4 | | (8.) | Jeep | 1 | 1 | 2 | | (9.) | Crusher | 2X1200 TPH (Primary Crusher) | 2x450 TPA (Secondary Crusher) | 2*1200 TPH + 2*450 TPH | | (10.) | Motor Grader | 1 | 1 | 2 | | (11.) | Maintenance Van | 1 | 1 | 2 | | (12.) | ANFO Pump Truck | 1 | 1 | 2 | | (13.) | Soil Compactor | 2 | 0 | 2 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 13 Dec 2017 | (iv)Valid Upto | 12 Dec 2018 | (v)File No. | No. 5023/TS/CECB/2017 | (vi)Application No. | Application for renewal of CTO has been submitted | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 67.68 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.1 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 169.2 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.25 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 7140 | Others | Kilo Liter | Open Market | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 15 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 84.2 | 59.7 | 83.71 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 13.5 | 5.3 | 13.33 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 28.5 | 12.5 | 28.18 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 43.2 | 24.3 | 42.82 | 60 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.02 | 7.36 | 6.5 | 8.5 | (2.) | TSS | | | NA | | . | . | . | . | (3.) | TDS | | | mg/l | | 801 | 234 | 500 | 2000 | (4.) | Total Hardness | | | mg/l | | 552.29 | 216.46 | 200 | 600 | (5.) | Fluoride | | | mg/l | | 1.06 | 0.54 | 1 | 1.5 | (6.) | Chlorides | | | mg/l | | 181.41 | 11.40 | 250 | 1000 | (7.) | Heavy Metals | | Copper | mg/l | | 0.02 | 0.02 | 0.05 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.08 | 7.36 | E | (2.) | DO | | mg/l | | 5.0 | 4.4 | E | (3.) | COD | | mg/l | | 25.69 | 6.8 | E | (4.) | BOD | | mg/l | | 7.20 | 2.3 | E | |
14.4. No. of Ambient Noise monitoring locations : 15 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.6 | 49.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 58.8 | 49.5 | 70 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Kilogram per hectare | | 492.07 | 215.9 | (2.) | N(Nitrogen) | Kilogram per hectare | | 306.54 | 215.45 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 0.42 | 0.17 | (4.) | P(Phosphorus) | Kilogram per hectare | | 55.6 | 20.22 | (5.) | pH | | | 8.05 | 7.60 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 5 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4(36)/NCCR/CGWA/2008-2079 | (f)Date of Issue | 24 Oct 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 300 | 0.1 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4(36)/NCCR/CGWA/2008-2079 | 24 Oct 2018 | 3000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Workshop | 20 | 30 | Oil water separator | Others | Used in dust suppression | 20 | 0 | (2.) | Domestic & Utility | 10 | 20 | sock pit via septic tank | Others | sock pit via septic tank | 0 | 10 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 30 | (b)Total Discharged Water (Kilolitre per Day) | 10 | (c)Total Reused Water (Kilolitre per Day) | 20 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Waste (OB & IB) | Others | OB & IB | 3420000 | Tons | 0 | Others | Haul Road | Others | Backfilling and waste dump in ML area | (2.) | ToP Soil | Others | Top Soil | 960000 | Tons | 0 | Others | haul road | Others | Plantation & Green Belt Development | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 40.3 | 1.45 | 6.78 | 47.09 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 12.4 | 1.57 | 5.25 | 17.66 | 80 | (3.) | NOx | | Microgram per Meter Cube | 21.0 | 2.8 | 7.58 | 28.59 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 78.2 | 1.57 | 8.5 | 86.8 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Primary Crusher 2 | Power | 30 | 2 | PM10 | | 825 g/sec | (2.) | Secondary Crusher 1 | Power | 15 | 1.5 | PM10 | | 458 g/sec | (3.) | Secondary Crusher 2 | Power | 15 | 1.5 | PM10 | | 458 g/sec | (4.) | Primary Crusher 1 | Power | 30 | 2 | PM10 | | 825 g/sec | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 4760 | (b)Source | Existing & Proposed 125 MW CPP 100 MW WHRS | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 452.404 | (c)Government Land (ha.) | 78.722 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 531.126 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 452.404 | (b)Waste/Barren Land (ha.) | 78.722 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 531.126 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | OB Dump Area | | 21 | Waste Dump stabilized by plantation | (2.) | Water Reservoir | | 319.2 | | (3.) | Township | | 22 | | (4.) | Green belt | | 77.8 | 9.3 ha - green belt, 68.5 ha on virgin area | (5.) | Area for Solid Waste Management | | 70 | 70 ha - back filled and reclaimed by plantation | (6.) | Others | Undisturbed Area | 21.126 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | No CPA within 10 radius of Mine Site | (2.) | WLS | None | 0 | No WLS within 10 radius of Mine Site | (3.) | NPA | None | 0 | No NPA within 10 radius of Mine Site | (4.) | Corridors | None | 0 | No Corridors within 10 radius of Mine Site | (5.) | Wildlife Corridors | None | 0 | No Wildlife Corridors within 10 radius of Mine Site | (6.) | ESAs | None | 0 | No ESZs within 10 radius of Mine Site | (7.) | ESZs | None | 0 | No ESZs within 10 radius of Mine Site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Dhabadih Reserve Forest | 0.25 | Proper Protection measures will be taken | (2.) | Defence Installations | | None | 0 | No Defense installation within 10km radius | (3.) | Archaeological Sites | | None | 0 | No Archaeological site within 10km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 449.846 | (b)Land yet to be acquired(Ha) | 2.558 | (c)Status of Land acquisition if not acquired | 78.772 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Mahanadi Canal | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.05 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 20 | (b)Permanent Employment-During Operation | 195 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 340 | (f)Total Manpower | 215 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 56.35 | 119.65 | 176 | (2.) | Funds Allocated | 43 | 25 | 68 | (3.) | No. of Plants | 139186 | 300814 | 440000 | (4.) | Percentage of Total Project Area | 10.60 | 22.52 | 33.12 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | The Project will contribute additional revenue to the State and Central Govt. in the form of royalty, cess and other taxes etc. | (2.) | Environmental | • At the conceptual stage total excavated area will be 389.2 ha out of which 319.2 ha area will be converted into water reservoir and 70 ha area will be backfilled. The water reservoir will be helpful for recharge of ground water.
• At end of life of mine, about, total greenbelt/Plantation will be done on 176 ha (70 ha on backfilled area and 21 ha area on waste dump, 7.2 ha in colony area, 9.3 ha on 7.5 m barrier zone & 68.5 ha on virgin area) which will be beneficial to the environment & will p | (3.) | Social | • M/s. Shree Cement Limited is undertaking/ will undertake activities for the upliftment of the social community through community development in various ways as under:
? Education Promotion Program
? Health & Family Welfare Programme
? Infrastructure Development
? Social Welfare& Skill Development Activities
? Sustainable Livelihood | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 14.48 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | Balodabazar/ Chup/MP-1125/2017/717 | (b)Date of Approval | 30 Nov 2017 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 531.126 | (f)Approved Capacity | 11.6 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 237.9 | (b)Mineable Reserves (Million Ton) | 208.6 | (c)Extractable Reserves(Million Ton) | 208.6 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Cement Grade | (f)Stripping Ratio | 1 : 0.4 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 45 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 20 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 4 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 1200 | Primary Crusher | (2.) | 2 | 1200 | Primary Crusher | (3.) | 3 | 450 | Secondary Crusher | (4.) | 4 | 450 | Secondary Crusher | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 531.126 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 25 Mar 2008 | (iii)Validity of LOI | 50 | (iv)Reference No. of LOI | F 2-32/2003/12(3) | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 531.126 | (iii)Validity of the lease deed | From : 11 Jan 2011 To : 10 Jan 2061 | (iv)Date of Execution of Mining Lese | 11 Jan 2011 | (v)Reference Number | Government order no. F-2/32/2003/12 (3) | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | lase valid upto 2061 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 21 | (iii)Height (in meter) | 30 | (iv)Quantity (in Million Cubic meter) | 4.8 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 1.58 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 1.58 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 70 | (b)Depth (in meter) | 80 | (c)Volume (in Million Cubic meter) | 56 | |
|
12. | Details of Quarry: | (a)Final Void of 319.2 (hectare) at a Depth of 80 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 389.2 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | from working face to crusher hopper will be carrie | (b)Surface to Siding/Loading | Loading will be done by Hydraulic Excavators | (c)Transportation / Conveyor Details | Crusher to Cement plant by Covered Conveyor Belt | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (2.) | AGRICULTURE LAND | | 452.404 | 0 | 452.404 | (3.) | WASTE LAND | | 78.722 | 0 | 78.722 | (4.) | FOREST LAND | | 0 | 0 | 0 | (5.) | GRAZING LAND | | 0 | 0 | 0 | (6.) | SETTLEMENTS | | 0 | 0 | 0 | |
TOTAL | 531.126 | 0 | 531.126 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 70 | 319.2 | 0 | | 389.2 | (2.) | BUILT UP AREA (COLONY/OFFICE) | | 7.2 | 0 | 14.8 | | 22 | (3.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (4.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (5.) | ROADS | | 0 | 0 | 0 | | 0 | (6.) | INTERNAL OB DUMPS | | 21 | 0 | 0 | | 21 | (7.) | Other | Undisturbed Area | 0 | 0 | 21.126 | | 21.126 | (8.) | VIRGIN AREA | | 68.5 | 0 | 0 | | 68.5 | (9.) | GREEN BELT | | 9.3 | 0 | 0 | | 9.3 | |
TOTAL | 176 | 319.2 | 35.926 | 0 | 531.126 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 21 | (c)Quarry(in hectare) | 389.2 | (d)Safety Zone(in hectare) | 9.3 | (e)Final Void of 319.2 (hectare) at a Depth of 80 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | . | (h)Total afforestation plant (in hectare) | 176 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 201516 | 4.8 | 4.8 | 4.3 | 1.98 | 0 | (2.) | 201617 | 4.8 | 4.8 | 4.3 | 2.99 | 0 | (3.) | 201718 | 8.6 | 8.6 | 8.82 | 4.11 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J.M. EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001 | (iv)Mobile No. | 9509267011 | (v)Landline No. | 0124414192 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | (i) Details of TOR /EC has not uploaded as S. no. 6 of Form 2.
(ii) Copy of certified compliance report has not uploaded
(iii) Details of past production of mine since its inception, duly authenticated by Department of Mines & Geology, State Government.
(iv) The details of with respect to heavy metal in S. No. 14.2 of Form 2.
(v) Copy of valid CGWA approval needs to be submitted.
(vi) Copy of Green belt plan needs to be uploaded.
(vii) Copy of approved mine plan has not uploaded.
(viii) S. No. 17. Of form 2 is not adequate
(ix) Name of company/PP mentioned as Rakesh Bhargava. However the document is related to Shree Cement. | 21 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 23 Feb 2019 | 3. | NA | (i). PP has submitted the copy of proceedings of the Public Hearing, however there is no mentioning of letter number and date of the letter etc. in the proceedings. State Pollution Control may be requested to submit the copy of proceedings with latter no. and date. Authenticated translated copy of the PH proceedings shall also be submitted.
(ii). Compliance report inter-alia mentioned some of the non-compliances of earlier EC conditions. However, the action plan has not uploaded by the PP on Parivesh Portal.
(iii). Compliance of order dated 02.8.2017 in CWP No. 114/2014 of Hon'ble Supreme court (Common Cause Vs Union of India &Ors.). Details of demand if any raised by Department of Mining and Geology. Details of payment, if any made to Department of Mines & Geology
(iv). Earlier EDS was clearly mentioned that, “Name of company/PP mentioned as Rakesh Bhargava. However the document is related to Shree Cement.” Ministry has earlier also mentioned many time, however PP is ignoring the d | 01 Mar 2019 | 4. | NA | The correction have been made as per the instruction received | 14 Mar 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Respected Sir,
We are herewith submitting the ADS Reply for your kind consideration.
Best Regards | 30 Jun 2020 | 2. | NA | deferred
| 10 May 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr Anil Kumar Trivedi | Designation | Authorized Signatory | Name of Company (Applicant Name should not be given here) | SHREE CEMENT EAST PRIVATE LIMITED | Address | 21, Strand Road, Kolkata |
|