1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Grain Based Distillery Unit of capacity (59 KLD to 72 KLD) with no increase in pollution load | (b)Name of the Company / Organisation | KHEMANI DISTILLERIES PVT LTD | (c)Registered Address | Ringanwada, Kachigam Road, Daman,,Daman,Daman and Diu-396210 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Hinchhalal Dwivedi | (b)Designation (Owner/ Partner/ CEO) | EHSHead | (c)Address | Ringanwada, Kachigam Road, Daman,,Daman,Daman,Daman and Diu-396210 | (d)Pin code | 396210 | (e)E-mail | ehs@khemanigroup.com | (f)STD Code. | 224(f)Telephone No. | 2672 | (g)Fax No. | 2673 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/DD/IND2/93395/2019 | (d)Master Proposal Number(Single Window) | SW/93393/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | SURVEY NO: 50/1-A (1), 50/1-g, 50/2, 53/1, 53/2, 5 | (b)Pincode | 396210 | (c)Bounded Latitudes (North) | | From | | Degree | 2256647.33 | Minutes | | Second | | From | | Degree | 2257298.50 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 2777856.89 | Minutes | | Second | | From | | Degree | 278233.74 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43S15 (46D/15) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 17 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.42 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Daman and Diu | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Daman and Diu | Daman | Daman | Ringanwada and Kachigam | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 18-e-2/2019(ENV)/197 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 22 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Indian Made Foreign Liquor/CL | 66 | 0 | 66 | Others | lacs cases/annum | Road | | (2.) | Power Generation | 3.75 | 0 | 3.75 | Mega Watt(MW) | | Road | | (3.) | Extra Neutral Alcohol | 59 | 13 | 72 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Fermentation Unit | 1 | 0 | 1 | | (2.) | Distillation Unit | 1 | 0 | 1 | | (3.) | Bottling Plant | 1 | 0 | 1 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Oct 2018 | (iv)Valid Upto | 30 Sep 2021 | (v)File No. | PCC/DDR/R-34/WA/AA/RW/94-95/192669/262 | (vi)Application No. | PCC/DDR/R-34/WA/AA/RW/94-95/192669/262 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 100 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 27 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.50 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.65 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Enzymes | 96.6 | Others | kg per day | localmarket | Road | | 15 | MoU | | Copy of Linkage | (2.) | Grains – Maize, jowar, broken rice | 165 | Kilo Litre per Day | | open Market | Road | | 700 | MoU | | Copy of Linkage | (3.) | Nutrient | 23 | Others | kg per day | localmarket | Road | | 15 | MoU | | Copy of Linkage | (4.) | Anti-foam Agent | 34.5 | Others | kg per day | localmarket | Road | | 15 | MoU | | Copy of Linkage | (5.) | Yeast | 27.6 | Others | kg per day | localmarket | Road | | 15 | MoU | | Copy of Linkage | (6.) | Sodium hydroxide | 80 | Others | kg per day | local market | Road | | 15 | MoU | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.08 To 8.40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.98 To 5.38 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1026 | 0.4 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/77/DD/IND/2019 | 11 Apr 2019 | 1067 | (2.) | Surface | | 1026 | 0.5 | Copy of Permission Letter | Canal | | Others | Canal Water | 179981 | 24 Aug 2008 | 137 | (3.) | GroundWater | | 1026 | 0.5 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/65/DD/IND/2017-454 | 18 Mar 2019 | 460 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process & domestic waste water | 556 | 950 | ETP/CPU-600 KLD & Waste water recovery plant- 350 KLD | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 556 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 556 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 556 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Domestic Waste | Municipal Solid Waste | | 10.95 | Tons | 0.1 | Others | Organic as manure and incinerable to boiler | Others | Organic as manure and incinerable to boiler | (2.) | Grain Grit | Industrial Waste | | 566.66 | Tons | 0.1 | Others | Sold as cattle | Others | Sold as cattle | (3.) | Ash (Bio-briquttes) | Industrial Waste | | 4380 | Tons | 0.1 | Others | Brick Mfd. , Manure and Land Fill | Others | Brick Mfd. , Manure and Land Fill | (4.) | STP Sludge | Municipal Solid Waste | | 120.7 | Tons | 0.1 | Others | As manure within the plant | Others | as manure within the plant | (5.) | ETP Sludge | Others | Process waste | 0.012 | Tons | 0.1 | Others | as manure within the plant | Others | As manure within the plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 62.10 | 0.9 | 0.5 | 62.64 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 14.70 | 0.9 | 0.85 | 15.55 | 80 | (3.) | NOx | | Microgram per Meter Cube | 14.8 | 0.9 | 5 | 20 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 0 | 0.9 | 0 | 1 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 1000 kVA(Exisitng) | Low Sulphur Diesel | 10 | 0.25 | NOx | | 0.8 | (2.) | 500 kVA (Existing) | Low Sulphur Diesel | 11 | 0.123 | PM10 | | 0.04 | (3.) | 500 kVA (Existing) | Low Sulphur Diesel | 11 | 0.123 | SO2 | | 0.0017 | (4.) | 1000 kVA (Existing) | Low Sulphur Diesel | 10 | 0.25 | SO2 | | 0.0017 | (5.) | 500 kVA (Exisitng) | Low Sulphur Diesel | 11 | 0.123 | NOx | | 0.8 | (6.) | 1000 kVA (Exisiting) | Low Sulphur Diesel | 10 | 0.25 | PM10 | | 0.04 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2700 | (b)Source | Inhouse power generation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1x 500 & 2 x1000 KVA | (e)Stack Height (in m) | 11 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.7473 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.7473 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 9.7473 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 9.7473 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Total | 9.7473 | Total area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | None | 0 | None | (2.) | NPA | Holy jesus Church | 4.13 | In NWW direction | (3.) | ESZs | None | 0 | None | (4.) | ESAs | None | 0 | None | (5.) | Corridors | None | 0 | None | (6.) | Wildlife Corridors | None | 0 | None | (7.) | Critically Polluted Area | Vapi | 4.0 | Vapi comes under critically polluted area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Reserve forest near Balitha | 2.82 | In NEE direction | (2.) | Others | Sea | Arabian Sea | 7.22 | In West direction | (3.) | Archaeological Sites | | Holy jesus Church | 4.13 | In NWW direction | (4.) | Defence Installations | | Ringanwada | 0.59 | In NEE direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 9.7473 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 320 | (e)No. of working days | 365 | (f)Total Manpower | 320 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Percentage of Total Project Area | 33 | 0 | 33 | (2.) | Total Area of Green Belt | 32200 | 0 | 32200 | (3.) | No. of Plants | 3234 | 0 | 3234 | (4.) | Funds Allocated | 1 | 0 | 1 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Zero discharge complex. | (2.) | Social | Employment generation for people of nearby area | (3.) | Financial | Revenue generation through taxes | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/SA 078 | (ii)Name of the EIA Consultant | Perfact Enviro Solutions Pvt Ltd | (iii)Address | 5th Floor,Front Wing,NN Mall,Sector-3,Rohini,New Delhi-110085 | (iv)Mobile No. | 9818362330 | (v)Landline No. | 49281360 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 27 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Proposal needs to be examined in terms of this Ministry's Notification dated 23/11/2016 to ascertain its admissibility. Moreover, in case of expansion proposals, certified compliance report is necessarily required. | 07 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 28 Feb 2019 | 3. | NA | Please see our observations dated 7/2/2019 for the needful. | 03 Mar 2019 | 4. | NA | The correction have been made as per the instruction received | 07 Mar 2019 | 5. | NA | Please see our earlier observations dated 7/2/2019 & 3/3/2019 for examination of the proposal in terms of this Ministry's Notification dated 23/11/2016 to ascertain its admissibility. Also, the permission required from the concerned regulatory authority to draw more surface or ground water of (1026-597)= 429 cum/day. | 23 Mar 2019 | 6. | NA | The correction have been made as per the instruction received | 12 Apr 2019 | 7. | NA | Please see our earlier observations dated 7/2/2019 & 3/3/2019 for examination of the proposal in terms of this Ministry's Notification dated 23/11/2016 to ascertain its admissibility. Also, the permission required from the concerned regulatory authority to draw more surface or ground water of (1026-597)= 429 cum/day. | 12 Apr 2019 | 8. | NA | The correction have been made as per the instruction received | 13 Apr 2019 | 9. | NA | Please reply to our earlier observations to take the proposal forward. | 19 Apr 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Hinchhalal Dwivedi | Designation | EHSHead | Name of Company (Applicant Name should not be given here) | KHEMANI DISTILLERIES PVT LTD | Address | Ringanwada, Kachigam Road, Daman |
|