Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Redevelopment of Berths 8, 9 and Barge Berth at the Port of Mormugao, Goa.
(b)Name of the Company / Organisation Mormugao Port Trust
(c)Registered Address Headland, Sada, Goa-403804,Headland, Sada, Goa-403804,South Goa,Kerala-403804
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant L A Mathew
(b)Designation (Owner/ Partner/ CEO) Chief Engineer
(c)Address Headland, Sada, Goa-403804,Headland, Sada, Goa-403804,,South Goa,Goa-403804
(d)Pin code 403804
(e)E-mail prem.mpt@gmail.com
(f)STD Code. 832(f)Telephone No. 2521162
(g)Fax No. 2521165
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/GA/MIS/93270/2015
(d)Master Proposal Number(Single Window) SW/93117/2019
(e)EAC concerned (for category A Projects only) INFRA-1
(f)Project Type Modernization
4.
Location of the Project:
(a)Plot/Survey/Khasra No. NA
(b)Pincode 403804
(c)Bounded Latitudes (North)
From
Degree 15.40
Minutes
Second
From
Degree 15.40
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.79
Minutes
Second
From
Degree 73.80
Minutes
Second
(e)Survey of India Topo Sheet No. 48E/15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 4.5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0000
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Goa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 10-33/2015-IA-III
(c)Date of Issue of TOR 16 Feb 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 25 Apr 2019
(c)Date of Issue of EC 13 Jul 2023
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Mar 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :28 Apr 2017
Distance of Public Hearing Venue from the Proposed Project :1
Tilak Maidan, Vasco
State :Goa
District :South Goa
Tehsil :Mormugao
Village :mormugao
440Issue was mainly on handling of coal but instead of coal there will be Iron ore and other general cargo handled there.District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/26,30,49,2 of 13-14 & 2 of 15-16/Goa
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 14 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)General Cargo and container11.50202.43213.93OthersMTPARoad,Rail,Otherswater
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)NANANANANA
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Aug 2018
(iv)Valid Upto 11 Nov 2019
(v)File No. 5/2556/04-PCB/CI-4013
(vi)Application No. ID-13122
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1145.36
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.15
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 202.43
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 202.43
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Cargo202.43OthersMTPAMPTOthersSHIP00 OtherstradeCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 04 Mar 2016 To 24 Nov 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube64.532.363.480
(2.)PM10Micro Gram per Meter Cube128.858.0115100
(3.)SO2Micro Gram per Meter Cube37.321.837.280
(4.)PM2.5Micro Gram per Meter Cube49.238.247.560
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.056.2178.5
(2.)Chloridesmg/l43.217.62501000
(3.)Heavy MetalsLeadmg/l0.0010.0010.050.05
(4.)OthersSulphatemg/l14.44.3200400
(5.)TSSmg/l5.01.0510
(6.)TDSmg/l188.318.5300500
(7.)Fluoridemg/l0.210.0011.01.5
(8.)Total Hardnessmg/l25672300600
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l00A
(2.)DOmg/l00A
(3.)CODmg/l00A
(4.)pHNA00A
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))52.9050.4075
(2.)Leq(Night)A-weighted decibels(dB(A))44.9038.3665
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.207.94
(2.)P(Phosphorus)Milligram per Kilogram130.4264.15
(3.)Electric Conductivity00
(4.)N(Nitrogen)Percent0.190.03
(5.)K(Potassium)Milligram per Kilogram780.83217.81
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.5 To 3
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.5 To 3
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater20.400.2Copy of Permission LetterPipelineTube WellNA31 Jan 2019100
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage water51200STPReuse within the Plant & Recycling,Green Belt Renewal Plant5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)office and kitchen wastesMunicipal Solid Waste1Tons2RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube0000000.100
(2.)NOxMicrogram per Meter Cube0000000.100
(3.)PM2.5Microgram per Meter Cube0000000.100
(4.)SO2Microgram per Meter Cube0000000.100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA0000OthersNANA
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 14284
(b)Source Govt. of Goa
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) not yet finalised
(e)Stack Height (in m) 00
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 00
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 26.31
    Total Land (ha.) 26.31
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 00
(b)Waste/Barren Land (ha.) 00
(c)Grazing/ Community Land (ha.) 00
(d)Surface Water Bodies (ha.) 00
(e)Settlements (ha.) 00
(f)Industrial (ha.) 00
(g)Forest (ha.) 00
(h)Mangroves (ha.) 00
(i)Marine Area (ha.) 00
(j)Others (ha.) : total berth area 26.31
    Total (ha.) 26.31
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Othersfull berth area26.31
Total (ha.) 26.31
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSDr Salim Ali Bird Sanctuary13.53no ecosensitive area within 10km redius
(2.)Critically Polluted AreaNA00no CPA near project site
(3.)NPANA00No NPA
(4.)ESAsGrande Island6.33IT is on the othe side of the project.
(5.)ESZsNA00NA
(6.)Wildlife CorridorsNA00NA
(7.)CorridorsNA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesmormugao fort2it is in the premices of MPT and well protected.
(2.)Defence Installationscoast guard and navy defence organization3these installations are there for many years and project will have no effect on them.
(3.)ForestNA00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 26.31
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired it is MPT area only
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area MPT water area
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. NA
(iii)Date of issue 31 Jan 2019
(iv)Recommendation it is MPT waters only
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt100030004000
(2.)Percentage of Total Project Area0.5411.54
(3.)No. of Plants20010001200
(4.)Funds Allocated00300000300000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialAs a part of MPT’s endeavour to serve the Nation by enhancement of trade and commerce, it has been decided to the re-develop Berths 8, 9, Barge Berths and replace the Mechanical Ore Handling Plant at the Port of Mormugao on Develop, Build, Finance, Operate and Transfer (the "DBFOT") basis. With all the modern facilities.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-1
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 8
(b)Total No. of Flats to be Build 00
(c)No. of Buildings 4
(d)Total plot area (sqm) 263046
(e)Total built up area (sqm) 2100
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 00
(b)Capacity 00
(c)No. of Recharge Pits 00
(d)Capacity 00
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 400 sq mt
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage 00
(c)Quantity 00
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area there will not be any impact on water Bodies
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0106
(ii)Name of the EIA Consultant WAPCOS LIMITED
(iii)Address 76-C,INSTITUTIONAL AREA, SECTOR 18, GURGAON, 122015
(iv)Mobile No. 9818038112
(v)Landline No. 0112331313
(vi)Email Id environment@wapcos.gov.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-1
(ix)Validity of Accreditation 01 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per your online application no. IA/GA/MIS/93270/2015 dated 06.02.2019, Kindly submit the following; 1. Submit details of ToR in Form-2 and Copy of ToR letter dated 16.02.2016 issued by MoEFCC. 2. Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. 3. As per ToR condition (i), Submit Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned Regional Office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the environmental clearance issued earlier along with an action taken report on issues which have been stated to be partially complied or non/not complied. 08 Apr 2019
2.NAThe correction have been made as per the instruction received 25 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterClarifications attached. 18 Dec 2019
2.NA

Kindly see the final Minutes of the 42nd EAC (Infra-2) metting held during 10-12 July, 2019

26 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantL A Mathew
DesignationChief Engineer
Name of Company (Applicant Name should not be given here)Mormugao Port Trust
AddressHeadland, Sada, Goa-403804