1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Redevelopment of Berths 8, 9 and Barge Berth at the Port of Mormugao, Goa. | (b)Name of the Company / Organisation | Mormugao Port Trust | (c)Registered Address | Headland, Sada, Goa-403804,Headland, Sada, Goa-403804,South Goa,Kerala-403804 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | L A Mathew | (b)Designation (Owner/ Partner/ CEO) | Chief Engineer | (c)Address | Headland, Sada, Goa-403804,Headland, Sada, Goa-403804,,South Goa,Goa-403804 | (d)Pin code | 403804 | (e)E-mail | prem.mpt@gmail.com | (f)STD Code. | 832(f)Telephone No. | 2521162 | (g)Fax No. | 2521165 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GA/MIS/93270/2015 | (d)Master Proposal Number(Single Window) | SW/93117/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Modernization |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | NA | (b)Pincode | 403804 | (c)Bounded Latitudes (North) | | From | | Degree | 15.40 | Minutes | | Second | | From | | Degree | 15.40 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.79 | Minutes | | Second | | From | | Degree | 73.80 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 48E/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 4.5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0000 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Goa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 10-33/2015-IA-III | (c)Date of Issue of TOR | 16 Feb 2016 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 25 Apr 2019 | (c)Date of Issue of EC | 13 Jul 2023 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 Apr 2017 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Tilak Maidan, Vasco | State : | Goa | District : | South Goa | Tehsil : | Mormugao | Village : | mormugao |
| 440 | Issue was mainly on handling of coal but instead of coal there will be Iron ore and other general cargo handled there. | District Collector | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | EP/12.1/26,30,49,2 of 13-14 & 2 of 15-16/Goa | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 14 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | General Cargo and container | 11.50 | 202.43 | 213.93 | Others | MTPA | Road,Rail,Others | water | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | NA | NA | NA | NA | NA | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Aug 2018 | (iv)Valid Upto | 11 Nov 2019 | (v)File No. | 5/2556/04-PCB/CI-4013 | (vi)Application No. | ID-13122 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1145.36 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.15 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.14 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 4.7 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 202.43 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 202.43 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Cargo | 202.43 | Others | MTPA | MPT | Others | SHIP | 00 | Others | trade | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 04 Mar 2016 To 24 Nov 2016 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 64.5 | 32.3 | 63.4 | 80 | (2.) | PM10 | | Micro Gram per Meter Cube | 128.8 | 58.0 | 115 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 37.3 | 21.8 | 37.2 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 49.2 | 38.2 | 47.5 | 60 | |
14.2. No. of Ground Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.05 | 6.21 | 7 | 8.5 | (2.) | Chlorides | | | mg/l | | 43.2 | 17.6 | 250 | 1000 | (3.) | Heavy Metals | | Lead | mg/l | | 0.001 | 0.001 | 0.05 | 0.05 | (4.) | Others | Sulphate | | mg/l | | 14.4 | 4.3 | 200 | 400 | (5.) | TSS | | | mg/l | | 5.0 | 1.0 | 5 | 10 | (6.) | TDS | | | mg/l | | 188.3 | 18.5 | 300 | 500 | (7.) | Fluoride | | | mg/l | | 0.21 | 0.001 | 1.0 | 1.5 | (8.) | Total Hardness | | | mg/l | | 256 | 72 | 300 | 600 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 0 | 0 | A | (2.) | DO | | mg/l | | 0 | 0 | A | (3.) | COD | | mg/l | | 0 | 0 | A | (4.) | pH | | NA | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 7 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 52.90 | 50.40 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 44.90 | 38.36 | 65 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.20 | 7.94 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 130.42 | 64.15 | (3.) | Electric Conductivity | | | 0 | 0 | (4.) | N(Nitrogen) | Percent | | 0.19 | 0.03 | (5.) | K(Potassium) | Milligram per Kilogram | | 780.83 | 217.81 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.5 To 3 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 3 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 20.40 | 0.2 | Copy of Permission Letter | Pipeline | | Tube Well | | NA | 31 Jan 2019 | 100 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage water | 5 | 1200 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 5 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 5 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | office and kitchen wastes | Municipal Solid Waste | | 1 | Tons | 2 | Road | | Sanitary Landfills | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 00 | 00 | 00 | 0.1 | 00 | (2.) | NOx | | Microgram per Meter Cube | 00 | 00 | 00 | 0.1 | 00 | (3.) | PM2.5 | | Microgram per Meter Cube | 00 | 00 | 00 | 0.1 | 00 | (4.) | SO2 | | Microgram per Meter Cube | 00 | 00 | 00 | 0.1 | 00 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | NA | 00 | 00 | Others | NA | NA | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 14284 | (b)Source | Govt. of Goa | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | not yet finalised | (e)Stack Height (in m) | 00 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 00 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 26.31 | Total Land (ha.) | 26.31 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 00 | (b)Waste/Barren Land (ha.) | 00 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 00 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : total berth area | 26.31 | Total (ha.) | 26.31 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | full berth area | 26.31 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Dr Salim Ali Bird Sanctuary | 13.53 | no ecosensitive area within 10km redius | (2.) | Critically Polluted Area | NA | 00 | no CPA near project site | (3.) | NPA | NA | 00 | No NPA | (4.) | ESAs | Grande Island | 6.33 | IT is on the othe side of the project. | (5.) | ESZs | NA | 00 | NA | (6.) | Wildlife Corridors | NA | 00 | NA | (7.) | Corridors | NA | 00 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | mormugao fort | 2 | it is in the premices of MPT and well protected. | (2.) | Defence Installations | | coast guard and navy defence organization | 3 | these installations are there for many years and project will have no effect on them. | (3.) | Forest | | NA | 00 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 26.31 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | it is MPT area only | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | MPT water area | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | Yes | (i)Uploaded copy of permission | Copy of permission | (ii)Letter No. | NA | (iii)Date of issue | 31 Jan 2019 | (iv)Recommendation | it is MPT waters only | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 30 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 30 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1000 | 3000 | 4000 | (2.) | Percentage of Total Project Area | 0.54 | 1 | 1.54 | (3.) | No. of Plants | 200 | 1000 | 1200 | (4.) | Funds Allocated | 00 | 300000 | 300000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | As a part of MPT’s endeavour to serve the Nation by enhancement of trade and commerce, it has been decided to the re-develop Berths 8, 9, Barge Berths and replace the Mechanical Ore Handling Plant at the Port of Mormugao on Develop, Build, Finance, Operate and Transfer (the "DBFOT") basis. With all the modern facilities. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 8 | (b)Total No. of Flats to be Build | 00 | (c)No. of Buildings | 4 | (d)Total plot area (sqm) | 263046 | (e)Total built up area (sqm) | 2100 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 00 | (b)Capacity | 00 | (c)No. of Recharge Pits | 00 | (d)Capacity | 00 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 400 sq mt | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | 00 | (c)Quantity | 00 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0106 | (ii)Name of the EIA Consultant | WAPCOS LIMITED | (iii)Address | 76-C,INSTITUTIONAL AREA, SECTOR 18, GURGAON, 122015 | (iv)Mobile No. | 9818038112 | (v)Landline No. | 0112331313 | (vi)Email Id | environment@wapcos.gov.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 01 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per your online application no. IA/GA/MIS/93270/2015 dated 06.02.2019, Kindly submit the following;
1. Submit details of ToR in Form-2 and Copy of ToR letter dated 16.02.2016 issued by MoEFCC.
2. Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018.
3. As per ToR condition (i), Submit Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned Regional Office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the environmental clearance issued earlier along with an action taken report on issues which have been stated to be partially complied or non/not complied. | 08 Apr 2019 | 2. | NA | The correction have been made as per the instruction received | 25 Apr 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Clarifications attached. | 18 Dec 2019 | 2. | NA | Kindly see the final Minutes of the 42nd EAC (Infra-2) metting held during 10-12 July, 2019 | 26 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | L A Mathew | Designation | Chief Engineer | Name of Company (Applicant Name should not be given here) | Mormugao Port Trust | Address | Headland, Sada, Goa-403804 |
|