Details of Project:
(a)Name of the project(s) Proposed Captive Limestone Mine (Karhi Chandi Limestone Deposit) Area - 242.127 ha with Limestone Production Capacity of 1.5 Million TPA, Inter-Burden: 0.45 Million TPA and Top Soil: 0.051 Million TPA
(b)Name of the Company / Organisation Shree Cement Ltd.
(c)Registered Address Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Ajmer,Rajasthan-305901
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr Anil Kumar Trivedi
(b)Designation (Owner/ Partner/ CEO) Asst. Vice President & Head- Environment
(c)Address Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,,Jhunjhunu,Rajasthan-305901
(d)Pin code 305901
(e)E-mail anil.trivedi@shreecement.com
(f)STD Code. 1462(f)Telephone No. 228101
(g)Fax No. 228117
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/CG/MIN/65291/2017
(d)Master Proposal Number(Single Window) SW/93033/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map is enclosed
(b)Pincode 493113
(c)Bounded Latitudes (North)
From
Degree 213612.2
Minutes
Second
From
Degree 213740.5
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 820131.4
Minutes
Second
From
Degree 820234.1
Minutes
Second
(e)Survey of India Topo Sheet No. F44Q2, F44P14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 277
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhBalodabazarNo Data
(2.)MaharashtraSolapurMoholChincholi
(3.)OrissaJajpurSukindaOstapal, Saruabil, Sukurangi, Tailangi and Kamarda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/64/2017-IA-II(M)
(b)Date of Apply of TOR 09 Jun 2017
(c)Date of Issue of TOR / Standard ToR 05 Sep 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Jul 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :2.0
Near Village Chandi of Project Site (Ground Near Panchayat Bhawan), Tehsil –Simga, District – Balodabazar- Bhatapara (Chhattisgarh)
State :Chhattisgarh
District :Balodabazar
Tehsil :Simga
Village :Chandi
103Social Development in the nearby area, plantation, employment and environmental pollutionOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Drill Machines1
(2.)Hydraulic Excavator1
(3.)Dozer1
(4.)Loader1
(5.)Crusher (1200 TPH)1
(6.)Jeep1
(7.)Diesel Tank1
(8.)Dumper3
(9.)Motor Grader1
(10.)Maintenance Van1
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limestone1.5OthersMillion TPAConveyor Belt
(2.)Inter - Burden0.45OthersMillion TPAOthersHaul Roads
(3.)Crusher1200OthersTPHConveyor Belt
(4.)ML Area242.127HectaresOthersNA
(5.)Top Soil0.051OthersMillion TPAOthersHaul Road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 34.10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.95
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.853
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Deisel976OthersKilo LiterOpen MarketRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube84.259.783.71100
(2.)SO2Micro Gram per Meter Cube13.55.313.3380
(3.)NOxMicro Gram per Meter Cube28.512.528.1880
(4.)PM2.5Micro Gram per Meter Cube43.224.342.8260
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA....
(2.)Fluoridemg/l1.060.5411.5
(3.)pHNA8.027.366.58.5
(4.)Heavy MetalsAllNA....
(5.)Chloridesmg/l181.4111.402501000
(6.)TDSmg/l8012345002000
(7.)Total Hardnessmg/l552.29216.46200600
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l25.696.8E
(2.)BODmg/l7.202.3E
(3.)pHNA8.087.36E
(4.)DOmg/l5.04.4E
    14.4.     No. of Ambient Noise monitoring locations : 15
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.649.575
(2.)Leq(Night)A-weighted decibels(dB(A))58.838.270
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare492.07215.9
(2.)N(Nitrogen)Kilogram per hectare306.54215.45
(3.)Electric ConductivityMillisiemens per Centimetre0.420.17
(4.)P(Phosphorus)Kilogram per hectare55.620.22
(5.)pH8.057.60
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 5
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. Permission under process
(f)Date of Issue 02 Apr 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater150100Copy of Permission LetterPipelineTube WellPermission under process02 Apr 2018150
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshop1025Oil Water SeparatorOthersDust suppression100
(2.)Sanitation & Utility510Sock pit via septic tankOthersSock pit via septic tank05
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 15
(b)Total Discharged Water (Kilolitre per Day) 5
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)WasteOthersInter - Burden450000Tons0OthersHaul RoadsOthersBackfilling and waste dump in ML area
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube78.21.578.586.9100
(2.)SO2Microgram per Meter Cube12.41.575.2517.6680
(3.)PM2.5Microgram per Meter Cube40.31.456.7847.0960
(4.)NOxMicrogram per Meter Cube21.02.87.5828.5980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CrusherPower302.0PM10825 g/sec
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1000
(b)Source Existing & Proposed 125 MW CPP 100 MW WHRS
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 221.796
(c)Government Land (ha.) 20.331
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 242.127
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 216.736
(b)Waste/Barren Land (ha.) 20.131
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0.2
(e)Settlements (ha.) 5.06
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 242.12699999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Water Reservoir89
(2.)OB Dump Area17Plantation will be dump on waste dump
(3.)Green belt11Greenbelt - 4 ha & plant. on unworked area 7 ha
(4.)OthersBackfilled & Undisturbed area125.127Backfilled - 52 ha & Undisturbed area 73.127 ha
Total (ha.) 242.127
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESZsNone0No ESZs within 10 radius of Mine Site
(2.)CorridorsNone0No Corridors within 10 radius of Mine Site
(3.)Wildlife CorridorsNone0No Wildlife Corridors within 10 radius of Mine Site
(4.)Critically Polluted AreaNone0No CPA within 10 radius of Mine Site
(5.)WLSNone0No WLS within 10 radius of Mine Site
(6.)NPANone0No NPA within 10 radius of Mine Site
(7.)ESAsNone0No ESAs within 10 radius of Mine Site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNone0No Archaeological site within 10km radius
(2.)Defence InstallationsNone0No Defense installation within 10km radius
(3.)ForestDhabadih Reserve Forest4.0Proper Protection measures will be taken
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 102.368
(b)Land yet to be acquired(Ha) 119.428
(c)Status of Land acquisition if not acquired 20.331 ha is govt land
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 3
(b)No. of Households 790
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 592
(e)Funds Allocated for R&R(in INR) (in Lacs) 4188
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area small water stream
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Stream will not be disturbed in plan period, same will be diverted at conceptual stage after taking prior approv
(ii)Details of Study Conducted this is small stream and study will be conducted b
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mahanadi Canal
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 38
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 320
(f)Total Manpower 43
32.
Green Belt in Ha:
(a)Total Area of Green Belt 80
(b)Percentage of Total Project Area 33.04
(c)No. of Plants to be Planted 120000
(d)Funds Allocated for Plantation 10000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental• At the conceptual stage, total excavated area will be 141 ha, out of which 52 ha area will be reclaimed and backfilled followed by plantation and remaining 89 ha area will be converted into water reservoir. Total 80 ha area will be covered under Green belt and plantation. • About 89 ha of mined out area will be converted into water reservoir which will helpful of recharge of ground water. Water stored in reservoirs can also be used by the villagers for other purposes like agriculture, drinking
(2.)Social• M/s. Shree Cement Limited will carry out the various activities from time to time for social & community welfare. The main focus areas for the development of local community are as follows: ? Education Promotion Program ? Contribution in Religious & Social Program ? Infrastructure Development
(3.)Financial• The Project will contribute additional revenue to the State and Central Govt. in the form of royalty & other taxes etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 1.95
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. Balodaba/Chup/Khayo—53/2016-Raipur/238
(b)Date of Approval 08 Jun 2017
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 242.127
(f)Approved Capacity 2.001
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 155
(b)Mineable Reserves (Million Ton) 68.2
(c)Extractable Reserves(Million Ton) 68.2
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral Cement Grade
(f)Stripping Ratio 1 : 0.30
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 49
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)11200
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 242.127
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 28 Mar 2016
(iii)Validity of LOI 3
(iv)Reference No. of LOI Vide letter no. F 3-03/16/12 dated 28.03.2016 and
(c)Whether Lease Deed Executed ? No
(i)Reason thereof Lease will be executed after obtaining EC
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease will be executed after obtaining EC
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 17
(iii)Height (in meter) 20
(iv)Quantity (in Million Cubic meter) 5.1
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 85000
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 85000
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 89
(b)Depth (in meter) 37
(c)Volume (in Million Cubic meter) 32.93
12.
Details of Quarry:
(a)Final Void of 89 (hectare) at a Depth of 37 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 141
13.
Details of Transportation:
(a)In Pit/Underground to Surface from working face to crusher hopper will be carrie
(b)Surface to Siding/Loading Loading will be done by Hydraulic Excavators
(c)Transportation / Conveyor Details Crusher to Cement plant by Covered Conveyor Belt
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SETTLEMENTS5.0605.06
(2.)SURFACE WATER BODIES0.200.2
(3.)GRAZING LAND000
(4.)WASTE LAND20.131020.131
(5.)AGRICULTURE LAND216.7360216.736
(6.)FOREST LAND000
(7.)OTHERS(Specify)none000
TOTAL242.1270242.127
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT110011
(2.)EXCAVATION/QUARRY52890141
(3.)INTERNAL OB DUMPS170017
(4.)TOP SOIL STORAGE0000
(5.)EXTERNAL OB DUMPS0000
(6.)ROADS0000
(7.)BUILT UP AREA (COLONY/OFFICE)0000
(8.)VIRGIN AREA0073.12773.127
(9.)Othernone0000
TOTAL808973.1270242.127
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 17
(c)Quarry(in hectare) 141
(d)Safety Zone(in hectare) 4
(e)Final Void of 89 (hectare) at a Depth of 37 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 80
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001
(iv)Mobile No. 9509267011
(v)Landline No. 0121414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, ADS Reply for your kind consideration. Thanks & Regards 15 Apr 2020
2. ADS Raise LetterAD dtd 10 APR 2020 10 Apr 2020
3. ADS Raise LetterAD dtd 10 APR 2020 10 Apr 2020
4. ADS Reply Letterwe are herewith submitting ADS Reply 04 Dec 2019
5.NA

The proposal was placed in the 2nd EAC meeting held during February 20-21, 2019 wherein the Committee deferred the proposal and asked certain requisite information for further consideration. PP submitted the requisite information, accordingly, the proposal is placed in this EAC meeting. PP reported that it has submitted the soft copy of the information and reports to the members and also made presentation before the committee. Based on the information submitted and presentation made by PP and the discussion and deliberation held, the Committee recommen

21 Aug 2019
6. ADS Reply LetterSir, Hereby we are uploading the ADS reply issued for your kind consideration. Best Regards 25 Jun 2019
7.NAThe Committee, after detailed deliberations, deferred the proposal and sought the following requisite information/clarification: - (i) The Committee observed that the LOI is valid only up to 27.03.2019 and accordingly the PP needs to submit the extension of validity of LOI beyond March 2019. PP needs to submit the letter from PCCF, Government of Chhattisgarh regarding the details of Forest land, if any, involved in the mining lease area. (ii) PP reported that a part of Chandi Village habitation falls in ML area which will not be disturbed. PP needs to resubmit the detailed R&R plan along with budget as the mine lease area involves the habitations. PP also needs to submit the mitigation measures to protect the habitations involved in the MLA. (iii) The Committee observed that th 01 Mar 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr Anil Kumar Trivedi
DesignationAsst. Vice President & Head- Environment
Name of Company (Applicant Name should not be given here)Shree Cement Ltd.
AddressShree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India
Print