Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Integrated Cement Plant -Clinker (2 x 2.6 to 3 x 4.5 Million TPA), Cement (2 x 3.0 to 3 x 5.5 Million TPA), Captive Power Plant (25 to 125 MW) and Waste Heat Recovery Power Plant (30 to 1
(b)Name of the Company / Organisation Shree Cement Ltd.
(c)Registered Address Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Ajmer,Rajasthan-305901
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dr Anil Kumar Trivedi
(b)Designation (Owner/ Partner/ CEO) Asst. Vice President & Head- Environment
(c)Address Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,,Jhunjhunu,Rajasthan-305901
(d)Pin code 305901
(e)E-mail anil.trivedi@shreecement.com
(f)STD Code. 1462(f)Telephone No. 228101
(g)Fax No. 228117
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(b) Cement plants
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/IND/26823/2015
(d)Master Proposal Number(Single Window) SW/92750/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. List of Khasra no. has been enclosed along with PF
(b)Pincode 493113
(c)Bounded Latitudes (North)
From
Degree 213541.84
Minutes
Second
From
Degree 213629.06
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 820214.24
Minutes
Second
From
Degree 82036.17
Minutes
Second
(e)Survey of India Topo Sheet No. 64 G/14 & 64 K/2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 285
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 25
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)ChhattisgarhBalodabazarNo Data
(2.)ChhattisgarhRaipurSimga
(3.)OrissaJajpurSukindaOstapal, Saruabil, Sukurangi, Tailangi and Kamarda
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/235/2008-IA.II(I)
(c)Date of Issue of TOR 26 May 2015
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 07 May 2016
(c)Date of Issue of EC 05 Sep 2016
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :29 Jun 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :01 Aug 2018
Distance of Public Hearing Venue from the Proposed Project :1
Village Chandi Ground (Near Panchayat Bhawan)
State :Chhattisgarh
District :Balodabazar
Tehsil :Simga
Village :Chandi
110Issues related to Employment, Environment & Pollution, Plantation, CSR activities, Land related and other were raised during Public hearing.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 5-11/2011(ENV)/3997
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Mar 30 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Clinker5.28.313.5OthersMTPARoad,Rail
(2.)Captive Power Plant25100125Mega Watt(MW)OthersNA
(3.)Waste Heat Recovery Power Plant3070100Mega Watt(MW)OthersNA
(4.)D.G. Set200002000OthersKVAOthersNA
(5.)Cement610.516.5OthersMTPARoad,Rail
(6.)Synthetic Gypsum Unit65065OthersTPHOthersNA
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Limestone ReclaimerUnit -I: 1500 TPHUnit- II: 1800 TPH, Unit- III: 1800 TPH1 x 1500 TPH, 2 x 1800 TPH
(2.)Cement Mill (VRM + Ball Mill)Unit-I: 9000 TPDUnit-I: 9000 to 16700, Unit-II & III: 16700 TPD3 x 16700 TPD
(3.)Limestone StackerUnit -I: 2900 TPHUnit- II:2900 TPH, Unit- III:2900 TPH3 x 2900 TPH
(4.)KilnUnit-I:7800 TPDUnit-I: 7800 to 13700, Unit-II & III: 13700 TPD3 x 13700 TPD
(5.)Raw Mill (VRM)Unit -I: 500 TPHUnit-I: 500 to 925 Unit-II & III: 925 TPH3 x 925 TPH
(6.)Coal and Petcoke MillUnit-I:45 TPH Petcoke/ 60 TPH CoalUnit-I: 45/60 to 90/120, Unit-II & III: 90/120 TPH3 x 90/120 TPH
(7.)Packer4 x 16 spouts double discharge type each2 x (4 x 16 spouts double discharge type each)3 x (4 x 16 spouts double discharge type each)
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 16 Feb 2018
(iv)Valid Upto 31 Jan 2020
(v)File No. 6517/TS/CECB/2018
(vi)Application No. 6517/TS/CECB/2018
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2282.75
(b) Funds Allocated for Environment Management (Capital) (in Crores) 140
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 11.21
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.50
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 26.11
(b)Existing quantity of raw material/fuel 15.46
(c)Total quantity of raw material/fuel 41.57
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ironore0.21OthersMTPAKorbaRoad,Rail151 Open MarketCopy of Linkage
(2.)Slag8.25OthersMTPASiltara and RaigarhRoad,Rail172 MoUCopy of Linkage
(3.)GYPSUM1.15OthersMTPAVizagRoad,Rail573 MoUCopy of Linkage
(4.)Indian and imported Petcoke Cement Plant1.35OthersMTPAUSA and IndonesiaRoad,Rail1560 MoUCopy of Linkage
(5.)Indian & Imported Coal for CPP0.89OthersMTPAUSA and IndonesiaRoad,Rail1560 MoUCopy of Linkage
(6.)Limestone for Synthetic Gypsum Unit968OthersTPDCaptive Limestone MinesConveyor Belt0 CaptiveCopy of Linkage
(7.)Indian and imported Coal2.16OthersMTPALocal MarketRoad,Rail1560 MoUCopy of Linkage
(8.)H2SO4 98%655OthersTPDLocal MarketRoad200 MoUCopy of Linkage
(9.)Limestone21.6OthersMTPACaptive Limestone MinesConveyor Belt0 CaptiveCopy of Linkage
(10.)Fly ash5.77OthersMTPACPP and othersRoad,Conveyor Belt154 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube43.224.342.8260
(2.)SO2Micro Gram per Meter Cube13.55.313.3380
(3.)NOxMicro Gram per Meter Cube28.512.528.1880
(4.)PM10Micro Gram per Meter Cube84.259.783.71100
    14.2.     No. of Ground Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)TDSmg/l8012345002000
(3.)Total Hardnessmg/l552.29216.46200600
(4.)Heavy MetalsAll heavy metalsNA0000
(5.)Chloridesmg/l181.4111.402501000
(6.)pHNA8.027.366.58.5
(7.)Fluoridemg/l1.060.5411.5
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.087.36E
(2.)OthersTDSmg/l323134E
(3.)DOmg/l5.04.4E
(4.)BODmg/l7.202.3E
(5.)CODmg/l25.696.8E
    14.4.     No. of Ambient Noise monitoring locations : 15
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))58.838.270
(2.)Leq(Day)A-weighted decibels(dB(A))65.649.575
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.057.60
(2.)N(Nitrogen)Kilogram per hectare306.54215.45
(3.)P(Phosphorus)Kilogram per hectare55.630.22
(4.)K(Potassium)Kilogram per hectare492.07215.9
(5.)Electric ConductivityMillisiemens per Centimetre0.420.17
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 05 To 10
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 3 To 5
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater39350Copy of Permission LetterPipelineTube Well21-4(36)/NCCR/CGWA/2008-207924 Oct 20183000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler Blow Down1780Used in Synthetic Gypsum Unit and for Mill sprayReuse within the Plant & Recycling178
(2.)Domestic Waste Water450700Sewage Treatment PlantOthersUsed for Plantation4500
(3.)RO Reject water2000Used in Synthetic Gypsum Unit and for Mill sprayReuse within the Plant & Recycling200
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 828
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 828
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Sludge from STPOthersSolid Waste1.5Tons0RoadOthersUsed as manure for Greenbelt Development
(2.)Fly ash from CPPFly Ash40.82Tons0Pipe ConveyorOthersUtilized in manufacturing of PPC grade Cement
(3.)Used Oil (Cat. 5.1)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)150Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube40.30.7040.860
(2.)SO2Microgram per Meter Cube12.40.95.2118.6180
(3.)NOxMicrogram per Meter Cube26.60.77.8636.4680
(4.)PM10Microgram per Meter Cube78.20.78.3286.6100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Raw Mill & KilnIndia & Imported Coal and Petcoke1505.0PM1035.72 Kg / hr
(2.)Raw Mill & KilnIndian & Imported Coal and Petcoke1505.0SO2160.34 Kg / hr
(3.)Coal MillNA681.6PM105.39 kg/hr
(4.)Cement Mill-I (VRM)NA422.8PM107.39 kg/hr
(5.)Boiler-II (25 MW)Indian and Imported Coal921.95NOx16.4
(6.)Boiler-III (25 MW)Indian and Imported Coal921.95NOx16.4 kg/hr
(7.)Boiler-IV (25 MW)Indian and Imported Coal921.95PM104.9 kg/hr
(8.)Boiler-IV (25 MW)Indian and Imported Coal921.95SO216.4 kg/hr
(9.)Boiler-V (25 MW)Indian and Imported Coal921.95PM104.9 kg/hr
(10.)Boiler-V (25 MW)Indian and Imported Coal921.95SO216.4 kg/hr
(11.)Clinker CoolerNA554.3PM1023.0 kg/hr
(12.)Cement Mill-II (BM+RP)NA401.6PM101.60 kg/hr
(13.)Boiler-II (25 MW)Indian and Imported Coal921.95PM104.9 kg/hr
(14.)Boiler-II (25 MW)Indian and Imported Coal921.95SO216.4 kg/hr
(15.)Boiler-IV (25 MW)Indian and Imported Coal921.95NOx16.4 kg/hr
(16.)Boiler-III (25 MW)Indian and Imported Coal921.95PM104.9 khg/hr
(17.)Boiler-III (25 MW)Indian and Imported Coal921.95SO216.4 kg/hr
(18.)Raw Mill & KilnIndian & Imported Coal and Petcoke1505.0NOx714.30 Kg/hr
(19.)Boiler-V (25 MW)Indian and Imported Coal921.95NOx16.4 kg/hr
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 220000
(b)Source Captive Power Plant, WHRB & D.G. Set (for back-up
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2000 KVA
(e)Stack Height (in m) 35
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 159.256
    Total Land (ha.) 159.256
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 159.256
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 159.256
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant96.551
(2.)Green belt59.05
(3.)OthersOpen area3.655
Total (ha.) 159.256
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot applicable0No WLS within 10 km radius
(2.)ESZsNot applicable0No ESZs within 10 km radius
(3.)ESAsNot applicable0No ESAs within 10 km radius
(4.)NPANot applicable0No NPA within 10 km radius
(5.)CorridorsNot applicable0No Corridors within 10 km radius
(6.)Wildlife CorridorsNot applicable0No Wildlife Corridors within 10 km radius
(7.)Critically Polluted AreaNot applicable0No Critically Polluted area within 10 km raduis
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestDhabadih Reserve Forest4.0In NE Direction from the plant site
(2.)Defence InstallationsNot applicable0No defence installation within 10 km radius
(3.)Archaeological SitesNot applicable0No Archaeological Sites within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 159.256
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Mahanadi Canal
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 610
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 1640
(e)No. of working days 346
(f)Total Manpower 2800
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt39.519.5559.05
(2.)Percentage of Total Project Area24.8012.2737.07
(3.)No. of Plants9415954216148375
(4.)Funds Allocated0200200
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)SocialEmployment generation and upliftment of the nearby villagers through CER
(3.)FinancialRevenue generation for State and Centre in terms of taxes etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 91
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector - 25, Gurugram (Haryana)
(iv)Mobile No. 1244141926
(v)Landline No. 1244141926
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 18 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRespected Sir, As desired, additional details are enclosed herewith for your consideration please. Regards, R. Bhargava Sr. Vice President (Environment) 29 Apr 2019
2.NAIt is requested to address following shortfalls in the submitted ADS reply : i. With respect to point no.1, monitoring data of CO and HC has not been furnished. ii. With respect to point no. 3, entire public consultation proceedings has not been furnished, as stated in the CECB letter dated 18 Sept 2018. Moreover authenticated translation, as requested earlier, may be submitted. iii. With respect to point no.5, confirmed lime stone linkage for 13 MTPA cement production shall be furnished. iv. With respect to point no. 7, line source modelling for transportation of materials shall be furnished. 25 Apr 2019
3. ADS Reply LetterRespected Sir, Kindly refer to MOM of EAC (Industry - I) dt. 22.03.2019, Agenda Item no. 4.22. In this regard, point wise additional information along with enclosures are submitting herewith for your kind consideration please. in view of above it is requested to kindly consider our project in March month meeting for grant of EC. Thanking you, Yours Faithfully, Rakesh Bhargava Sr. Vice President – Environment M/s. Shree Raipur Cement Plant (A Unit of Shree Cement Ltd.) 05 Mar 2019
4.NAADS 27 Feb 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDr Anil Kumar Trivedi
DesignationAsst. Vice President & Head- Environment
Name of Company (Applicant Name should not be given here)Shree Cement Ltd.
AddressShree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India
Print