1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Integrated Cement Plant -Clinker (2 x 2.6 to 3 x 4.5 Million TPA), Cement (2 x 3.0 to 3 x 5.5 Million TPA), Captive Power Plant (25 to 125 MW) and Waste Heat Recovery Power Plant (30 to 1 | (b)Name of the Company / Organisation | Shree Cement Ltd. | (c)Registered Address | Shree Cement Ltd.
Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Shree Cement Ltd.
Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Ajmer,Rajasthan-305901 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr Anil Kumar Trivedi | (b)Designation (Owner/ Partner/ CEO) | Asst. Vice President & Head- Environment | (c)Address | Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,Shree Cement Ltd. Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India,,Jhunjhunu,Rajasthan-305901 | (d)Pin code | 305901 | (e)E-mail | anil.trivedi@shreecement.com | (f)STD Code. | 1462(f)Telephone No. | 228101 | (g)Fax No. | 228117 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/26823/2015 | (d)Master Proposal Number(Single Window) | SW/92750/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | List of Khasra no. has been enclosed along with PF | (b)Pincode | 493113 | (c)Bounded Latitudes (North) | | From | | Degree | 213541.84 | Minutes | | Second | | From | | Degree | 213629.06 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 820214.24 | Minutes | | Second | | From | | Degree | 82036.17 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64 G/14 & 64 K/2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 285 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 25 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Chhattisgarh | Balodabazar | No Data | | (2.) | Chhattisgarh | Raipur | Simga | | (3.) | Orissa | Jajpur | Sukinda | Ostapal, Saruabil, Sukurangi, Tailangi and Kamarda | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/235/2008-IA.II(I) | (c)Date of Issue of TOR | 26 May 2015 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 07 May 2016 | (c)Date of Issue of EC | 05 Sep 2016 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 01 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Village Chandi Ground (Near Panchayat Bhawan) | State : | Chhattisgarh | District : | Balodabazar | Tehsil : | Simga | Village : | Chandi |
| 110 | Issues related to Employment, Environment & Pollution, Plantation, CSR activities, Land related and other were raised during Public hearing. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 5-11/2011(ENV)/3997 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Mar 30 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Clinker | 5.2 | 8.3 | 13.5 | Others | MTPA | Road,Rail | | (2.) | Captive Power Plant | 25 | 100 | 125 | Mega Watt(MW) | | Others | NA | (3.) | Waste Heat Recovery Power Plant | 30 | 70 | 100 | Mega Watt(MW) | | Others | NA | (4.) | D.G. Set | 2000 | 0 | 2000 | Others | KVA | Others | NA | (5.) | Cement | 6 | 10.5 | 16.5 | Others | MTPA | Road,Rail | | (6.) | Synthetic Gypsum Unit | 65 | 0 | 65 | Others | TPH | Others | NA | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Limestone Reclaimer | Unit -I: 1500 TPH | Unit- II: 1800 TPH, Unit- III: 1800 TPH | 1 x 1500 TPH, 2 x 1800 TPH | | (2.) | Cement Mill (VRM + Ball Mill) | Unit-I: 9000 TPD | Unit-I: 9000 to 16700, Unit-II & III: 16700 TPD | 3 x 16700 TPD | | (3.) | Limestone Stacker | Unit -I: 2900 TPH | Unit- II:2900 TPH, Unit- III:2900 TPH | 3 x 2900 TPH | | (4.) | Kiln | Unit-I:7800 TPD | Unit-I: 7800 to 13700, Unit-II & III: 13700 TPD | 3 x 13700 TPD | | (5.) | Raw Mill (VRM) | Unit -I: 500 TPH | Unit-I: 500 to 925 Unit-II & III: 925 TPH | 3 x 925 TPH | | (6.) | Coal and Petcoke Mill | Unit-I:45 TPH Petcoke/ 60 TPH Coal | Unit-I: 45/60 to 90/120, Unit-II & III: 90/120 TPH | 3 x 90/120 TPH | | (7.) | Packer | 4 x 16 spouts double discharge type each | 2 x (4 x 16 spouts double discharge type each) | 3 x (4 x 16 spouts double discharge type each) | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 16 Feb 2018 | (iv)Valid Upto | 31 Jan 2020 | (v)File No. | 6517/TS/CECB/2018 | (vi)Application No. | 6517/TS/CECB/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2282.75 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 140 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 11.21 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.50 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 26.11 | (b)Existing quantity of raw material/fuel | 15.46 | (c)Total quantity of raw material/fuel | 41.57 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Ironore | 0.21 | Others | MTPA | Korba | Road,Rail | | 151 | Open Market | | Copy of Linkage | (2.) | Slag | 8.25 | Others | MTPA | Siltara and Raigarh | Road,Rail | | 172 | MoU | | Copy of Linkage | (3.) | GYPSUM | 1.15 | Others | MTPA | Vizag | Road,Rail | | 573 | MoU | | Copy of Linkage | (4.) | Indian and imported Petcoke Cement Plant | 1.35 | Others | MTPA | USA and Indonesia | Road,Rail | | 1560 | MoU | | Copy of Linkage | (5.) | Indian & Imported Coal for CPP | 0.89 | Others | MTPA | USA and Indonesia | Road,Rail | | 1560 | MoU | | Copy of Linkage | (6.) | Limestone for Synthetic Gypsum Unit | 968 | Others | TPD | Captive Limestone Mines | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (7.) | Indian and imported Coal | 2.16 | Others | MTPA | Local Market | Road,Rail | | 1560 | MoU | | Copy of Linkage | (8.) | H2SO4 98% | 655 | Others | TPD | Local Market | Road | | 200 | MoU | | Copy of Linkage | (9.) | Limestone | 21.6 | Others | MTPA | Captive Limestone Mines | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (10.) | Fly ash | 5.77 | Others | MTPA | CPP and others | Road,Conveyor Belt | | 154 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 15 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 43.2 | 24.3 | 42.82 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 13.5 | 5.3 | 13.33 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 28.5 | 12.5 | 28.18 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 84.2 | 59.7 | 83.71 | 100 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 801 | 234 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 552.29 | 216.46 | 200 | 600 | (4.) | Heavy Metals | | All heavy metals | NA | | 0 | 0 | 0 | 0 | (5.) | Chlorides | | | mg/l | | 181.41 | 11.40 | 250 | 1000 | (6.) | pH | | | NA | | 8.02 | 7.36 | 6.5 | 8.5 | (7.) | Fluoride | | | mg/l | | 1.06 | 0.54 | 1 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.08 | 7.36 | E | (2.) | Others | TDS | mg/l | | 323 | 134 | E | (3.) | DO | | mg/l | | 5.0 | 4.4 | E | (4.) | BOD | | mg/l | | 7.20 | 2.3 | E | (5.) | COD | | mg/l | | 25.69 | 6.8 | E | |
14.4. No. of Ambient Noise monitoring locations : 15 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 58.8 | 38.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 65.6 | 49.5 | 75 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 8.05 | 7.60 | (2.) | N(Nitrogen) | Kilogram per hectare | | 306.54 | 215.45 | (3.) | P(Phosphorus) | Kilogram per hectare | | 55.6 | 30.22 | (4.) | K(Potassium) | Kilogram per hectare | | 492.07 | 215.9 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.42 | 0.17 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 05 To 10 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 3 To 5 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 3935 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4(36)/NCCR/CGWA/2008-2079 | 24 Oct 2018 | 3000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Boiler Blow Down | 178 | 0 | Used in Synthetic Gypsum Unit and for Mill spray | Reuse within the Plant & Recycling | | 178 | | (2.) | Domestic Waste Water | 450 | 700 | Sewage Treatment Plant | Others | Used for Plantation | 450 | 0 | (3.) | RO Reject water | 200 | 0 | Used in Synthetic Gypsum Unit and for Mill spray | Reuse within the Plant & Recycling | | 200 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 828 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 828 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Sludge from STP | Others | Solid Waste | 1.5 | Tons | 0 | Road | | Others | Used as manure for Greenbelt Development | (2.) | Fly ash from CPP | Fly Ash | | 40.82 | Tons | 0 | Pipe Conveyor | | Others | Utilized in manufacturing of PPC grade Cement | (3.) | Used Oil (Cat. 5.1) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 150 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 40.3 | 0.7 | 0 | 40.8 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 12.4 | 0.9 | 5.21 | 18.61 | 80 | (3.) | NOx | | Microgram per Meter Cube | 26.6 | 0.7 | 7.86 | 36.46 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 78.2 | 0.7 | 8.32 | 86.6 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Raw Mill & Kiln | India & Imported Coal and Petcoke | 150 | 5.0 | PM10 | | 35.72 Kg / hr | (2.) | Raw Mill & Kiln | Indian & Imported Coal and Petcoke | 150 | 5.0 | SO2 | | 160.34 Kg / hr | (3.) | Coal Mill | NA | 68 | 1.6 | PM10 | | 5.39 kg/hr | (4.) | Cement Mill-I (VRM) | NA | 42 | 2.8 | PM10 | | 7.39 kg/hr | (5.) | Boiler-II (25 MW) | Indian and Imported Coal | 92 | 1.95 | NOx | | 16.4 | (6.) | Boiler-III (25 MW) | Indian and Imported Coal | 92 | 1.95 | NOx | | 16.4 kg/hr | (7.) | Boiler-IV (25 MW) | Indian and Imported Coal | 92 | 1.95 | PM10 | | 4.9 kg/hr | (8.) | Boiler-IV (25 MW) | Indian and Imported Coal | 92 | 1.95 | SO2 | | 16.4 kg/hr | (9.) | Boiler-V (25 MW) | Indian and Imported Coal | 92 | 1.95 | PM10 | | 4.9 kg/hr | (10.) | Boiler-V (25 MW) | Indian and Imported Coal | 92 | 1.95 | SO2 | | 16.4 kg/hr | (11.) | Clinker Cooler | NA | 55 | 4.3 | PM10 | | 23.0 kg/hr | (12.) | Cement Mill-II (BM+RP) | NA | 40 | 1.6 | PM10 | | 1.60 kg/hr | (13.) | Boiler-II (25 MW) | Indian and Imported Coal | 92 | 1.95 | PM10 | | 4.9 kg/hr | (14.) | Boiler-II (25 MW) | Indian and Imported Coal | 92 | 1.95 | SO2 | | 16.4 kg/hr | (15.) | Boiler-IV (25 MW) | Indian and Imported Coal | 92 | 1.95 | NOx | | 16.4 kg/hr | (16.) | Boiler-III (25 MW) | Indian and Imported Coal | 92 | 1.95 | PM10 | | 4.9 khg/hr | (17.) | Boiler-III (25 MW) | Indian and Imported Coal | 92 | 1.95 | SO2 | | 16.4 kg/hr | (18.) | Raw Mill & Kiln | Indian & Imported Coal and Petcoke | 150 | 5.0 | NOx | | 714.30 Kg/hr | (19.) | Boiler-V (25 MW) | Indian and Imported Coal | 92 | 1.95 | NOx | | 16.4 kg/hr | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 220000 | (b)Source | Captive Power Plant, WHRB & D.G. Set (for back-up | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2000 KVA | (e)Stack Height (in m) | 35 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 159.256 | Total Land (ha.) | 159.256 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 159.256 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 159.256 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 96.551 | | (2.) | Green belt | | 59.05 | | (3.) | Others | Open area | 3.655 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not applicable | 0 | No WLS within 10 km radius | (2.) | ESZs | Not applicable | 0 | No ESZs within 10 km radius | (3.) | ESAs | Not applicable | 0 | No ESAs within 10 km radius | (4.) | NPA | Not applicable | 0 | No NPA within 10 km radius | (5.) | Corridors | Not applicable | 0 | No Corridors within 10 km radius | (6.) | Wildlife Corridors | Not applicable | 0 | No Wildlife Corridors within 10 km radius | (7.) | Critically Polluted Area | Not applicable | 0 | No Critically Polluted area within 10 km raduis | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Dhabadih Reserve Forest | 4.0 | In NE Direction from the plant site | (2.) | Defence Installations | | Not applicable | 0 | No defence installation within 10 km radius | (3.) | Archaeological Sites | | Not applicable | 0 | No Archaeological Sites within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 159.256 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Mahanadi Canal | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 610 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 1640 | (e)No. of working days | 346 | (f)Total Manpower | 2800 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 39.5 | 19.55 | 59.05 | (2.) | Percentage of Total Project Area | 24.80 | 12.27 | 37.07 | (3.) | No. of Plants | 94159 | 54216 | 148375 | (4.) | Funds Allocated | 0 | 200 | 200 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Greenery of the area will be increased | (2.) | Social | Employment generation and upliftment of the nearby villagers through CER | (3.) | Financial | Revenue generation for State and Centre in terms of taxes etc. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 91 | (ii)Name of the EIA Consultant | J.M. EnviroNet Pvt. Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector - 25, Gurugram (Haryana) | (iv)Mobile No. | 1244141926 | (v)Landline No. | 1244141926 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Respected Sir,
As desired, additional details are enclosed herewith for your consideration please.
Regards,
R. Bhargava
Sr. Vice President (Environment) | 29 Apr 2019 | 2. | NA | It is requested to address following shortfalls in the submitted ADS reply :
i. With respect to point no.1, monitoring data of CO and HC has not been furnished.
ii. With respect to point no. 3, entire public consultation proceedings has not been furnished, as stated in the CECB letter dated 18 Sept 2018. Moreover authenticated translation, as requested earlier, may be submitted.
iii. With respect to point no.5, confirmed lime stone linkage for 13 MTPA cement production shall be furnished.
iv. With respect to point no. 7, line source modelling for transportation of materials shall be furnished. | 25 Apr 2019 | 3. | ADS Reply Letter | Respected Sir,
Kindly refer to MOM of EAC (Industry - I) dt. 22.03.2019, Agenda Item no. 4.22. In this regard, point wise additional information along with enclosures are submitting herewith for your kind consideration please.
in view of above it is requested to kindly consider our project in March month meeting for grant of EC.
Thanking you,
Yours Faithfully,
Rakesh Bhargava
Sr. Vice President – Environment
M/s. Shree Raipur Cement Plant
(A Unit of Shree Cement Ltd.) | 05 Mar 2019 | 4. | NA | ADS | 27 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr Anil Kumar Trivedi | Designation | Asst. Vice President & Head- Environment | Name of Company (Applicant Name should not be given here) | Shree Cement Ltd. | Address | Shree Cement Ltd.
Bangur Nagar, Post Box No. 33, Beawar 305901, Rajasthan, India |
|