1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s. Jyoti Resins & Adhesives Ltd. | (b)Name of the Company / Organisation | JYOTI RESINS & ADHESIVES LTD. | (c)Registered Address | S.No. 873, opp. Anand Health Care, Ranchhodpura road, Village Santej, Taluka: Kalol, District: Gandhinagar.,405-406, Rajkamal Plaza-B,
Opp. Sakar-III, Income Tax, Ahmedabad-380014,Gandhinagar,Gujarat-380014 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Jagdish Patel | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | 405-406, Rajkamal Plaza-B,
Opp. Sakar-III, Income Tax, Ahmedabad-380014,,Kalol,Gandhinagar,Gujarat-380014 | (d)Pin code | 380014 | (e)E-mail | info@euro7000.com | (f)STD Code. | 79(f)Telephone No. | 27540153 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/92467/2017 | (d)Master Proposal Number(Single Window) | SW/92463/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 873 | (b)Pincode | 380014 | (c)Bounded Latitudes (North) | | From | | Degree | 2261683 | Minutes | | Second | | From | | Degree | 2261683 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72281356 | Minutes | | Second | | From | | Degree | 72281356 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43A8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 81 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.081 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/429/2017-IA-II(I) | (c)Date of Issue of TOR | 23 Nov 2016 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 02 Apr 2019 | (c)Date of Issue of EC | 14 Jul 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Exemption from the public hearing as per the provi | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 18A389/2017(SEAC)606 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jun 15 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Synthetic Resin Adhesive(PVAA) | 600 | 900 | 1500 | Others | Metric Tonnes per Month | Road | | (2.) | Adhesive SH (By mixing process) | 150 | 0 | 150 | Others | Metric Tonnes per month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Thermic Fluid Heater | 4 lakh kcal/hr | 0 | 4 lakh kcal/hr | | (2.) | Vessel | 10 Ton | 0 | 10 Ton | | (3.) | Vessel | 2 Ton | 0 | 2 Ton | | (4.) | Vessel | 6 Ton | 0 | 6 Ton | | (5.) | Mixture Tank | 5 Ton | 0 | 5 Ton | | (6.) | Pump & Motor | 25 HP | 0 | 25 HP | | (7.) | Pump & Motor | 10 HP | 0 | 10 HP | | (8.) | Pump & Motor | 5 HP | 0 | 5 HP | | (9.) | Air Compressor | 25 HP | 0 | 25 HP | | (10.) | Dia from pump | 5 HP | 0 | 5 HP | | (11.) | Dia from pump | 15 HP | 0 | 15 HP | | (12.) | VAM Storage Tank | 50,000 KL | 0 | 50,000 KL | | (13.) | Mixture Tank | 10 Ton | 0 | 10 Ton | | (14.) | Mixture Tank | 3 Ton | 0 | 3 Ton | | (15.) | Mixture Tank | 2 Ton | 0 | 2 Ton | | (16.) | Pump & Motor | 20 HP | 0 | 20HP | | (17.) | Pump & Motor | 5 HP | 0 | 5 HP | | (18.) | Vessel | 5 Ton | 0 | 5 Ton | | (19.) | Vessel | 3 Ton | 0 | 3 Ton | | (20.) | Mixture Tank | 6 Ton | 0 | 6 Ton | | (21.) | Dia fromPump | 0 | 3 HP | 3 HP | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Jul 2017 | (iv)Valid Upto | 02 Apr 2019 | (v)File No. | PC/GPCB/ID-16463/CCA-GNR-151(2)/417901 | (vi)Application No. | 121688 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.8 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.12 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.008 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.12 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 505.541 | (b)Existing quantity of raw material/fuel | 337.026 | (c)Total quantity of raw material/fuel | 842.567 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Poly Vinyl Alcohol | 60.000 | Others | Metric Tonnes | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | (2.) | Vinyl acetate monomer | 689.608 | Others | Kilo Litres | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | (3.) | Sodium Bicarbonate | 1.465 | Others | Metric Tonnes | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | (4.) | Dibutyl Pthalate | 19.565 | Others | Kilo Litres | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | (5.) | Octanol | 7.270 | Others | Kilo Litres | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | (6.) | Potassium per sulphate | 2.118 | Others | Metric Tonnes | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | (7.) | Formaldehyde | 2.933 | Others | Kilo Litres | Traders & Distributors | Road | | 0.0 | Others | No Linkages | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 44.56 | 22.8 | 43.84 | 60 | (2.) | NOx | | Micro Gram per Meter Cube | 30.8 | 14.7 | 29.13 | 80 | (3.) | Others | co | Mili Gram per Meter Cube | 0.449 | 0.24 | 0.426 | 2 | (4.) | SO2 | | Micro Gram per Meter Cube | 11.4 | 6.34 | 11.2 | 80 | (5.) | PM10 | | Micro Gram per Meter Cube | 95.50 | 64.30 | 93.98 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | No unit | 7.58 | 7.09 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 1230 | 989 | 2000 | 2000 | (3.) | Total Hardness | | | mg/l | | 496 | 320 | 600 | 600 | (4.) | Chlorides | | | mg/l | | 410 | 218 | 1000 | 1000 | (5.) | Fluoride | | | mg/l | | 1.2 | 0.88 | 1.5 | 1.5 | (6.) | TSS | | | mg/l | | 6 | 2 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.6 | 4.1 | A | (2.) | COD | | mg/l | | 28 | 4 | A | (3.) | BOD | | mg/l | | 2 | 2 | A | (4.) | pH | | NA | | 7.70 | 7.14 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 68.1 | 47.9 | 70 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 56.7 | 38.8 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.08 | 6.56 | (2.) | K(Potassium) | Milligram per Kilogram | | 374 | 304 | (3.) | N(Nitrogen) | Milligram per Kilogram | | 1116 | 897 | (4.) | P(Phosphorus) | Milligram per Kilogram | | 642 | 26 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 134 | 81 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.30 To 1.87 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.71 To 2.24 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tanker Water Supply | 38.225 | 0.0 | Not Appliacble | modeOthers | Not Applicable | Others | NA as Tanker Water Supply | NA | 10 Jan 2019 | 38.225 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 2.44 | 3.0 | NA | Others | Septic Tank & Soak Pit | 0.0 | 2.44 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2.44 | (b)Total Discharged Water (Kilolitre per Day) | 2.44 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Thermo pack Ash | Industrial Waste | | 10.512 | Tons | 20 | Road | | Others | Sold to Brick manufacturers | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 9.53 | 6.52 | 0.086 | 9.7 | 80 | (2.) | NOx | | Microgram per Meter Cube | 25.8 | 2.44 | 0.070 | 25.9 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 35.3 | 2.44 | 0.073 | 35.473 | 60 | (4.) | PM10 | | Microgram per Meter Cube | 80.7 | 2.44 | 0.179 | 80.97 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | D.G.Set | 62.5 KVA | 14 | 0.15 | PM10 | | 75 | (2.) | Thermic Fluid Heater | 4 Lakh Kcal/hr | 16 | 0.5 | PM10 | | 105 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 180 | (b)Source | UGVCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 62.5 KVA | (e)Stack Height (in m) | 14 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.0 | (b)Private Land (ha.) | 0.7016 | (c)Government Land (ha.) | 0.0 | (d)Revenue Land (ha.) | 0.0 | (e)Other Land (ha.) | 0.0 | Total Land (ha.) | 0.7016 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0.0 | (b)Waste/Barren Land (ha.) | 0.0 | (c)Grazing/ Community Land (ha.) | 0.0 | (d)Surface Water Bodies (ha.) | 0.0 | (e)Settlements (ha.) | 0.0 | (f)Industrial (ha.) | 0.7016 | (g)Forest (ha.) | 0.0 | (h)Mangroves (ha.) | 0.0 | (i)Marine Area (ha.) | 0.0 | (j)Others (ha.) : 0.0 | 0.0 | Total (ha.) | 0.7016 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Built Up Area | | 0.169004 | | (2.) | Green belt | | 0.251956 | | (3.) | Others | Open Area | 0.280640 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 00 | Not Applicable | (2.) | WLS | NA | 00 | Not Applicable | (3.) | NPA | NA | 00 | Not Applicable | (4.) | ESAs | NA | 00 | Not Applicable | (5.) | Corridors | NA | 00 | Not Applicable | (6.) | Wildlife Corridors | NA | 00 | Not Applicable | (7.) | ESZs | Thol bird sanctuary | 5.55 | outside | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 00 | Not Applicable | (2.) | Defence Installations | | NA | 00 | Not Applicable | (3.) | Archaeological Sites | | NA | 00 | Not Applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.7016 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | 00 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 00 | (b)Permanent Employment-During Operation | 80 | (c)Temporary Employment- During Construction | 15 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 365 | (f)Total Manpower | 95 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 0.2519 | 00 | 0.2519 | (2.) | Percentage of Total Project Area | 33 | 00 | 33 | (3.) | No. of Plants | 500 | 0 | 500 | (4.) | Funds Allocated | 00 | 00 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment Generation, Health Check Up, Green Belt Plantation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/IA0029 | (ii)Name of the EIA Consultant | Green circle inc | (iii)Address | Green Empire (Anupushpam Habitat Centre) Above Axis bank, Near Yash Complex, Gotri Road, Vadodara - 390021 (Gujarat) | (iv)Mobile No. | 9998036028 | (v)Landline No. | 0265237126 | (vi)Email Id | info@greencircleinc.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 04 Jun 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify/submit the following:-
- Copy of the EC dated 28/6/2016 obtained from SEIAA , and the details in column 6 of Form-2.
- Operational status of the project as per the EC.
- Project seems to be covered under category A of item 5(f). How the said EC was obtained from SEIAA.
- Proposal to seek permission for water withdrawal of 38.225 cum/day, and the present status thereof.
- Certificate of Accreditation for the engaged EIA consultant against item 38(x) of Form-2. | 02 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 16 Feb 2019 | 3. | NA | Please see our earlier observations dated 2/2/2019. Further details are required in r/o the following:-
- CTO from the GPCB not obtained for production capacity of 600 TPM against the EC dated 28/6/2016, and the unit is still operating @46 TPM. In such a case, how the proposed expansion from 600 to 1500 TPM (PVAA) is admissible.
- Permission from the concerned regulatory authority for ground water withdrawal of 38.225 cum/day by the water supplier.
- Still no details mentioned against column 6 of Form-2. | 24 Feb 2019 | 4. | NA | The correction have been made as per the instruction received | 01 Mar 2019 | 5. | NA | Your reply dated 27/2/2019 lacks clarity in respect of the following:-
- First CTO/CC&A obtained from GPCB for production capacity of 600 TPM of Resin (PVAA) against the EC dated 28/6/2016 issued by SEIAA.
- No details mentioned against column 6 of Form-2. | 23 Mar 2019 | 6. | NA | The correction have been made as per the instruction received | 02 Apr 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Action Taken Report for Partial & Non Complied EC order | 16 Jun 2020 | 2. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 3. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 4. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 5. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 6. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 7. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 8. | NA | It has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. | 20 Mar 2020 | 9. | ADS Reply Letter | Minutes of Meeting (MoM) Compliance of Minutes of the 8th eeting of the Expert Appraisal Committee | 22 Nov 2019 | 10. | NA | |
|