Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Jyoti Resins & Adhesives Ltd.
(b)Name of the Company / Organisation JYOTI RESINS & ADHESIVES LTD.
(c)Registered Address S.No. 873, opp. Anand Health Care, Ranchhodpura road, Village Santej, Taluka: Kalol, District: Gandhinagar.,405-406, Rajkamal Plaza-B, Opp. Sakar-III, Income Tax, Ahmedabad-380014,Gandhinagar,Gujarat-380014
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Jagdish Patel
(b)Designation (Owner/ Partner/ CEO) Managing Director
(c)Address 405-406, Rajkamal Plaza-B, Opp. Sakar-III, Income Tax, Ahmedabad-380014,,Kalol,Gandhinagar,Gujarat-380014
(d)Pin code 380014
(e)E-mail info@euro7000.com
(f)STD Code. 79(f)Telephone No. 27540153
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/92467/2017
(d)Master Proposal Number(Single Window) SW/92463/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 873
(b)Pincode 380014
(c)Bounded Latitudes (North)
From
Degree 2261683
Minutes
Second
From
Degree 2261683
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72281356
Minutes
Second
From
Degree 72281356
Minutes
Second
(e)Survey of India Topo Sheet No. F43A8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 81
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.081
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/429/2017-IA-II(I)
(c)Date of Issue of TOR 23 Nov 2016
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 02 Apr 2019
(c)Date of Issue of EC 14 Jul 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Exemption from the public hearing as per the provi
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 18A389/2017(SEAC)606
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 15 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Synthetic Resin Adhesive(PVAA)6009001500OthersMetric Tonnes per MonthRoad
(2.)Adhesive SH (By mixing process)1500150OthersMetric Tonnes per monthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Thermic Fluid Heater4 lakh kcal/hr04 lakh kcal/hr
(2.)Vessel10 Ton010 Ton
(3.)Vessel2 Ton02 Ton
(4.)Vessel6 Ton06 Ton
(5.)Mixture Tank5 Ton05 Ton
(6.)Pump & Motor25 HP025 HP
(7.)Pump & Motor10 HP010 HP
(8.)Pump & Motor5 HP05 HP
(9.)Air Compressor25 HP025 HP
(10.)Dia from pump5 HP05 HP
(11.)Dia from pump15 HP015 HP
(12.)VAM Storage Tank50,000 KL050,000 KL
(13.)Mixture Tank10 Ton010 Ton
(14.)Mixture Tank3 Ton03 Ton
(15.)Mixture Tank2 Ton02 Ton
(16.)Pump & Motor20 HP020HP
(17.)Pump & Motor5 HP05 HP
(18.)Vessel5 Ton05 Ton
(19.)Vessel3 Ton03 Ton
(20.)Mixture Tank6 Ton06 Ton
(21.)Dia fromPump03 HP3 HP
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Jul 2017
(iv)Valid Upto 02 Apr 2019
(v)File No. PC/GPCB/ID-16463/CCA-GNR-151(2)/417901
(vi)Application No. 121688
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.8
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.12
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.008
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 505.541
(b)Existing quantity of raw material/fuel 337.026
(c)Total quantity of raw material/fuel 842.567
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Poly Vinyl Alcohol60.000OthersMetric TonnesTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
(2.)Vinyl acetate monomer689.608OthersKilo LitresTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
(3.)Sodium Bicarbonate1.465OthersMetric TonnesTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
(4.)Dibutyl Pthalate19.565OthersKilo LitresTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
(5.)Octanol7.270OthersKilo LitresTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
(6.)Potassium per sulphate2.118OthersMetric TonnesTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
(7.)Formaldehyde2.933OthersKilo LitresTraders & DistributorsRoad0.0 OthersNo LinkagesCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.5622.843.8460
(2.)NOxMicro Gram per Meter Cube30.814.729.1380
(3.)OtherscoMili Gram per Meter Cube0.4490.240.4262
(4.)SO2Micro Gram per Meter Cube11.46.3411.280
(5.)PM10Micro Gram per Meter Cube95.5064.3093.98100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNo unit7.587.096.58.5
(2.)TDSmg/l123098920002000
(3.)Total Hardnessmg/l496320600600
(4.)Chloridesmg/l41021810001000
(5.)Fluoridemg/l1.20.881.51.5
(6.)TSSmg/l6200
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l5.64.1A
(2.)CODmg/l284A
(3.)BODmg/l22A
(4.)pHNA7.707.14A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))68.147.970
(2.)Leq(Night)A-weighted decibels(dB(A))56.738.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.086.56
(2.)K(Potassium)Milligram per Kilogram374304
(3.)N(Nitrogen)Milligram per Kilogram1116897
(4.)P(Phosphorus)Milligram per Kilogram64226
(5.)Electric ConductivityMillisiemens per Centimetre13481
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.30 To 1.87
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.71 To 2.24
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Water Supply38.2250.0 Not Appliacble modeOthersNot ApplicableOthersNA as Tanker Water SupplyNA10 Jan 201938.225
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic2.443.0NAOthersSeptic Tank & Soak Pit0.02.44
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2.44
(b)Total Discharged Water (Kilolitre per Day) 2.44
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Thermo pack AshIndustrial Waste10.512Tons20RoadOthersSold to Brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube9.536.520.0869.780
(2.)NOxMicrogram per Meter Cube25.82.440.07025.980
(3.)PM2.5Microgram per Meter Cube35.32.440.07335.47360
(4.)PM10Microgram per Meter Cube80.72.440.17980.97100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D.G.Set62.5 KVA140.15PM1075
(2.)Thermic Fluid Heater4 Lakh Kcal/hr160.5PM10105
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 180
(b)Source UGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 62.5 KVA
(e)Stack Height (in m) 14
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.7016
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 0.7016
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 0.0
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 0.7016
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : 0.0 0.0
    Total (ha.) 0.7016
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.169004
(2.)Green belt0.251956
(3.)OthersOpen Area0.280640
Total (ha.) 0.7016
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00Not Applicable
(2.)WLSNA00Not Applicable
(3.)NPANA00Not Applicable
(4.)ESAsNA00Not Applicable
(5.)CorridorsNA00Not Applicable
(6.)Wildlife CorridorsNA00Not Applicable
(7.)ESZsThol bird sanctuary5.55outside
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00Not Applicable
(2.)Defence InstallationsNA00Not Applicable
(3.)Archaeological SitesNA00Not Applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.7016
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 00
(b)Permanent Employment-During Operation 80
(c)Temporary Employment- During Construction 15
(d)Temporary Employment- During Operation 00
(e)No. of working days 365
(f)Total Manpower 95
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt0.2519000.2519
(2.)Percentage of Total Project Area330033
(3.)No. of Plants5000500
(4.)Funds Allocated00000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation, Health Check Up, Green Belt Plantation
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/IA0029
(ii)Name of the EIA Consultant Green circle inc
(iii)Address Green Empire (Anupushpam Habitat Centre) Above Axis bank, Near Yash Complex, Gotri Road, Vadodara - 390021 (Gujarat)
(iv)Mobile No. 9998036028
(v)Landline No. 0265237126
(vi)Email Id info@greencircleinc.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 04 Jun 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify/submit the following:- - Copy of the EC dated 28/6/2016 obtained from SEIAA , and the details in column 6 of Form-2. - Operational status of the project as per the EC. - Project seems to be covered under category A of item 5(f). How the said EC was obtained from SEIAA. - Proposal to seek permission for water withdrawal of 38.225 cum/day, and the present status thereof. - Certificate of Accreditation for the engaged EIA consultant against item 38(x) of Form-2. 02 Feb 2019
2.NAThe correction have been made as per the instruction received 16 Feb 2019
3.NAPlease see our earlier observations dated 2/2/2019. Further details are required in r/o the following:- - CTO from the GPCB not obtained for production capacity of 600 TPM against the EC dated 28/6/2016, and the unit is still operating @46 TPM. In such a case, how the proposed expansion from 600 to 1500 TPM (PVAA) is admissible. - Permission from the concerned regulatory authority for ground water withdrawal of 38.225 cum/day by the water supplier. - Still no details mentioned against column 6 of Form-2. 24 Feb 2019
4.NAThe correction have been made as per the instruction received 01 Mar 2019
5.NAYour reply dated 27/2/2019 lacks clarity in respect of the following:- - First CTO/CC&A obtained from GPCB for production capacity of 600 TPM of Resin (PVAA) against the EC dated 28/6/2016 issued by SEIAA. - No details mentioned against column 6 of Form-2. 23 Mar 2019
6.NAThe correction have been made as per the instruction received 02 Apr 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAction Taken Report for Partial & Non Complied EC order 16 Jun 2020
2.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
3.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
4.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
5.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
6.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
7.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
8.NAIt has been desired to obtain clarification for submitting two proposals in PARIVESH portal i.e. IA/GJ/IND2/92467/2017 and IA/GJ/IND2/67445/2017 and these two proposal are being considered by the EAC one by one. The project proponent also requested to submit action taken report on partial and non complied points duly certified from Regional office at Bhopal. 20 Mar 2020
9. ADS Reply LetterMinutes of Meeting (MoM) Compliance of Minutes of the 8th eeting of the Expert Appraisal Committee 22 Nov 2019
10.NA