Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) M/s. Anugrah In Organic Pvt. Ltd.
(b)Name of the Company / Organisation M/S. ANUGRAH IN-ORG (P) LTD – UNIT II
(c)Registered Address D2-CH/143, GIDC Dahej, Taluka: Vagra, Dist: Bharuch, Gujarat,,Bharuch,Gujarat-392130
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mr Kashyap Shah
(b)Designation (Owner/ Partner/ CEO) ManagingDirector
(c)Address A-30, Mehsana nagar society,Nizam pura, Vadodara,,Vadodara,Vadodara,Gujarat-390024
(d)Pin code 390024
(e)E-mail info@anugrah.co.in
(f)STD Code. 265(f)Telephone No. 2761735
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
(b)Category A
(c)Proposal Number IA/GJ/IND2/92130/2018
(d)Master Proposal Number(Single Window) SW/92128/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. D2-CH/143
(b)Pincode 392130
(c)Bounded Latitudes (North)
From
Degree 21.43
Minutes
Second
From
Degree 21.43
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.37
Minutes
Second
From
Degree 72.37
Minutes
Second
(e)Survey of India Topo Sheet No. F43M10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 00
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.06
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratBharuchVagraOstapal, Saruabil, Sukurangi, Tailangi and Kamarda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/248/2018-IA-II(I)
(b)Date of Apply of TOR 31 Aug 2018
(c)Date of Issue of TOR / Standard ToR 08 Oct 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason as the Gujarat Industrial Development Corporation
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)GLR20 KL5 Nos.
(2.)RM Storage Tank100 KL8 Nos.
(3.)FG Storage Tank100 KL12 Nos.
(4.)RM Storage tank50 KL2 Nos.
(5.)RM Storage tank100 Kl2 Nos.
(6.)Receivers10 Kl2 Nos.
(7.)Centrifuge60-250 kg10 Nos.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)2,4 Di chloro phenoxy acetic acid (2,4 D)14400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 08 Oct 2018
(iv)Valid Upto 08 Oct 2023
(v)File No. 0000
(vi)Application No. 00000
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 8.84
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.75
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1768
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.15
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 68400
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 68400
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)2,6 dicholorophenol11232Tons per AnnumAarti Industries Ltd.(Alchemie),VapiRoad143 Open MarketCopy of Linkage
(2.)Caustic lye26640Tons per AnnumGujarat Alkali, Dahej, DCM Industry, JhagadiaRoad50 Open MarketCopy of Linkage
(3.)H c l21744Tons per AnnumExisting UnitRoad00 CaptiveCopy of Linkage
(4.)MONO CHLROACETIC ACID8784Tons per AnnumExisting UnitRoad00 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube873987100
(2.)SO2Micro Gram per Meter Cube18101880
(3.)NOxMicro Gram per Meter Cube30203080
(4.)OthersCOMicro Gram per Meter Cube.70.35.702
(5.)PM2.5Micro Gram per Meter Cube54235460
    14.2.     No. of Ground Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.017.097.58.5
(2.)TDSmg/l33984634000500
(3.)Chloridesmg/l72572725250
(4.)Heavy MetalsLeadmg/l0.010.010.010.01
(5.)Fluoridemg/l4.60.351
(6.)Total Hardnessmg/l485179500200
(7.)TSSmg/l10510100
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.97.4A
(2.)DOmg/l5.85.6A
(3.)CODmg/l85A
(4.)BODmg/l5.52A
(5.)OthersTDSmg/l47950450A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))574975
(2.)Leq(Night)A-weighted decibels(dB(A))463970
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµmhos/cm0.600.40
(2.)pH8.17.9
(3.)N(Nitrogen)Othersgm/kg1.50.9
(4.)P(Phosphorus)Othersgm/kg0.70.4
(5.)K(Potassium)Othersgm/kg0.0520.039
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 00 To 00
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 00 To 00
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC water supply541.72Copy of Permission LetterPipelineOthersVia pumpGIDC/BRH/DEE(DRG)-55315 Jun 201843.4
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic400Soak PitReuse within the Plant & Recycling,OthersSoak Pit004
(2.)MEE Condensate329.4350MEE Followed by ROReuse within the Plant & Recycling329.4
(3.)cooling tower2424TO ROReuse within the Plant & Recycling24
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 357.4
(b)Total Discharged Water (Kilolitre per Day) 4
(c)Total Reused Water (Kilolitre per Day) 353.4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP sludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6.48Tons65RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.2Kilolitre65RoadAuthorized Recyclers
(3.)Empty drums/Bags/ContainersHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons60RoadAuthorized Recyclers
(4.)salt from MEEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5.4Tons65RoadOthersTSDF site
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube0000000100
(2.)PM2.5NA0000000100
(3.)SO2NA0000000100
(4.)Others(Specify)VOCNA0000000100
(5.)NOxNA0000000100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)D. G. SetDiesel110.05PM10150
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 500
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 00
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 0.986
    Total Land (ha.) 0.986
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1159.56
(b)Waste/Barren Land (ha.) 5076.01
(c)Grazing/ Community Land (ha.) 000
(d)Surface Water Bodies (ha.) 1363.73
(e)Settlements (ha.) 000
(f)Industrial (ha.) 290.32
(g)Forest (ha.) 00
(h)Mangroves (ha.) 340.3
(i)Marine Area (ha.) 00
(j)Others (ha.) : Fallow Land,Open/Degraded vegetation 23215.91
    Total (ha.) 31445.829999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.2082 4 D plant
(2.)Township00
(3.)Green belt2.01135
(4.)Ash Pond00
(5.)Quarry Area00
(6.)OB Dump Area00
(7.)Safety Zone00
(8.)Tailing Pond00
(9.)Water Reservoir00
(10.)Desalination Plant00
(11.)Area for Solid Waste Management00
(12.)Built Up Area1.8888Security Cabin,Electrical Transformer
(13.)OthersETP Area0.144
Total (ha.) 4.25215
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Area--00--
(2.)WLS--00--
(3.)NPA--00Not Applicable
(4.)ESAs--00Not Applicable
(5.)ESZs--00Not Applicable
(6.)Wildlife Corridors--00Not Applicable
(7.)Corridors--00Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest--00Not Applicable
(2.)Archaeological Sites--00Not Applicable
(3.)Defence Installations--00Not Applicable
(4.)OthersNA--00--
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 00
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 00
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 20
(e)No. of working days 30
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.01135
(b)Percentage of Total Project Area 203.99
(c)No. of Plants to be Planted 300
(d)Funds Allocated for Plantation 500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 00000
(ii)Name of the EIA Consultant M/s. Jyoti Om Chemical Research Centre Pvt. Ltd.
(iii)Address F-11 Surajmoti complex, near high tension road subhanpura, Nr Hariom Nagar
(iv)Mobile No. 9824150383
(v)Landline No. 0265220293
(vi)Email Id info@jyotiom.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Apr 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease confirm along with the supporting documents that the proposed product is one of the technical grade pesticides, its end use as herbicide and not covered under banned category of pesticides/chemicals in the country. 01 Feb 2019
2.NAPlease confirm along with the supporting documents that the proposed product is one of the technical grade pesticides, its end use as herbicide and not covered under banned category of pesticides/chemicals in the country. 01 Feb 2019
3.NAThe correction have been made as per the instruction received 08 Feb 2019
4.NAPlease inform the status of EC from SEIAA for manufacturing Mono Chloro Acetic Acid (one of the raw material for 2,4 Dicholoro Phenoxy Acetic Acid). Also please clarify as to why the proposed product should not be covered under item 5(f) for its appraisal by the SEAC/SEIAA. 16 Feb 2019
5.NAThe correction have been made as per the instruction received 23 Feb 2019
6.NAPlease obtain the EC from SEIAA for manufacturing Mono Choloro Acetic Acid, one of the raw material for the proposed product. 03 Mar 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMr Kashyap Shah
DesignationManagingDirector
Name of Company (Applicant Name should not be given here)M/S. ANUGRAH IN-ORG (P) LTD – UNIT II
AddressD2-CH/143, GIDC Dahej, Taluka: Vagra, Dist: Bharuch, Gujarat
Print