Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sri Balaji Action Medical Institute
(b)Name of the Company / Organisation LALA MUNNI LAL MANGE RAM CHARITABLE TRUST
(c)Registered Address Lala Munni Lal Mange Ram Charitable Trust, 15/17, East Punjabi Bagh, New Delhi,,West,Delhi-110026
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Raj Kumar Gupta
(b)Designation (Owner/ Partner/ CEO) Trustee
(c)Address Lala Munni Lal Mange Ram Charitable Trust, 15/17, East Punjabi Bagh, New Delhi-110026,,Punjabi Bagh,West,Delhi-110026
(d)Pin code 110026
(e)E-mail sp.khanpuria@gmail.com
(f)STD Code. 11(f)Telephone No. 45666666
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/91906/2019
(d)Master Proposal Number(Single Window) SW/91902/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. FC-34
(b)Pincode 110063
(c)Bounded Latitudes (North)
From
Degree 3173616.45
Minutes
Second
From
Degree 3173764.40
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 706169.77
Minutes
Second
From
Degree 706339.91
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 211
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.29
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason As per EIA Notification, 2006, all building constr
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Total No of towers3
(2.)Total no of beds500
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)total plot area23400Otherssqare meterOthersNot Applicable
(2.)total built-up area after expansion83454.81Otherssqare meterOthersNot Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 02 Jun 2016
(iv)Valid Upto 25 Jul 2018
(v)File No. 37157
(vi)Application No. 35544
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.36
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.175
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)It is a construction project.0Others00Others00 OthersRaw Material_MOUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 24 Dec 2018 To 29 Dec 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube191.1172.4185.2100
(2.)PM2.5Micro Gram per Meter Cube139.6119.5136.360
(3.)SO2Micro Gram per Meter Cube7.97.17.780
(4.)NOxMicro Gram per Meter Cube40.135.239.380
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l189.9189.9250250
(2.)Fluoridemg/l0.220.2211
(3.)Heavy MetalsLeadmg/l000.10.1
(4.)TSSNA0000
(5.)TDSmg/l850.2850.2500500
(6.)pHNA7.67.68.58.5
(7.)Total Hardnessmg/l9292200200
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.87.8E
(2.)DOmg/l2.82.8E
(3.)CODmg/l9696E
(4.)BODmg/l13.513.5E
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))47.247.240
(2.)Leq(Day)A-weighted decibels(dB(A))51.551.550
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram33.633.6
(2.)P(Phosphorus)Milligram per Kilogram17.917.9
(3.)Electric ConductivityOthersmicrosiemens per centimetre219.7219.7
(4.)pH7.37.3
(5.)K(Potassium)Milligram per Kilogram9.59.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.91 To 34.62
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.82 To 34.86
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board & Tanker Supply1950Copy of Permission LetterPipelineOthersDelhi Jal Board & Tanker Supply600564439090511 Jul 2017195
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic, Flushing, Gardening, DG & HVAC Cooling282600STPReuse within the Plant & Recycling,Green Belt Renewal Plant,Others27 KLD losses25527
(2.)Laboratory13ETPDischarge into Surface Water Body,Others0.2 KLD losses01
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 283
(b)Total Discharged Water (Kilolitre per Day) 28
(c)Total Reused Water (Kilolitre per Day) 255
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid Waste (Biodegradable)Municipal Solid Waste128.1Tons0OthersOrganic Waste Converter sha;ll be installedOthersOrganic Waste Converter
(2.)Municipal Solid Waste (Non Biodegradable)Municipal Solid Waste42.7Tons0.1RoadAuthorized Recyclers
(3.)Electronic WasteE Waste0.024Kilolitre0.1RoadAuthorized Recyclers
(4.)Biomedical WasteBio-Medical Waste68.4Tons0.1RoadAuthorized Recyclers
(5.)Plastic WastePlastic Waste42.7Tons0.1RoadAuthorized Recyclers
(6.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.192Kilolitre0.1RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube188.150.91.21189.37100
(2.)NOxMicrogram per Meter Cube39.70.92.6342.3480
(3.)PM2.5Microgram per Meter Cube137.50.90.726138.22760
(4.)SO2Microgram per Meter Cube7.80.90.2628.06380
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG sets (3 x750 kVA)Low sulphur diesel45.50.3PM100.208
(2.)DG sets (3x 750 kVA)Low sulphur diesel45.50.3SO20.045
(3.)DG sets (3 x 750 kVA)Low sulphur diesel45.50.3OthersPM2.50.125
(4.)DG sets (3 x750 kVA)Low sulphur diesel45.50.3NOx0.450
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1657
(b)Source BSES
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 3x750 kVA
(e)Stack Height (in m) 45.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 2.3400
    Total Land (ha.) 2.3400
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plot area 2.3400
    Total (ha.) 2.34
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area8.3454
Total (ha.) 8.3454
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSnone0None
(2.)NPAnone0None
(3.)ESAsnone0None
(4.)Critically Polluted AreaNaraina Industrail Area4.09in South East Direction from Project Site
(5.)ESZsnone0None
(6.)Corridorsnone0None
(7.)Wildlife CorridorsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestPusa Hill Forest7.29South East direction from project site
(2.)Archaeological SitesNone0None
(3.)Defence InstallationsNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.3400
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Not applicable
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Bhagwati Lake-1.05 km, Najafgarh drain-1.29 km
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 1.05
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 1500
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 1650
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.528761
(b)Percentage of Total Project Area 22.60
(c)No. of Plants to be Planted 0
(d)Funds Allocated for Plantation 0.05
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAbout 5287.61 m2 (22.60% of plot area) has already been developed as green.
(2.)SocialIt will provide better medical facility & employment opportunities to the people of nearby area.
(3.)FinancialRevenue generation through taxes
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 39.5
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 3
(d)Total plot area (sqm) 23400
(e)Total built up area (sqm) 83454.81
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 3
(d)Capacity 77.48
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 886 ECS
5.
Energy Saving Measures:
(a)Source/Mode LED lights and solar heater
(b)Percentage 1
(c)Quantity 16.57
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area No impact
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev 72/ 17th Dec, 2018 at S.No. 117
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd.
(iii)Address 5th floor, NN Mall, Mangalam palace,, Sec-3, Rohini
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThis is an expansion project not new. Kindly correct the category in Form-1. Also submit copy of Consent to Operate and Bio Medical Waste Authorisation for the existing hospital. 23 Jan 2019
2.NAThe correction have been made as per the instruction received 24 Jan 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantRaj Kumar Gupta
DesignationTrustee
Name of Company (Applicant Name should not be given here)LALA MUNNI LAL MANGE RAM CHARITABLE TRUST
AddressLala Munni Lal Mange Ram Charitable Trust, 15/17, East Punjabi Bagh, New Delhi
Print