Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) SETTING UP NEW PROPOSED SYNTHETIC ORGANIC CHEMICALS (4300 MT/MONTH), DYE INTERMEDIATES (300 MT/MONTH) AND PESTICIDE TECHNICAL (1500 MT/MONTH) IN EXISTING UNIT (3500 MT/MONTH)
(b)Name of the Company / Organisation ORGANIC INDUSTRIES PRIVATE LIMITED
(c)Registered Address Plot No. S/163, GIDC, Dahej-I, Ta. Vagra,,Dist. Bharuch, Gujarat,Bharuch,Gujarat-392130
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Narendra J Jakkanni
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Plot No. S/163, GIDC, Dahej-I, Ta. Vagra,,Dist. Bharuch, Gujarat,Vagra,Bharuch,Gujarat-392130
(d)Pin code 392130
(e)E-mail organic163@gmail.com
(f)STD Code. 2641(f)Telephone No. 252021
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/91786/2014
(d)Master Proposal Number(Single Window) SW/91782/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. S/163
(b)Pincode 392130
(c)Bounded Latitudes (North)
From
Degree 21.421212
Minutes
Second
From
Degree 21.423352
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.343270
Minutes
Second
From
Degree 72.344929
Minutes
Second
(e)Survey of India Topo Sheet No. F43M10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 15
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 5
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/284/2018-IA-II(I)
(c)Date of Issue of TOR 12 Mar 2014
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 27 Feb 2019
(c)Date of Issue of EC 03 Jul 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason Located in notified Industrial Estate-Dahej
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 1111
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Oct 28 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Pesticide Technical Grade Products0015001500OthersTons per MonthRoad
(2.)Potassium Permanganate70000700OthersTons per MonthRoad
(3.)Specialty CHemicals0043004300OthersTons per MonthRoad
(4.)Borax Decahydrate70000700OthersTons per MonthRoad
(5.)Dye Intermediates00300300OthersTons per MonthRoad
(6.)Boric Acid Technical2000002000OthersTons per MonthRoad
(7.)Di Sodium Octaborate Tetrahydrate10000100OthersTons per MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)124812
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 12 Mar 2014
(iv)Valid Upto 11 Mar 2019
(v)File No. AWH-62742
(vi)Application No. AWH-62742
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 20
(b) Funds Allocated for Environment Management (Capital) (in Crores) 3.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 122000
(b)Existing quantity of raw material/fuel 17500
(c)Total quantity of raw material/fuel 139500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Ethylene Oxide7320Tons per AnnumNeraestRoad500 LinkageCopy of Linkage
(2.)Coal66000Tons per AnnumNeraestRoad25 Fuel Supply AgreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Mili Gram per Meter Cube17.5711.971780
(2.)PM10Mili Gram per Meter Cube83.5472.583100
(3.)PM2.5Mili Gram per Meter Cube45.9940.654560
(4.)NOxMili Gram per Meter Cube18.6514.061880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l540.5185.2600600
(2.)Chloridesmg/l1508.314.810001000
(3.)Fluoridemg/l00000101
(4.)pHNA8.257.478.58.5
(5.)TSSmg/l608200200
(6.)TDSmg/l327018321002100
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.0400A
(2.)CODmg/l18.200A
(3.)DOmg/l7.1400A
(4.)BODmg/l0.70A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))684875
(2.)Leq(Night)A-weighted decibels(dB(A))584070
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.997.65
(2.)P(Phosphorus)Percent0.600
(3.)K(Potassium)Percent0.8300
(4.)Electric ConductivityCentimeter per Second94
(5.)N(Nitrogen)Percent54
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply76515Copy of Permission LetterPipelineBarrageGIDC/DEE/BRH25 Oct 2018765
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process417417ETP, MEEDischarge into Seawater Body,Reuse within the Plant & Recycling36750
(2.)Cooling Tower1515ETPReuse within the Plant & Recycling15
(3.)Washing1010ETPReuse within the Plant & Recycling10
(4.)Other1010ETPReuse within the Plant & Recycling10
(5.)Boiler2828ETPReuse within the Plant & Recycling28
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 480
(b)Total Discharged Water (Kilolitre per Day) 50
(c)Total Reused Water (Kilolitre per Day) 430
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)120Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)ResinHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.696Kilolitre50RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Iron SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1200Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)GypsumIndustrial Waste1200Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)MEE SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2700Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Discarded DrumHazardous Waste (as per Hazardous and Other Waste Management rules 2016)36Tons50RoadAuthorized Recyclers
(7.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.2Kilolitre50RoadAuthorized Recyclers
(8.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)384Tons50RoadCo-Processing
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube83.5410.01284.0100
(2.)NOxMicrogram per Meter Cube18.6510.00219.080
(3.)SO2Microgram per Meter Cube17.5710.31418.0080
(4.)PM2.5Microgram per Meter Cube45.9910.0147.0060
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boiler-1 & 2Coal311.0PM10100
(2.)Boiler-1&2Coal311.0SO2262
(3.)TFHCoal311.0PM10100
(4.)Boiler-3 & 4Coal311.0PM10100
(5.)D G SetHSD110.2PM10100
(6.)Boiler-1&2Coal311.0NOx94
(7.)TFHCoal311.0PM10100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4500
(b)Source DGVCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1500 KVA
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 17.51
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 00
    Total Land (ha.) 17.51
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 648.63
(b)Waste/Barren Land (ha.) 86509.19
(c)Grazing/ Community Land (ha.) 1284.63
(d)Surface Water Bodies (ha.) 7454.94
(e)Settlements (ha.) 1500.00
(f)Industrial (ha.) 1924.00
(g)Forest (ha.) 169.31
(h)Mangroves (ha.) 2564.44
(i)Marine Area (ha.) 93914.5
(j)Others (ha.) : Industry 71.92
    Total (ha.) 196041.56000000003
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.7
(2.)Green belt6.0
(3.)Area for Solid Waste Management4.0
(4.)OthersOpen5.81
Total (ha.) 17.51
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLS--0000
(2.)NPA--0000
(3.)ESAs--0000
(4.)ESZs--0000
(5.)Corridors--0000
(6.)Critically Polluted Area--0000
(7.)Wildlife Corridors--0000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest--0000
(2.)Archaeological Sites--0000
(3.)Defence Installations--0000
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 12000
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 17.51
(b)Land yet to be acquired(Ha) 17.51
(c)Status of Land acquisition if not acquired acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 50
(e)No. of working days 330
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt300003000060000
(2.)Percentage of Total Project Area171734
(3.)No. of Plants50001200017000
(4.)Funds Allocated90000036000004500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalImprove Environment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. stay against NABET/QCI
(ii)Name of the EIA Consultant Aqua Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Centre Point, Ring Road, Surat
(iv)Mobile No. 9904433995
(v)Landline No. 0261246085
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 31 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease confirm the following along with the supporting documents:- - None of the existing products (3500 TPM) is covered under the EIA Notification, 1994/2006. - Proposed pesticides (1500 TPM) are technical grade and their end use would remain for the intended purpose only. - In case of no EC, entries in column 9 of Form-2 are not justified. 26 Jan 2019
2.NAThe correction have been made as per the instruction received 16 Feb 2019
3.NAPlease refer our earlier observations dated 26/1/2019. There is no proper justification provided regarding nature of the proposed pesticides and their end use. There are other discrepancies in Form-2 [details in column 9, 3(a), 7(a)], which needs to be rectified. Also please confirm by way of an undertaking that none of the pesticides/raw materials/solvents is banned by the concerned regulatory authorities. 24 Feb 2019
4.NAThe correction have been made as per the instruction received 27 Feb 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantNarendra J Jakkanni
DesignationDirector
Name of Company (Applicant Name should not be given here)ORGANIC INDUSTRIES PRIVATE LIMITED
AddressPlot No. S/163, GIDC, Dahej-I, Ta. Vagra,