|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | AARESS Iron & Steel Limited | (b)Name of the Company / Organisation | AARESS Iron and Steel Limited | (c)Registered Address | Baldota Bhavan, 117, Maharshi Karve Road, Mumbai - 400020,Baldota Bhavan, 117, Maharshi Karve Road, Mumbai - 400020,Bellary,Nagaland-583203 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr. Meda Venkataiah | (b)Designation (Owner/ Partner/ CEO) | Executive Director (Mines) | (c)Address | Baldota Bhavan, 117, Maharshi Karve Road, Mumbai - 400020,Baldota Bhavan, 117, Maharshi Karve Road, Mumbai - 400020,,Bellary,Karnataka-583203 | (d)Pin code | 583203 | (e)E-mail | medaoba@yahoo.com | (f)STD Code. | 8394(f)Telephone No. | 232002 | (g)Fax No. | 232333 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/KA/IND/27952/2015 | (d)Master Proposal Number(Single Window) | SW/91697/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey no. 295/2, 296/1, 296/2, 297, 298, 299/P, 2 | (b)Pincode | 583213 | (c)Bounded Latitudes (North) | | From | | Degree | 15.326200 | Minutes | | Second | | From | | Degree | 15.347906 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.202717 | Minutes | | Second | | From | | Degree | 76.232823 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 57 A/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 515 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 8.0 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Koppal | Koppal | | (2.) | Karnataka | Koppal | Koppal | | (3.) | Orissa | Jajpur | Sukinda | Sukurangi, Ostapal, Saruabil, Kamarda, Talangi | (4.) | Orissa | Jajpur | Sukinda | Sukurangi, Ostapal, Saruabil, Kamarda, Talangi | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/161/2015-IA-II(I) | (b)Date of Apply of TOR | 05 Jun 2015 | (c)Date of Issue of TOR / Standard ToR | 22 Jul 2015 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 28 May 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Adjacent to Plant site | State : | Karnataka | District : | Koppal | Tehsil : | Koppal | Village : | Halavarthi |
| 300 | Main issue related to land acquisition | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Integrated Steel Plant | 3.5 MTPA | -- | (2.) | Captive Power Plant | 295 MW | -- | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Pellet Plant with coal gasifier unit | 1200000 | Tons per Annum | | Road,Rail,Conveyor Belt | | (2.) | Ore Beneficiation Plant | 1200000 | Tons per Annum | | Road,Rail,Conveyor Belt | | (3.) | Coke Oven | 2100000 | Tons per Annum | | Road,Rail | | (4.) | SMS-BOF | 2340000 | Tons per Annum | | Road,Rail | | (5.) | BF Slag | 1131000 | Tons per Annum | | Road,Rail | | (6.) | Sinter Plant | 5090000 | Tons per Annum | | Road,Rail | | (7.) | Coal Washery | 3000000 | Tons per Annum | | Road,Rail,Conveyor Belt | | (8.) | Blast Furnace | 3800000 | Tons per Annum | | Road,Rail | | (9.) | SMS-EOF | 850000 | Tons per Annum | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 17979 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 800 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 107.56 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 15700400 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 15700400 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore fines (Beneficiation plant) | 1900000 | Tons per Annum | | Own captive mines & Purchase through E-Auction | Road,Rail | | 72 | Captive | | Copy of Linkage | (2.) | Iron ore fines (Sinter grade) | 4231000 | Tons per Annum | | Own captive mines & Purchase through E-Auction | Road,Rail | | 72 | Captive | | Copy of Linkage | (3.) | Iron ore lump (BF grade) | 615600 | Tons per Annum | | Own captive mines & Purchase through E-Auction | Road,Rail | | 72 | Captive | | Copy of Linkage | (4.) | Non Coking coal washery | 4300000 | Tons per Annum | | Through E-Auction or Open Market | Road,Rail | | 00 | e-auction | | Copy of Linkage | (5.) | Limestone | 613000 | Tons per Annum | | Satna/Maihyar/ import | Road,Rail | | 1100 | Open Market | | Copy of Linkage | (6.) | Dolomite | 149000 | Tons per Annum | | Baradwar/ Karnataka & Andhra | Road,Rail | | 1000 | Open Market | | Copy of Linkage | (7.) | Coking coal | 3263000 | Tons per Annum | | Import from Australia/ Indonesia | Rail,Others | Ship | 00 | Fuel Supply Agreement | | Copy of Linkage | (8.) | Non-coking coal for injection (BF) | 577800 | Tons per Annum | | Through E-Auction or Open Market | Road,Rail | | 00 | e-auction | | Copy of Linkage | (9.) | Quartzite | 51000 | Tons per Annum | | Local | Road | | 50 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2016 To 29 May 2016 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 56.5 | 36.9 | 55.3 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 24.4 | 8.4 | 21.5 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 28.3 | 17.9 | 27.6 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 33.4 | 15.1 | 31.6 | 80 | |
14.2. No. of Ground Water monitoring locations : 05 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.7 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 3 | 2 | 5 | 5 | (3.) | Fluoride | | | mg/l | | 0.3 | 0.1 | 1 | 1.5 | (4.) | TDS | | | mg/l | | 633.2 | 486.2 | 500 | 2000 | (5.) | Total Hardness | | | mg/l | | 789 | 272 | 200 | 600 | (6.) | Chlorides | | | mg/l | | 256.7 | 70.3 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 05 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.9 | 7.5 | A | (2.) | DO | | mg/l | | 6.8 | 5.6 | A | (3.) | BOD | | mg/l | | 29.0 | 15.0 | A | (4.) | COD | | mg/l | | 104.0 | 27.0 | A | |
14.4. No. of Ambient Noise monitoring locations : 09 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 45.8 | 40.9 | 55 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 46.9 | 41.9 | 65 | |
14.5. No. of Soil Sample Monitored locations : 05 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 182.3 | 112.2 | (2.) | Electric Conductivity | Others | mmhos/cm | 0.075 | 0.022 | (3.) | pH | | | 8.01 | 5.98 | (4.) | K(Potassium) | Kilogram per hectare | | 352.1 | 177.7 | (5.) | P(Phosphorus) | Kilogram per hectare | | 104.2 | 6.6 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.11 To 16.24 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.50 To 4.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 100080 | 9 | Copy of Permission Letter | Pipeline | | Others | Pumping | 775/B1/2008 | 23 Apr 2008 | 45000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | None | 00 | 00 | 00 | Others | NA | 00 | 00 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Undersize Coke | Industrial Waste | | 85200 | Tons | 0.0 | Pipe Conveyor | | Co-Processing | | (2.) | Acid sludge from by-product units | Industrial Waste | | 200 | Tons | 10 | Road | | Others | To be neutralized and disposed as landfill. | (3.) | Lime sludge from PCM | Industrial Waste | | 450 | Tons | 00 | Pipe Conveyor | | Co-Processing | | (4.) | Power Plant Fly Ash | Fly Ash | | 618118 | Tons | 5 | Road | | Others | Cement Plant | (5.) | Blast furnace granulated slag | Industrial Waste | | 1184506 | Tons | 5 | Road | | Others | Cement Plant | (6.) | Arising of skull/scrap | Industrial Waste | | 285512 | Tons | 0.2 | Road | | Others | Reuse | (7.) | Rejects after two stage WHIMS treatment | Industrial Waste | | 444188 | Tons | 30 | Road | | Others | nearby mines pits | (8.) | Refractory wastes | Industrial Waste | | 37729 | Tons | 0.5 | Road | | Others | landfill | (9.) | Iron Bearing dust | Industrial Waste | | 789649 | Tons | 0.2 | Pipe Conveyor | | Co-Processing | | (10.) | Steel making slag | Industrial Waste | | 474000 | Tons | 0.5 | Road | | Others | Ruse, road making etc. | (11.) | Coal/Coke dust | Industrial Waste | | 24507 | Tons | 0.0 | Pipe Conveyor | | Others | Reuse | (12.) | Tar sludge | Industrial Waste | | 496 | Tons | 0.5 | Road | | Co-Processing | | (13.) | Iron oxide | Industrial Waste | | 40000 | Tons | 5 | Road | | Others | Ferro Alloys Plants | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 28.5 | 2.0 | 4.06 | 32.57 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 24.4 | 0.5 | 2.16 | 26.57 | 80 | (3.) | NOx | | Microgram per Meter Cube | 33.4 | 1.5 | 3.95 | 37.36 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 56.5 | 0.5 | 4.06 | 60.57 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | COB-1 | Gas | 120 | 3.5 | PM10 | | 0.5 | (2.) | COB-1 | Gas | 120 | 3.5 | SO2 | | 4.9 | (3.) | COB-1 | Gas | 120 | 3.5 | NOx | | 6.11 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 366000 | (b)Source | Captive Source | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 00 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 776 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 776 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 00 | (b)Waste/Barren Land (ha.) | 776 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 00 | (e)Settlements (ha.) | 00 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 00 | (h)Mangroves (ha.) | 00 | (i)Marine Area (ha.) | 00 | (j)Others (ha.) : 00 | 00 | Total (ha.) | 776 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 337.7 | Steel Plant including CPP | (2.) | Green belt | | 256 | | (3.) | Water Reservoir | | 23.6 | | (4.) | Others | Road area, Rail track, future expansion etc. | 158.7 | Road area, Rail track, future expansion etc. | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 00 | Nil | (2.) | WLS | None | 00 | Nil | (3.) | NPA | None | 00 | Nil | (4.) | ESZs | None | 00 | Nil | (5.) | Corridors | None | 00 | Nil | (6.) | ESAs | None | 00 | Nil | (7.) | Wildlife Corridors | None | 00 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 00 | None | (2.) | Archaeological Sites | | None | 00 | None | (3.) | Defence Installations | | None | 00 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 00 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 373.19 | (b)Land yet to be acquired(Ha) | 402.81 | (c)Status of Land acquisition if not acquired | In process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tungabhadra Reservoir | (ii)Direction of Water Bodies in Buffer Area | South East | (iii)Distance of Water Bodies in Buffer Area | 9.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 1950 | (c)Temporary Employment- During Construction | 600 | (d)Temporary Employment- During Operation | 1211 | (e)No. of working days | 330 | (f)Total Manpower | 3811 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 256 | (b)Percentage of Total Project Area | 32.99 | (c)No. of Plants to be Planted | 409600 | (d)Funds Allocated for Plantation | 80000000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | MS scrap will be reused, Waste gases will be utilized to generate power, Greenbelt Development. | (2.) | Social | • Employment generation • Development of Infrastructure under CER | (3.) | Financial | Revenue generation in form of GST, IT and Other Taxes for State and Central Government. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Supreme Court of India | (c)Case No. | 23353 | (d)Orders/Directions of the court ,if any and its relevance with the proposed project | | (e)Case Details | A court case has been filled for 109.03 Acres of l | (f)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/1720/RA0101 | (ii)Name of the EIA Consultant | Pollution and Ecology Control Services (PECS) | (iii)Address | Near Dhantoli Police Station, Dhantoli Nagpur. | (iv)Mobile No. | 9373128182 | (v)Landline No. | 0712229322 | (vi)Email Id | pecs_nagpur@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 15 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | ToR was accorded on 22 July 2015. Thereafter, details of the validity extension of ToR has not been provided. | 01 Feb 2019 | 2. | NA | The correction have been made as per the instruction received | 01 Feb 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | submission of compliance's of points raised in MoM of 19th meeting of the Re-constituted EAC (Industry-I) held during 20-21st May, 2020 | 30 Apr 2021 | 2. | NA | Deferred for want of additional information | 28 May 2020 | 3. | ADS Reply Letter | AISL Compliance of ADS dated 18-05-2019 | 20 May 2019 | 4. | NA | • Document from competent authority indicating the land acquisition of 995.50 acres of land shall be furnished.
• Permission/approval from the competent authority for 20.93 MGD water drawl from Tungabhadra Reservoir shall be furnished. | 18 May 2019 | 5. | ADS Reply Letter | Revised EIA Report | 13 May 2019 | 6. | NA | Recommended | 27 Feb 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dr. Meda Venkataiah | Designation | Executive Director (Mines) | Name of Company (Applicant Name should not be given here) | AARESS Iron and Steel Limited | Address | Baldota Bhavan, 117, Maharshi Karve Road, Mumbai - 400020 |
|